# US 2015/0177798 A1 · Configurable power supplies for dynamic current sharing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0177798 A1
- Document ID: US20150177798A1
- Status: Published application
- Kind: A1
- Application number: 14/138,550
- Filed: 2013-12-23
- Published: 2015-06-25
- Earliest claimed: 2013-12-23
- Assignees: Intel Corporation
- Inventors: Sandeep K. Venishetti; Sanjeev S. Jahagirdar; Srinivas Thota
- Web page: https://patentgrep.com/patent/US20150177798A1

## CPC

- G06F 1/189: {Power distribution}
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- G06F 1/263: {Arrangements for using multiple switchable power supplies, e.g. battery and AC (G06F1/30 takes precedence)}
- G06F 1/3287: by switching off individual functional units in the computer system
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

An apparatus includes a distribution network that includes circuitry configured to receive first power from a first voltage source and second power from a second voltage source, and to deliver power to each of a plurality of electronic circuitry blocks (ECBs), including to deliver first ECB power to a first ECB and second ECB power to a second ECB. The first ECB power includes a first portion of the first power and a first portion of the second power. The apparatus also includes power management logic to dynamically adjust the power to be provided to each ECB. Responsive to a change in a first activity level of the first ECB, the power management logic is to change the first ECB power by adjustment of the first portion of the first power and adjustment of the first portion of the second power. Other embodiments are described and claimed.

## Claims

### Claim 1

An apparatus comprising:
a distribution network comprising circuitry configured to:
receive first power from a first source and second power from a second source; and
provide, to a first electronic circuitry block (ECB), first ECB power, and provide, to a second ECB, second ECB power, wherein the first ECB power includes a first portion of the first power and a first portion of the second power and the second ECB power includes a second portion of the first power and a second portion of the second power; and
power management logic configured to adjust the first ECB power responsive to a change in a first activity level associated with the first ECB, wherein the power management logic is to dynamically change the first ECB power by adjustment of the first portion of the first power and adjustment of the first portion of the second power.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein the distribution network includes a first multiplexer to receive the first power from the first source and the first multiplexer is configured to provide the first portion of the first power to the first ECB and the second portion of the first power to the second ECB.

### Claim 3 (depends on 2)

The apparatus of claim 2, wherein the distribution network further includes a second multiplexer that is configured to receive the second power from the second source and to provide a first portion of the second power to the first ECB and a second portion of the second power to the second ECB.

### Claim 4 (depends on 1)

The apparatus of claim 1, wherein when the first portion of the first ECB power is reduced, the distribution network is to provide additional power to another ECB responsive to a request from the other ECB to increase supplied power to the other ECB.

### Claim 5 (depends on 1)

The apparatus of claim 1, wherein the change in the first ECB power is accomplished by a change in first current provided to the first ECB while a first voltage to the first ECB is maintained at a substantially constant value.

### Claim 6 (depends on 1)

The apparatus of claim 1, wherein the power management logic includes storage to store corresponding configuration parameters for each ECB, the configuration parameters associated with operating parameters of at least one of the first ECB and the second ECB including operating frequency of the corresponding ECB.

### Claim 7 (depends on 1)

The apparatus of claim 1, wherein each of the first source and the second source comprises a corresponding voltage regulator to provide a corresponding voltage that has a substantially constant value during each time period in which the first activity level and a second activity level associated with the second ECB are unchanged.

### Claim 8 (depends on 1)

The apparatus of claim 1, wherein the power management logic includes power control logic to receive an indicator of the first activity level from the first ECB, and to determine the first ECB power based at least in part on the first ECB activity level.

### Claim 9 (depends on 1)

The apparatus of claim 1, wherein the power management logic includes power control logic to determine a first voltage to be provided to the first ECB based at least in part on an initial frequency of operation of the first ECB.

### Claim 10 (depends on 1)

The apparatus of claim 1, wherein the power management logic is to periodically poll the first ECB to determine whether the first activity level has changed.

### Claim 11 (depends on 10)

The apparatus of claim 10, wherein the first activity level is polled at a period that is less than or equal to approximately 20 microseconds.

### Claim 12 (depends on 1)

The apparatus of claim 1, wherein the first ECB includes at least one of a processor core, a portion of a processor core, a graphics processing unit, a memory, and a controller.

### Claim 13

A machine-readable medium having stored thereon instructions, which if performed by a machine cause the machine to perform a method comprising:
distributing first power received from a first source to each of a plurality of electronic circuitry blocks (ECBs) of a system on a chip (SOC), and distributing second power received from a second source to each of the plurality of ECBs; and
responsive to a change in a first activity level associated with a first ECB of the plurality of ECBs, redistributing the first power and the second power among the plurality of ECBs.

### Claim 14 (depends on 13)

The machine-readable medium of claim 13, further including additional instructions to cause the machine to initiate a change of a magnitude of output voltage of one or more of the sources, responsive to the change in the first activity level exceeding an activity change threshold.

### Claim 15 (depends on 13)

The machine-readable medium of claim 13, wherein redistribution of the power comprises a change in magnitude of respective currents provided to two or more of the ECBs, wherein a first portion of each respective current is provided by the first source and a second portion of each respective current is provided by the second source.

### Claim 16 (depends on 13)

The machine-readable medium of claim 13, further comprising instructions to cause the machine to redistribute the first power and the second power between the first ECB and a second ECB of the plurality of ECBs by redistribution of current from the first source and the second source, based at least in part on an updated first activity level that is associated with the first ECB.

### Claim 17 (depends on 16)

The machine-readable medium of claim 16, further including instructions to cause the machine to throttle operation of at least one of the first ECB and the second ECB when a total requested power exceeds a sum of the first power and the second power, wherein the total requested power is based on the first activity level and a second activity level associated with the second ECB.

### Claim 18

A system comprising:
power management logic to:
allocate power provided by a plurality of power sources to each of a plurality of electronic circuitry blocks (ECBs), wherein each of the plurality of power sources is to provide a respective portion of the power that is allocated among two or more of the ECBs;
receive an indication of a corresponding activity level from each of at least one of the plurality of ECBs;
responsive to a change in the activity level of one of the ECBs,
dynamically reallocate the power to the plurality of ECBs; and
memory to store configuration information for each ECB.

### Claim 19 (depends on 18)

The controller of claim 18, wherein the power management logic is to dynamically reallocate the power responsive to satisfaction of an activity change threshold by a first activity level associated with a first ECB of the plurality of ECBs.

### Claim 20 (depends on 19)

The controller of claim 19, wherein the power management logic is to dynamically reallocate the power by determination of a corresponding updated power portion to be provided to each ECB of the plurality of ECBs by each of the power sources, wherein the updated power portions are determined for a defined time period.
