# US 2015/0176346 A1 · Method and system for wireline intervention in a subsea well from a floating vessel

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0176346 A1
- Document ID: US20150176346A1
- Status: Published application
- Kind: A1
- Application number: 14/369,392
- Filed: 2012-12-19
- Published: 2015-06-25
- Earliest claimed: 2011-12-29
- Assignees: Shell Oil Company
- Applicants: Shell Oil Company
- Inventors: Collin Morris; Martin Buchan; David Russ Larimore; Nivea Boechat Dos Santos Gloria; Gustavo Cervo; Scott Winfield Davis; Scott Alistair Gordon; Mark James Klein; Marc Gerard Paquette
- Web page: https://patentgrep.com/patent/US20150176346A1

## CPC

- E21B 19/006: {including heave compensators}
- B66D 1/505: {electrical}
- E21B 17/003: {with electrically conducting or insulating means (E21B17/028 and E21B17/023 take precedence)}
- E21B 17/01: Risers
- E21B 19/02: Rod or cable suspensions
- E21B 19/09: specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string
- E21B 19/155: {Handling between horizontal and vertical position}
- E21B 47/017: Protecting measuring instruments
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- B66D: CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS (winding or unwinding ropes or cables for feeding or storage purposes B65H; rope or cable winding or unwinding mechanisms for lifts B66B)

## Abstract

A method for wireline intervention in subsea well from a floating vessel.

## Claims

### Claim 1

A method for wireline intervention in an subsea well from a floating vessel, the method comprising:
a) arranging a tubular tool riser in a substantially horizontal position at a deck of the vessel;
b) connecting a wireline assembly to a wireline that is connected to a winch arranged at the deck;
c) inserting the wireline assembly and pass the wireline through a first end of the tool riser into said riser such that the wireline passes along a riser sheave connected to the first end of the tool riser;
d) connecting the first end of the tool riser to a crane that lifts the tool riser in a substantially vertical position above the deck, whilst unreeling the wireline from the winch such that the wireline assembly remains located within the tool riser;
e) inducing the crane to move a second end of the tool riser above a guide sleeve which is connected to a side wall of the vessel adjacent to the deck;
f) inducing the crane to lower the tool riser through the guide sleeve such that the second end of the tool riser is located subsea and the first end of the tool riser and the riser sheave are located above the deck; and
g) inducing a crane heave compensation mechanism to control the motion of the tool riser and riser sheave relative to the seafloor while unreeling the wireline from the winch such that the wireline assembly is lowered from the tool riser through the water into the well.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first end of the tool riser is connected by a hoisting cable to a hook which is connected to a fall line of the crane.

### Claim 3 (depends on 2)

The method of claim 2, wherein the hook is connected to a single fall line of the crane and the crane heave compensation mechanism is configured to maintain the hook substantially stationary relative to the seafloor, thereby providing heave compensation to the wireline assembly.

### Claim 4 (depends on 2)

The method of claim 2, wherein wireline passes through a deck sheave which is connected to the deck adjacent to the sleeve and the hook is connected to a hoisting sheave which is connected by a double fall crane line to the crane and the heave compensation mechanism is configured to substantially halve reduce heave motion of the hook relative to heave motion of the vessel and inducing the deck sheave and riser sheave to provide heave compensation to the wireline assembly.

### Claim 5 (depends on 1)

The method of claim 1, wherein the wireline assembly is inserted into an subsea oil and/or gas production well to monitor the condition of downhole well equipment and of the oil and/or gas containing formation surrounding the well and/or to monitor, manage and/or optimize downhole fluid flow through the formation and the well and/or to alter the state of the well and/or well geometry during, or at the end of its productive life.

### Claim 6 (depends on 5)

The method of claim 5, wherein the wireline assembly is first lowered into the well and subsequently pulled up through the well at a predetermined speed by winching up the wireline while activating monitoring equipment in the wireline assembly.

### Claim 7

A system for wireline intervention into an subsea well from a floating vessel, the system comprising:
a) a floating vessel having a deck configured to support a tubular tool riser in a substantially horizontal position;
b) a winch at the deck which is configured to be connected to a wireline and wireline assembly;
c) means for inserting the wireline assembly and part the wireline through a first end of the tool riser into said riser such that the wireline passes along a riser sheave connected to the first end of the tool riser;
d) a crane that is configured to be connected to the first end of the tool riser and to lift the the tool riser in a substantially vertical position above the deck, whilst unreeling the wireline from the winch such that the wireline assembly remains located within the tool riser;
e) means for inducing the crane to move a second end of the tool riser above a guide sleeve which is connected to a side wall of the vessel adjacent to the deck;
f) a crane control mechanism for inducing the crane to lower the tool riser through the guide sleeve such that the second end of the tool riser is located subsea and the first end of the tool riser and the riser sheave are located above the deck; and
g) a crane heave compensation mechanism for controlling the motion of the tool riser and riser sheave relative to the seafloor while unreeling the wireline from the winch such that the wireline assembly is lowered from the tool riser through the water into the well.

### Claim 8 (depends on 7)

The system of claim 7, wherein the first end of the tool riser is connected by a hoisting cable to a hook which is connected to a fall line of the crane.

### Claim 9 (depends on 8)

The system of claim 8, wherein the hook is connected to a single fall line of the crane and the heave compensation mechanism is configured to maintain the the hook substantially stationary relative to the seafloor, thereby providing heave compensation to the wireline assembly.

### Claim 10 (depends on 8)

The system of claim 8, wherein wireline passes through a deck sheave which is connected to the deck adjacent to the sleeve and the hook is connected to a hoisting sheave which is connected by a double fall crane line to the crane and the heave compensation mechanism is configured to substantially halve reduce heave motion of the hook relative to heave motion of the vessel and inducing the deck sheave and riser sheave to provide heave compensation to the wireline assembly.