# US 2015/0176758 A1 · System and Method for Performing an Operation in at Least Two Individually Trasnported Work Spaces

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0176758 A1
- Document ID: US20150176758A1
- Status: Published application
- Kind: A1
- Application number: 14/579,570
- Filed: 2014-12-22
- Published: 2015-06-25
- Earliest claimed: 2013-12-23
- Inventors: Peter NICHOLSON; Sean LYNCH
- Web page: https://patentgrep.com/patent/US20150176758A1

## CPC

- B60P 3/14: the object being a workshop for servicing, for maintenance, or for carrying workmen during work (lifting devices for movable platforms or cabins for workmen B66F11/04)
- B23P 21/004: {the units passing two or more work-stations whilst being composed}
- F16L 58/00: Protection of pipes or pipe fittings against corrosion or incrustation (compound tubes F16L9/14)
- B60P: VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS (vehicles with special provisions for transporting patients or disabled persons, or their personal conveyances A61G3/00)
- B23P: METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS (arrangements for copying or controlling B23Q)
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL

## Abstract

A system including a first transportable element having a first work space; and a second transportable element having a second work space, wherein the first and second work spaces each contain a portion of an equipment, wherein all of the equipment is contained in the first and second work spaces, and wherein the first and second work spaces are alignable with one another at a worksite such that the equipment can perform an assembly operation at the worksite, the assembly operation including performance of at least one step performed in the first work space and at least one step performed in the second work space.

## Claims

### Claim 1

A system comprising:
a first transportable element comprising a first work space; and
a second transportable element comprising a second work space, wherein:
the first and second work spaces each contain a portion of an equipment,
all of the equipment is contained in the first and second work spaces, and
the first and second work spaces are alignable with one another at a worksite such that the equipment can perform an assembly operation at the worksite, the assembly operation including performance of at least one step performed in the first work space and at least one step performed in the second work space.

### Claim 2 (depends on 1)

The system according to claim 1, wherein at least one of the first and second transportable elements includes a housing enclosing the first or second work space, respectively.

### Claim 3 (depends on 2)

The system according to claim 2, wherein the housing further comprises:
an aperture; and
a door adapted to selectively close the aperture

### Claim 4 (depends on 3)

The system according to claim 3, wherein the aperture is sized to accommodate transverse passage of pipe segment into the work space

### Claim 5 (depends on 1)

The system according to claim 1, further comprising an engagement component adapted to secure the first and second transportable elements together.

### Claim 6 (depends on 1)

The system according to claim 1, further comprising:
an alignment component adapted to assist in aligning the first and second work spaces with respect to one another.

### Claim 7 (depends on 1)

The system according to claim 1, wherein:
the first transportable element further comprises an adjustable system supporting the first work space and adapted to permit movement of the first work space with respect to a carriage of the first transportable element;
the second transportable element further comprises an adjustable system supporting the second work space and adapted to permit movement of the second work space with respect to a carriage of the second transportable element; or
a combination thereof.

### Claim 8 (depends on 1)

The system according to claim 1, wherein at least one of the first and second transportable elements further includes selectively deployable outriggers.

### Claim 9 (depends on 1)

The system according to claim 1, wherein at least one of the first and second transportable elements further comprises:
a lifting system adapted to move an object from a first elevation to an elevation of the equipment, the first elevation being different than the elevation of the equipment.

### Claim 10 (depends on 1)

The system according to claim 1, wherein the equipment comprises a pipe cladding assembly, wherein a portion of the pipe cladding assembly disposed in the first work space comprises a welding carriage, and wherein a portion of the pipe cladding assembly disposed in the second work space comprises a pipe rotator.

### Claim 11

A mobile pipe cladding system comprising:
a first mobile platform comprising a first work space; and
a second mobile platform comprising a second work space,
wherein the first work space and the second workspace together comprise a workcell,
wherein at least one pipe cladding component is disposed within the workcell, and
wherein the first mobile platform and the second mobile platform are configured to be aligned and leveled.

### Claim 12 (depends on 11)

The system according to claim 11, wherein at least one of the first and second work spaces is enclosed.

### Claim 13 (depends on 11)

The system according to claim 11, further comprising an engagement component adapted to secure the first and second mobile platforms together.

### Claim 14 (depends on 13)

The system according to claim 13, wherein the engagement component comprises a clamp, a threaded fastener, a ratcheting system, or any combination thereof.

### Claim 15 (depends on 11)

The system according to claim 11, further comprising an alignment component adapted to assist in aligning the first and second work spaces with respect to one another, wherein the alignment component comprises a laser system, a mechanical indicator, an electrical indicator, an electro-mechanical indicator, or any combination thereof.

### Claim 16 (depends on 11)

The system according to claim 11, wherein:
the first mobile platform further comprises an adjustable system supporting the first work space and adapted to permit movement of the first work space with respect to a carriage of the first mobile platform;
the second mobile platform further comprises an adjustable system supporting the second work space and adapted to permit movement of the second work space with respect to a carriage of the second mobile platform; or
a combination thereof.

### Claim 17 (depends on 11)

The system according to claim 11, wherein at least one of the first and second mobile platforms further comprises:
a pipe lifting system adapted to move pipe from a first elevation to an elevation of the pipe cladding assembly, the first elevation being different than the elevation of the pipe cladding assembly.

### Claim 18

A method of deploying a mobile pipe cladding system at a work site comprising:
providing a first mobile platform including a first work space and a second mobile platform including a second work space, the first and second work spaces each containing a portion of equipment;
aligning the first and second mobile platforms at a fixed relative location with respect to one another such that longitudinal ends of the first and second mobile platforms are disposed adjacent to one another; and
coupling the first and second mobile platforms together at the fixed relative location with respect to one another using an engagement component.

### Claim 19 (depends on 18)

The method according to any claim 18, further comprising:
individually transporting the first and second mobile platforms to the worksite.

### Claim 20 (depends on 18)

The method according to claim 18, further comprising:
deploying at least one outrigger of the first or second mobile platforms after aligning the first and second mobile platforms.
