# US 2015/0149246 A1 · Projected maintenance revenue for future time periods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0149246 A1
- Document ID: US20150149246A1
- Status: Published application
- Kind: A1
- Application number: 14/088,463
- Filed: 2013-11-25
- Published: 2015-05-28
- Earliest claimed: 2013-11-25
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Edward Cannon; Sue Lynn Chong; John J. Dillon; Dawn M. Fritz; Kurt W. Mueller; Nitin Singhal
- Web page: https://patentgrep.com/patent/US20150149246A1

## CPC

- G06Q 30/0202: Market predictions or forecasting for commercial activities
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A computing device receives a first user input requesting an estimated revenue for a projected time period. The computing device receives a second user input. The computing device determines an expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts and an expected revenue for the projected time period from warranty upgrades on units based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate and the warranty option upgrade rate. The computing device determines a total expected revenue for the projected time period based on at least the computing device determining the expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts and the expected revenue for the projected time period from warranty upgrades on installed units.

## Claims

### Claim 1

A method for projecting maintenance revenue, comprising the steps of:
a computing device receiving a first user input requesting an estimated revenue for a projected time period, wherein the projected time period is a time period which is subsequent to a base time period;
the computing device receiving a second user input, wherein the second user input includes: a current number of installed units as of the base time period, an expected number of unit installations for one or more subsequent time periods to the base time period, a warranty upgrade rate, a warranty capture rate, an attrition rate, and a maintenance contract renewal rate;
the computing device determining an expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate, the warranty capture rate, and the maintenance contract renewal rate;
the computing device determining an expected revenue for the projected time period from warranty upgrades on units based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate and the warranty option upgrade rate; and
the computing device determining a total expected revenue for the projected time period based on at least the computing device determining the expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts and the expected revenue for the projected time period from warranty upgrades on installed units.

### Claim 2 (depends on 1)

The method of claim 1, wherein the step of determining the total expected revenue for the projected time period is further based on one or more of: a general price action value and a discount value.

### Claim 3 (depends on 1)

The method of claim 1, wherein the step of determining the total expected revenue for the projected time period is further based on one or more of: a general price action skew value and a discount skew value.

### Claim 4 (depends on 1)

The method of claim 1, wherein the step of determining the total expected revenue for the projected time period is further based on a signing skew value for the projected year.

### Claim 5 (depends on 1)

The method of claim 1, wherein the second user input further includes one or more of: a general price action value, a discount value, a signing skew value, an average annual revenue per unit, and an average annual revenue from warranty upgrade per unit.

### Claim 6 (depends on 1)

The method of claim 1, the method further comprising determining a total expected revenue flowing into the projected time period from the base time period and a total expected revenue flowing into the projected time period from each time period between the base time period and the projected time period.

### Claim 7

A computer program product for projecting maintenance revenue, the computer program product comprising:
one or more computer-readable storage devices and program instructions stored on at least one of the one or more tangible storage devices, the program instructions comprising:
program instructions to receive a first user input requesting an estimated revenue for a projected time period, wherein the projected time period is a time period which is subsequent to a base time period;
program instructions to receive a second user input, wherein the second user input includes: a current number of installed units as of the base time period, an expected number of unit installations for one or more subsequent time periods to the base time period, a warranty upgrade rate, a warranty capture rate, an attrition rate, and a maintenance contract renewal rate;
program instructions to determine an expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate, the warranty capture rate, and the maintenance contract renewal rate;
program instructions to determine an expected revenue for the projected time period from warranty upgrades on units based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate and the warranty option upgrade rate; and
program instructions to determine a total expected revenue for the projected time period based on at least the computing device determining the expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts and the expected revenue for the projected time period from warranty upgrades on installed units.

### Claim 8 (depends on 7)

The computer program product of claim 7, wherein the program instructions to determine the total expected revenue for the projected time period is further based on one or more of: a general price action value and a discount value.

### Claim 9 (depends on 7)

The computer program product of claim 7, wherein the program instructions to determine the total expected revenue for the projected time period is further based on one or more of: a general price action skew value and a discount skew value.

### Claim 10 (depends on 7)

The computer program product of claim 7, wherein the program instructions to determine the total expected revenue for the projected time period is further based on a signing skew value for the projected year.

### Claim 11 (depends on 7)

The computer program product of claim 7, wherein the second user input further includes one or more of: a general price action value, a discount value, a signing skew value, an average annual revenue per unit, and an average annual revenue from warranty upgrade per unit.

### Claim 12 (depends on 7)

The computer program product of claim 7, further comprising program instructions to determine a total expected revenue flowing into the projected time period from the base time period and a total expected revenue flowing into the projected time period from each time period between the base time period and the projected time period.

### Claim 13

A computer system for projecting maintenance revenue, the computer system comprising:
one or more processors, one or more computer-readable memories, one or more computer-readable tangible storage devices, and program instructions stored on at least one of the one or more storage devices for execution by at least one of the one or more processors via at least one of the one or more memories, the program instructions comprising:
program instructions to receive a first user input requesting an estimated revenue for a projected time period, wherein the projected time period is a time period which is subsequent to a base time period;
program instructions to receive a second user input, wherein the second user input includes: a current number of installed units as of the base time period, an expected number of unit installations for one or more subsequent time periods to the base time period, a warranty upgrade rate, a warranty capture rate, an attrition rate, and a maintenance contract renewal rate;
program instructions to determine an expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate, the warranty capture rate, and the maintenance contract renewal rate;
program instructions to determine an expected revenue for the projected time period from warranty upgrades on units based on at least the current number of installed units as of the base time period, the expected number of unit installations for the projected time period, the attrition rate and the warranty option upgrade rate; and
program instructions to determine a total expected revenue for the projected time period based on at least the computing device determining the expected revenue for the projected time period from new maintenance contracts and renewed maintenance contracts and the expected revenue for the projected time period from warranty upgrades on installed units.

### Claim 14 (depends on 13)

The computer system of claim 13, wherein the program instructions to determine the total expected revenue for the projected time period is further based on one or more of: a general price action value and a discount value.

### Claim 15 (depends on 13)

The computer system of claim 13, wherein the program instructions to determine the total expected revenue for the projected time period is further based on one or more of: a general price action skew value and a discount skew value.

### Claim 16 (depends on 13)

The computer system of claim 13, wherein the program instructions to determine the total expected revenue for the projected time period is further based on a signing skew value for the projected year.

### Claim 17 (depends on 13)

The computer system of claim 13, wherein the second user input further includes one or more of: a general price action value, a discount value, a signing skew value, an average annual revenue per unit, and an average annual revenue from warranty upgrade per unit.

### Claim 18 (depends on 13)

The computer system of claim 13, further comprising program instructions to determine a total expected revenue flowing into the projected time period from the base time period and a total expected revenue flowing into the projected time period from each time period between the base time period and the projected time period.
