# US 2015/0147132 A1 · High shear capability interface

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0147132 A1
- Document ID: US20150147132A1
- Status: Published application
- Kind: A1
- Application number: 14/087,464
- Filed: 2013-11-22
- Published: 2015-05-28
- Earliest claimed: 2013-11-22
- Assignees: Sikorsky Aircraft Corporation
- Applicants: Sikorsky Aircraft Corporation
- Inventors: Yuriy Gmirya; Matthew J. Karlak; John H. Meeson, Jr.
- Web page: https://patentgrep.com/patent/US20150147132A1

## CPC

- F16B 21/10: by separate parts ({F16B21/06 takes precedence}; key-type connection F16B3/00; locking screws or nuts against rotation by such means F16B39/04)
- F16B 5/02: by means of fastening members using screw-thread ({F16B5/0004 takes precedence}; construction of screw-threaded connections F16B25/00 - F16B39/00)
- F16B 19/00: Bolts without screw-thread; Pins, including deformable elements (in screwed connections F16B29/00); Rivets (means for preventing withdrawal F16B21/00)
- F16B 19/02: Bolts or sleeves for positioning of machine parts, e.g. notched taper pins, fitting pins, sleeves, eccentric positioning rings
- F16B 31/00: Screwed connections specially modified in view of tensile load; Break-bolts (shape of thread {F16B33/02; in couplings F16D9/00})
- Y10T 29/4984: Retaining clearance for motion between assembled parts
- F16B: DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING (couplings for transmitting rotation F16D)
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A connection between a first component and a second component is provided including a first hole formed in a portion of the first component and a second hole formed in a portion of the second component. The second hole is aligned with the first hole. A pin includes a through hole having a pin hole diameter. The pin extends through a portion of the first hole and into a first portion of the second hole. The pin is configured to absorb a shear load applied to the connection. A bolt extends through the second hole and the pin such that a clearance fit is formed between the bolt and the pin. The bolt is configured to absorb an axial load applied to the connection. A nut connected to the free end of the bolt limits movement of the bolt relative to the first and second component.

## Claims

### Claim 1

A connection between a first component and a second component comprising:
a first hole formed in a portion of the first component;
a second hole formed in a portion of the second component, the second hole being aligned with the first hole;
a pin including a through hole having a pin hole diameter, the pin extending through a portion of the first hole and into a first portion of the second hole, the pin being configured to absorb a shear load applied to the connection;
a bolt extending through the second hole and the pin, the bolt having an outer diameter smaller than the pin hole diameter such that a clearance fit is formed between the bolt and the pin, the bolt being configured to absorb an axial load applied to the connection; and
a nut connected to a free end of the bolt to limit movement of the bolt relative to the first component and the second component.

### Claim 2 (depends on 1)

The connection according to claim 1, wherein a diameter of the first hole and a diameter of the first portion of the second hole are substantially identical.

### Claim 3 (depends on 1)

The connection according to claim 1, wherein the pin further comprises:
a cylindrical body having an outer diameter generally constant over a length of the pin; and
a flange mounted at a first end of the generally cylindrical body, wherein the through hole extends through both the cylindrical body and the flange.

### Claim 4 (depends on 2)

The connection according to claim 2, wherein the outer diameter adjacent a second end of the pin gradually decreases to form a ramp section.

### Claim 5 (depends on 2)

The connection according to claim 2, wherein the pin hole diameter of the pin adjacent the first end includes a plurality of threads.

### Claim 6 (depends on 2)

The connection according to claim 2, wherein the flange is positioned adjacent a surface of the first component.

### Claim 7 (depends on 1)

The connection according to claim 1, further comprising:
a first bushing arranged within the first hole and configured to receive a body of the pin; and
a second bushing arranged within the second hole and configured to receive an end of the pin.

### Claim 8 (depends on 1)

The connection according to claim 1, wherein a head of the bolt is arranged within a second portion of the second hole, adjacent a surface of the second component.

### Claim 9 (depends on 7)

The connection according to claim 7, wherein a washer is arranged within the second portion of the second hole between the head of the bolt and the adjacent surface of the second component.

### Claim 10 (depends on 1)

The connection according to claim 1, wherein a nut plate is arranged between the nut and a portion of the pin.

### Claim 11 (depends on 1)

The connection according to claim 1, wherein the first component is a gearbox housing of a rotary wing aircraft and the second component is an airframe of rotary wing aircraft.

### Claim 12 (depends on 1)

The connection according to claim 1, wherein the first component has a first coefficient of thermal expansion and the second component has a second coefficient of thermal expansion other than the first coefficient of thermal expansion.

### Claim 13

A method of forming a connection between a first component and a second component comprising:
inserting a pin through a portion of a first hole formed in the first component and into a portion of a second hole formed in the second component, the pin being configured to absorb a shear load applied to the connection;
inserting a bolt into the second hole and through a through hole of the pin, the bolt being configured to absorb an axial load applied to the connection, wherein a clearance fit is formed between the bolt and the pin; and
coupling a nut to a free end of the bolt to retain the bolt in position relative to the first component and the second component.

### Claim 14 (depends on 13)

The method according to claim 13, wherein the pin is inserted into the first hole such that a flange of the pin is adjacent a surface of the first component.

### Claim 15 (depends on 13)

The method according to claim 13, wherein the bolt is inserted into the second hole such that a head of the bolt is adjacent a surface of the second component.

### Claim 16 (depends on 13)

The method according to claim 13, further comprising installing a first bushing configured to receive a body of the pin in the first hole.

### Claim 17 (depends on 16)

The method according to claim 16, further comprising installing a second bushing configured to receive the end of the pin in the second hole.

### Claim 18 (depends on 13)

The method according to claim 13, further comprising installing a washer between a head of the bolt and a surface of the second component.

### Claim 19 (depends on 13)

The method according to claim 13, further comprising installing a nut plate between the nut and a surface of the pin.
