# US 2015/0177814 A1 · Predictive power capping and power allocation to computing nodes in a rack-based information handling system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0177814 A1
- Document ID: US20150177814A1
- Status: Published application
- Kind: A1
- Application number: 14/139,765
- Filed: 2013-12-23
- Published: 2015-06-25
- Earliest claimed: 2013-12-23
- Assignees: Dell, Inc.
- Applicants: Dell, Inc.
- Inventors: EDMOND BAILEY; JOHN R. STUEWE; PAUL W. VANCIL; KUNRONG WANG; GERMAN FLOREZ-LARRAHONDO
- Web page: https://patentgrep.com/patent/US20150177814A1

## CPC

- G06F 1/3234: Power saving characterised by the action undertaken
- G06F 1/28: Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
- G06F 1/3206: Monitoring of events, devices or parameters that trigger a change in power modality
- G06F 1/3296: by lowering the supply or operating voltage
- G06F 1/3287: by switching off individual functional units in the computer system
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A computer-implemented method enables rack-level predictive power capping and power budget allocation to processing nodes in a rack-based IHS. A rack-level management controller receives node-level power-usage data and settings from several block controllers, including current power consumption and an initial power budget for each node. A power consumption profile is generated based on the power-usage data for each node. A total available system power of the IHS is identified. A system power cap is determined based on the power consumption profiles and the total available system power. A current power budget is determined for each node based on an analysis of at least one of the power consumption profile, the initial power budget, the current power consumption, the system power cap, and the total available system power. A power subsystem regulates power budgeted and supplied to each node based on the power consumption profiles and the system power cap.

## Claims

### Claim 1

A computer-implemented method to implement rack-level predictive power capping and power budget allocation to processing nodes in a rack-based information handling system (IHS), the method comprising:
receiving, at a rack-level management controller, a plurality of node-level power-usage data and settings from a plurality of block controllers, including a current power consumption and an initial power budget, for each processing node within the IHS;
generating a power consumption profile based on the power-usage data for each of the processing nodes;
identifying a total available system power of the IHS;
determining a system power cap for the IHS based on the power consumption profiles and the total available system power:
determining a current power budget for each of the processing nodes based on an analysis of at least one of the power consumption profile, the initial power budget, the current power consumption, the system power cap, and the total available system power; and
triggering a power subsystem of the IHS to regulate an amount of power budgeted and supplied to each of the processing nodes of the IHS based on the power consumption profiles and the system power cap.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
initializing the management controller during start-up configuration of the IHS;
establishing communication between the management controller, the power subsystem, and the block controllers, which each control block-level operations of processing nodes within a corresponding block;
triggering the block controllers to regulate an amount of power supplied to each of the processing nodes within an associated block based on the current power budget allocated to each of the processing nodes within the associated block;
tracking, via the block controllers, the power-usage data and settings for the processing nodes within the associated block; and
transmitting the power-usage data and settings from the block controllers to the management controller.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
detecting a current power consumption by a first processing node within the IHS;
determining if an increase in the current power consumption has occurred for the first processing node;
in response to determining that an increase in the current power drawn has occurred for the first processing node, determining if the required power to operate all of the processing nodes at current consumption levels is approaching the system power cap; and
in response to determining that the current power consumption by all of the processing nodes is less than the system power cap: increasing the power budget of the first processing node to a new power budget and providing a corresponding increase in the first power allocation to the first processing node; and re-adjusting the power allocation across the IHS based on the new power budget.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
determining if any of the processing nodes are using less than a pre-determined amount of their current power budget allocation over a minimum established period of time; and
in response to determining that at least one second processing node is using less than the pre-determined amount of its current power budget allocation:
increasing the power budget of the first processing node to create the new power budget; and
re-apportioning at least a portion of an unused power amount from the current power budget allocated to the at least one second processing node to provide a second, higher power budget allocated to the first processing node based on the new power budget.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
storing the power consumption profiles within a power consumption history table in a persistent storage device.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
identifying a decrease in the current power consumption for the first processing node;
tracking a period of time over which the decrease in the power consumption occurs;
in response to the period of time not exceeding a pre-established power budget adjustment time (PBAT) threshold, maintaining the current power budget allocated to the first processing node; and
in response to the period of time exceeding the pre-established PBAT threshold:
reducing a value of the current power budget of the first processing node to generate a new power budget; and
triggering the power subsystem of the IHS to provide a second power allocation for the first processing node based on the new power budget.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
determining the decrease in the current power budget for the first processing node; and
increasing the available amount of power within the system power cap by an amount corresponding to the decrease in the current power budget for the first processing node.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
determining a new power budget to allocate to one or more of the processing nodes based on the increase in the available amount of power within the system power cap; and
triggering the power subsystem of the IHS to provide the new power budget to the one or more processing nodes.

### Claim 9 (depends on 1)

The method of claim 1, wherein:
the IHS includes a plurality of power supply units (PSU) each capable of providing a pre-determinable amount of power for use by the components of the IHS and each coupled to and controlled by a power controller; and
the method further comprises:
determining a number of PSUs from the plurality of PSUs that are required to be utilized to provide the system power cap;
in response to the number of PSUs required to provide the system power cap being less than a total number of PSUs, autonomously shutting off one or more of a remaining PSUs that are not required to provide the system power cap;
in response to determining that the current power consumption across the IHS exceeds a pre-established maximum percentage of the system power cap for more than a minimum pre-established threshold period of time, while there are one or more PSUs turned off, turning on at least one of the one or more PSUs to enable an increase in the system power cap and a corresponding increase in one or more allocated power budgets based on power usage factors;
wherein turning on and off of one or more PSUs is performed based on an efficiency evaluation to enable efficient use of the plurality of PSUs;
in response to determining that the current power consumption across the IHS is greater than the pre-established maximum percentage of the system power cap, when all available PSUs are turned on, power capping the operations of one or more processing nodes; and
in response to a failure of one or more of the PSUs reducing a total amount of the available power to below the system power cap, automatically reducing the system power cap and concurrently reducing one or more allocated power budgets based on an analysis of historical usage per processing node and other factors.

### Claim 10 (depends on 9)

The method of claim 9, wherein automatically reducing the system power cap in response to a failure of one or more of the PSUs comprises: generating a signal on a global throttle wire allocated within each Ethernet cable directly connecting each of the block controllers within the IHS with the management controller, wherein the block controllers within the IHS are pre-programmed to respond to an assertion of a signal on the global throttle wire by immediately reducing the current power consumption of one or more processing nodes within a respective block being controlled by the block controller.

### Claim 11 (depends on 9)

The method of claim 9, wherein turning on at least one of the one or more power supplies to enable an increase in the system power cap comprises:
maintaining a current system power cap while the at least one PSU is being turned on; and
initiating the increase in the system power cap and subsequent increase in the allocated power budgets only after the at least one PSU has completely turn on and is supplying additional power.

### Claim 12

An information handling system (IHS) comprising:
one or more blocks, the blocks having at least one block controller and each of the blocks having one or more functional components including one or more processing nodes, the block controllers each controlling block-level operations of the processing nodes within a corresponding block;
a rack-level management controller having a processor and a memory coupled to the processor, the rack-level management controller communicatively coupled to the block controllers and the processing nodes via the block controllers;
a power subsystem communicatively coupled to the rack-level management controller and providing power distribution to a plurality of the functional component of the IHS;
the rack-level management controller having firmware executing thereon to enable rack level predictive power allocation in a rack-configured IHS, wherein the firmware configures the rack-level management controller to:
receive a plurality of node-level power-usage data and settings from a plurality of block controllers, including a current power consumption and an initial power budget, for each processing node within the IHS;
generate a power consumption profile based on the power-usage data for each of the processing nodes;
identify a total available system power of the IHS;
determine a system power cap for the IHS based on the power consumption profiles and the total available system power;
determine a current power budget for each of the processing nodes based on an analysis of at least one of the power consumption profile, the initial power budget, the current power consumption, the system power cap, and the total available system power; and
trigger a power subsystem of the IHS to regulate an amount of power budgeted and supplied to each of the processing nodes of the IHS based on the power consumption profiles and the system power cap.

### Claim 13 (depends on 12)

The information handling system of claim 12, further comprising
initializing the rack-level management controller during start-up configuration of the IHS;
the block controllers having firmware executing thereon, wherein the firmware configures the block controllers to:
regulate an amount of power supplied to each of the processing nodes within an associated block based on the current power budget allocated to each of the processing nodes within the associated block;
track the power-usage data and settings for the processing nodes within the associated block; and
transmit the power-usage data and settings from the block controllers to the management controller.

### Claim 14 (depends on 12)

The information handling system of claim 12, further comprising:
a first block controller detecting a current power consumption by a first processing node within the IHS and the first block controller determining if an increase in the current power consumption has occurred for the first processing node;
in response to the first block controller determining that an increase in the current power drawn has occurred for the first processing node, the firmware further configures the rack-level management controller to:
determine if the required power to operate all of the processing nodes at current consumption levels is approaching the system power cap; and
in response to determining that the current power consumption by all of the processing nodes is less than the system power cap: increasing the power budget of the first processing node to a new power budget and providing a corresponding increase in the first power allocation to the first processing node; and re-adjusting the power allocation across the IHS based on the new power budget.

### Claim 15 (depends on 12)

The information handling system of claim 12, wherein the firmware further configures the rack-level management controller to:
determine if any of the processing nodes are using less than a pre-determined amount of their current power budget allocation over a minimum established period of time; and
in response to determining that at least one second processing node is using less than the pre-determined amount of its current power budget allocation:
increase the power budget of the first processing node to create the new power budget; and
re-apportion at least a portion of an unused power amount from the current power budget allocated to the at least one second processing node to provide a second, higher power budget allocated to the first processing node based on the new power budget.

### Claim 16 (depends on 12)

The information handling system of claim 12, wherein the firmware further configures the rack-level management controller to:
store the power consumption profiles within a power consumption history table in a persistent storage device.

### Claim 17 (depends on 12)

The information handling system of claim 12, wherein the firmware further configures the rack-level management controller to:
identify a decrease in the current power consumption for the first processing node;
track a period of time over which the decrease in the power consumption occurs;
in response to the period of time not exceeding a pre-established power budget adjustment time (PBAT) threshold, maintaining the current power budget allocated to the first processing node; and
in response to the period of time exceeding the pre-established PBAT threshold:
reduce a value of the current power budget of the first processing node to generate a new power budget; and
trigger the power subsystem of the IHS to provide a second power allocation for the first processing node based on the new power budget.

### Claim 18 (depends on 17)

The information handling system of claim 17, wherein the firmware further configures the rack-level management controller to:
determine the decrease in the current power budget for the first processing node; and
increase the available amount of power within the system power cap by an amount corresponding to the decrease in the current power budget for the first processing node.

### Claim 19 (depends on 18)

The information handling system of claim 18, wherein the firmware further configures the rack-level management controller to:
determine a new power budget to allocate to one or more of the processing nodes based on the increase in the available amount of power within the system power cap; and
trigger the power subsystem of the IHS to provide the new power budget to the one or more processing nodes.

### Claim 20 (depends on 12)

The information handling system of claim 12, wherein:
the IHS includes a plurality of power supply units (PSU) each capable of providing a pre-determinable amount of power for use by the components of the IHS and each coupled to and controlled by a power controller; and
the firmware further configures the rack-level management controller to:
determine a number of PSUs from the plurality of PSUs that are required to be utilized to provide the system power cap;
in response to the number of PSUs required to provide the system power cap being less than a total number of PSUs, autonomously shut off one or more of a remaining PSUs that are not required to provide the system power cap;
in response to determining that the current power consumption across the IHS exceeds a pre-established maximum percentage of the system power cap for more than a minimum pre-established threshold period of time, while there are one or more PSUs turned off, turn on at least one of the one or more PSUs to enable an increase in the system power cap and a corresponding increase in one or more allocated power budgets based on power usage factors;
wherein turning on and off of one or more PSUs is performed based on an efficiency evaluation to enable efficient use of the plurality of PSUs;
in response to determining that the current power consumption across the IHS is greater than the pre-established maximum percentage of the system power cap, when all available PSUs are turned on, power cap the operations of one or more processing nodes; and
in response to a failure of one or more of the PSUs reducing a total amount of the available power to below the system power cap, automatically reduce the system power cap and concurrently reduce one or more allocated power budgets based on an analysis of historical usage per processing node and other factors.

### Claim 21 (depends on 20)

The information handling system of claim 20, wherein automatically reducing the system power cap in response to a failure of one or more of the PSUs causes the firmware to further configure the rack-level management controller to:
generate a signal on a global throttle wire allocated within each Ethernet cable directly connecting each of the block controllers within the IHS with the management controller, wherein the block controllers within the IHS are pre-programmed to respond to an assertion of a signal on the global throttle wire by immediately reducing the current power consumption of one or more processing nodes within a respective block being controlled by the block controller.

### Claim 22 (depends on 20)

The information handling system of claim 20, wherein turning on at least one of the one or more power supplies to enable an increase in the system power cap causes the firmware to further configure the rack-level management controller to:
maintain a current system power cap while the at least one PSU is being turned on; and
initiate the increase in the system power cap and subsequent increase in the allocated power budgets only after the at least one PSU has completely turn on and is supplying additional power.