# US 2015/0146571 A1 · Method, device and system for controlling network path

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0146571 A1
- Document ID: US20150146571A1
- Status: Published application
- Kind: A1
- Application number: 14/575,386
- Filed: 2014-12-18
- Published: 2015-05-28
- Earliest claimed: 2012-06-28
- Assignees: Huawei Technologies Co., Ltd.
- Applicants: Huawei Technologies Co., Ltd.
- Inventors: Yi Xiong; Xiaoqian Wu; Changjiang Yan; Jiehui Hu
- Web page: https://patentgrep.com/patent/US20150146571A1

## CPC

- H04L 41/122: of virtualised topologies, e.g. software-defined networks [SDN] or network function virtualisation [NFV]
- H04W 24/02: Arrangements for optimising operational condition
- H04W 40/00: Communication routing or communication path finding
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Embodiments of the present invention provide a method, a device, and a system for controlling a network path, where the method includes: the first control device generates path information for a first AP according to network topology information, and generates first forwarding information for the first AP according to acquired forwarding resource information of the first AP and the path information, and sends the first forwarding information to the first AP; the first control device determines that a second AP which is not managed by the first control device is included in the path information, sends the path information to a second control device for managing the second AP, so that the second control device generates second forwarding information for the second AP according to the path information and the acquired forwarding resource information of the second AP, and sends the second forwarding information to the second AP.

## Claims

### Claim 1

A method for controlling a network path, comprising:
generating, by a first control device, path information for a first access point (AP) according to network topology information, and generating first forwarding information for the first AP according to acquired forwarding resource information of the first AP and the path information, and sending the first forwarding information to the first AP;
determining, by the first control device, that a second AP which is not managed by the first control device is included in the path information, sending the path information to a second control device for managing the second AP, so that the second control device generates second forwarding information for the second AP according to the path information and acquired forwarding resource information of the second AP, and sends the second forwarding information to the second AP.

### Claim 2 (depends on 1)

The method for controlling a network path according to claim 1, wherein the determining, by the first control device, that the second AP which is not managed by the first control device is included in the path information specifically comprises:
determining, by the first control device, that the second AP which is not managed by the first control device is included in the path information, when the second AP is included in the path information and the first control device has no forwarding resource information of the second AP.

### Claim 3 (depends on 1)

The method for controlling a network path according to claim 1, wherein the path information comprises bidirectional path information between the first control device and the first AP and bidirectional path information between the second control device and the first AP.

### Claim 4 (depends on 1)

The method for controlling a network path according to claim 1, wherein the path information comprises bidirectional path information between the first control device and the first AP.

### Claim 5 (depends on 1)

The method for controlling a network path according to claim 1, wherein the path information comprises bidirectional path information between the second control device and the first AP.

### Claim 6 (depends on 1)

The method for controlling a network path according to claim 1, wherein before the generating, by the first control device, the path information for the first AP according to the network topology information, the method further comprises:
receiving, by the first control device, the forwarding resource information sent by the first AP.

### Claim 7 (depends on 6)

The method for controlling a network path according to claim 6, wherein before the receiving, by the first control device, the forwarding resource information sent by the first AP, the method further comprises:
requesting, by the first control device, the forwarding resource information from the first AP.

### Claim 8

A first control device, comprising:
a first processing unit, configured to generate path information for a first access point (AP) according to network topology information, and generate first forwarding information for the first AP according to acquired forwarding resource information of the first AP and the path information, and send the first forwarding information to the first AP;
a second processing unit, configured to determine that a second AP which is not managed by the first control device is included in the path information, send the path information to a second control device for managing the second AP, so that the second control device generates second forwarding information for the second AP according to the path information and acquired forwarding resource information of the second AP, and send the second forwarding information to the second AP.

### Claim 9 (depends on 8)

The first control device according to claim 8, wherein the second processing unit is further configured to determine that the second AP which is not managed by the first control device is included in the path information, when the second AP is included in the path information and the first control device has no forwarding resource information of the second AP.

### Claim 10 (depends on 8)

The first control device according to claim 8, wherein the path information comprises bidirectional path information between the first control device and the first AP and bidirectional path information between the second control device and the first AP.

### Claim 11 (depends on 8)

The first control device according to claim 8, wherein the path information comprises bidirectional path information between the first control device and the first AP.

### Claim 12 (depends on 8)

The first control device according to claim 8, wherein the path information comprises bidirectional path information between the second control device and the first AP.

### Claim 13 (depends on 8)

The first control device according to claim 8, further comprising:
a first receiving unit, configured to receive the forwarding resource information sent by the first AP.

### Claim 14 (depends on 13)

The first control device according to claim 13, further comprising:
a requesting unit, configured to request the forwarding resource information from the first AP.

### Claim 15

An access point, comprising:
a sending unit, configured to send forwarding resource information to a first control device and a second control device, respectively;
a second receiving unit, configured to receive first forwarding information sent by the first control device and third forwarding information sent by the second control device;
a forwarding unit, configured to determine valid forwarding information according to the first forwarding information and the third forwarding information, and forward a received packet according to the valid forwarding information.

### Claim 16 (depends on 15)

The access point according to claim 15, wherein the first forwarding information comprises a first priority that is delivered by the first control device to the AP; the third forwarding information comprises a third priority that is delivered by the second control device to the AP;
the forwarding unit is further configured to select the first forwarding information as the valid forwarding information, when the first priority is higher than the third priority.

### Claim 17 (depends on 15)

The access point according to claim 15, wherein the forwarding unit is further configured to select one of the first forwarding information and the third forwarding information as the valid forwarding information, according to a preset policy.

### Claim 18 (depends on 15)

The access point according to claim 15, wherein:
the second receiving unit is configured to send the forwarding resource information to the first control device, according to a received first forwarding resource information acquiring request which is sent by the first control device; and send the forwarding resource information to the second control device, according to a received second forwarding resource information acquiring request which is sent by the second control device.
