# US 2015/0144337 A1 · Waste heat recovery from depleted reservoir

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0144337 A1
- Document ID: US20150144337A1
- Status: Published application
- Kind: A1
- Application number: 14/549,493
- Filed: 2014-11-20
- Published: 2015-05-28
- Earliest claimed: 2013-11-22
- Assignees: Cenovus Energy Inc.
- Applicants: Cenovus Energy Inc.
- Inventors: Mark BILOZIR; Christian CANAS; Carlos Emilio PEREZ DAMAS; Arun SOOD
- Web page: https://patentgrep.com/patent/US20150144337A1

## CPC

- E21B 43/2406: {Steam assisted gravity drainage [SAGD]}
- E21B 43/166: {Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium (CO2 injection E21B43/164; steam injection E21B43/24)}
- E21B 43/243: Combustion in situ
- E21B 43/247: in association with fracturing processes {or crevice forming processes}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method of producing heated water from a reservoir having a hot bitumen-depleted zone adjacent to an aqueous mobile zone. The method includes generating fluid communication between the aqueous mobile zone and the hot bitumen-depleted zone. The method further includes driving water from the aqueous mobile zone through a portion of the hot bitumen-depleted zone to heat the water to produce heated water from a heated water production well.

## Claims

### Claim 1

A method of producing heated water from a hydrocarbon reservoir having a hot bitumen-depleted zone adjacent to an aqueous mobile zone, the method comprising:
generating fluid communication between the aqueous mobile zone and the hot bitumen-depleted zone;
driving water from the aqueous mobile zone through at least a portion of the hot bitumen-depleted zone to heat the water; and
producing the heated water from a heated water production well.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising:
generating the hot bitumen-depleted zone using steam-assisted gravity drainage, in situ combustion, steam flooding, cyclic steam stimulation, a solvent aided thermal recovery process, electric heating, electromagnetic heating, or any combination thereof.

### Claim 3 (depends on 1)

The method according to claim 1, wherein driving the water from the aqueous mobile zone through at least a portion of the hot bitumen-depleted zone heats the water sufficiently to generate steam in situ.

### Claim 4 (depends on 3)

The method according to claim 3, wherein the heated water production well is located above at least a portion of the hot bitumen-depleted zone, and the water from the aqueous mobile zone is driven though the portion of the hot-bitumen depleted zone below the heated water production well.

### Claim 5 (depends on 1)

The method according to claim 1, wherein driving the water from the aqueous mobile zone through at least a portion of the hot bitumen-depleted zone heats the water sufficiently to generate hot liquid water in situ.

### Claim 6 (depends on 5)

The method according to claim 5 wherein the heated water production well is located below at least a portion of the hot bitumen-depleted zone, and the water from the aqueous mobile zone is driven though the portion of the hot-bitumen depleted zone above the heated water production well.

### Claim 7 (depends on 1)

The method according to claim 1, wherein driving the water from the aqueous mobile zone through at least a portion of the hot bitumen-depleted zone heats the water sufficiently to generate both steam and hot liquid water in situ.

### Claim 8 (depends on 7)

The method according to claim 7, wherein the method comprises producing heated water from a first and a second heated water production well, wherein:
the first heated water production well is located above at least a portion of the hot bitumen-depleted zone; and
the second heated water production well is located below at least a portion of the hot bitumen-depleted zone; and
the water from the aqueous mobile zone is driven though a portion of the hot-bitumen depleted zone below the first heated water production well and above the heated water production well, and
the first heated water production well produces heated water from the generated steam, and the second heated water production well produces water from the generated hot liquid water.

### Claim 9 (depends on 1)

The method according to claim 1 further comprising applying a pressure difference between the aqueous mobile zone and the heated water production well to drive the water from the aqueous mobile zone through the at least a portion of the hot bitumen-depleted zone.

### Claim 10 (depends on 9)

The method according to claim 9, wherein the pressure difference is applied by: injecting a gas or liquid into the aqueous mobile zone, reducing the pressure at the heated water production well, an increased pressure exerted by the aqueous mobile zone, gravity, or any combination thereof.

### Claim 11 (depends on 1)

The method according to claim 1, wherein the method avoids the injection of a gas or liquid into the aqueous mobile zone.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the hot bitumen-depleted zone is separated from the aqueous mobile zone by a geological barrier, and generating fluid communication between the aqueous mobile zone and the hot bitumen-depleted zone comprises modifying the geological barrier to allow the aqueous mobile zone to flow through the modified geological barrier.

### Claim 13 (depends on 12)

The method according to claim 12 wherein the geological barrier comprises a lithology contrast, a fault, a fluid compositional gradient, a tar mat, a rock formation, bitumen, or any combination thereof.

### Claim 14 (depends on 12)

The method according to claim 12, wherein the geological barrier is a rock formation and modifying the geological barrier comprises fracturing a sufficient portion of the rock formation to allow water from the aqueous zone to flow to the hot bitumen-depleted zone.

### Claim 15 (depends on 12)

The method according to claim 12, wherein the geological barrier comprises bitumen and modifying the geological barrier comprises sufficiently decreasing the viscosity of the bitumen so that water from the aqueous mobile zone is flowable through the geological barrier to the hot bitumen-depleted zone.

### Claim 16 (depends on 12)

The method according to claim 12, wherein modifying the geological barrier comprises drilling a well that generates the fluid communication between the aqueous mobile zone and the hot bitumen-depleted zone.
