# US 2015/0176378 A1 · Screened Production Sleeve for Multilateral Junctions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0176378 A1
- Document ID: US20150176378A1
- Status: Published application
- Kind: A1
- Application number: 14/138,771
- Filed: 2013-12-23
- Published: 2015-06-25
- Earliest claimed: 2013-12-23
- Assignees: Baker Hughes Incorporated
- Inventors: Mark E. Ramey, JR.; Bryan P. Pendleton; Joseph Sheehan
- Web page: https://patentgrep.com/patent/US20150176378A1

## CPC

- E21B 43/08: Screens or liners {(expandable screens or liners E21B43/108)}
- E21B 41/0035: {Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches}
- E21B 41/0042: {characterised by sealing the junction between a lateral and a main bore}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

In one aspect, a wellbore system is disclosed that in one non-limiting embodiment includes a first wellbore capable of producing a fluid from a first formation, a second wellbore intersecting the first wellbore at a junction, wherein the second wellbore is an open hole and capable of producing a fluid from a second formation and a sand screen at the junction configured to inhibit particles larger than a selected size from flowing from the second wellbore and the junction into the first wellbore.

## Claims

### Claim 1

The wellbore system, comprising:
a first wellbore;
a second wellbore intersecting the first wellbore at a junction;
a sand screen configured to inhibit flow of particles larger than a selected size from the junction to one of the first wellbore and the second wellbore.

### Claim 2 (depends on 1)

The wellbore system of claim 1, wherein the junction is exposed to a formation.

### Claim 3 (depends on 1)

The wellbore system of claim 1, wherein the sand screen is disposed proximate to the junction.

### Claim 4 (depends on 1)

The wellbore system of claim 1, wherein the sand screen is disposed as one of: in the first wellbore; in the second wellbore; and partially in the first wellbore and partially in the second wellbore.

### Claim 5 (depends on 1)

The wellbore system of claim 1 further comprising a liner that directs flow of a fluid from the junction toward the sand screen.

### Claim 6 (depends on 5)

The wellbore system of claim 5, wherein the liner is disposed as one of: from a location in the first wellbore to a location in the second wellbore; in the first wellbore; in the second wellbore; and partially in the first wellbore and partially in the second wellbore.

### Claim 7 (depends on 1)

The wellbore system of claim 1 further comprising:
a production tubular in the first wellbore having an opening facing the second wellbore at the junction; and
wherein the sand screen is deployed in the production tubular between a first location uphole of the junction to second location downhole of the junction.

### Claim 8 (depends on 7)

The wellbore system of claim 7 further comprising: a first seal between the tubular and the sand screen proximate to a lower end of the device and a second seal proximate to an upper end of the sand screen.

### Claim 9 (depends on 8)

The wellbore system of claim 8, wherein the second wellbore includes a flow control device that controls flow of a formation fluid into the second wellbore.

### Claim 10 (depends on 1)

The wellbore system of claim 1 further comprising a first seal between a production tubular in the first wellbore and a casing in the first wellbore uphole of the junction and a second seal between the production tubular and the casing downhole of the junction to enable fluid from the second wellbore and the junction to flow through the sand screen.

### Claim 11 (depends on 1)

The wellbore system of claim 1, wherein one of the first wellbore and the second wellbore is a cased wellbore and the other of the first wellbore and the second wellbore is an open hole.

### Claim 12 (depends on 1)

The wellbore system of claim 1 further comprising a flow control device inside the sand screen that controls flow of the fluid from the second wellbore into the first wellbore.

### Claim 13 (depends on 12)

The wellbore system of claim 12, wherein the flow control device is selected from a group consisting of: a valve, an inflow control device having a tortuous fluid flow path;
and a device that inhibits flow of water compared to the flow of oil or gas.

### Claim 14

A method of forming a wellbore, comprising:
forming a first wellbore;
forming a second wellbore intersecting the first wellbore at a junction; and
placing a sand screen configured to inhibit particles larger than a selected size from flowing from the junction into one of the first wellbore and the second wellbore.

### Claim 15 (depends on 14)

The method of claim 14 further comprising providing a casing in the first wellbore and exposing the junction to a formation.

### Claim 16 (depends on 14)

The method of claim 14 further comprising: placing a liner that directs fluid to flow from the junction to one of the first wellbore and second wellbore.

### Claim 17 (depends on 14)

The method of claim 14 further comprising:
placing a production tubular in the first wellbore having an opening facing the second wellbore at the junction; and
wherein placing the sand screen comprises placing the sand screen in the production tubular between a first location uphole of the junction to a second location downhole of the junction in the tubular.

### Claim 18 (depends on 17)

The method of claim 17 further comprising providing a first seal between the production tubular and the sand screen and a second seal between the production tubular and the sand screen to inhibit flow of fluid from the second wellbore to outside of the sand screen.

### Claim 19 (depends on 18)

The method of claim 18 further comprising providing a first seal between the production tubular and the first wellbore uphole of the junction and a second seal between the production tubular and the first wellbore downhole of the junction to enable the fluid from the second wellbore and the junction to flow through the sand screen.

### Claim 20 (depends on 14)

The method of claim 14, wherein the second wellbore is an open hole.

### Claim 21 (depends on 14)

The method of claim 14 further comprising providing a flow control device inside the sand screen that controls flow of the fluid from the second wellbore into the first wellbore.

### Claim 22

The method of 21, wherein the flow control device is selected from a group consisting of: a sleeve valve, an inflow control device having a tortuous fluid path; a device that inhibits flow of water compared to the flow of oil or gas.
