# US 2015/0143885 A1 · Process and device for testing the powertrain of at least partially electrically driven vehicles

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0143885 A1
- Document ID: US20150143885A1
- Status: Published application
- Kind: A1
- Application number: 14/402,815
- Filed: 2013-05-24
- Published: 2015-05-28
- Earliest claimed: 2012-05-24
- Assignees: AVL List GmbH
- Applicants: Avl-List-Platz 1
- Inventors: Oliver König; Stefan Jakubek; Gunter Prochart; Kurt Gschweitl; Gregor Gregorcis
- Web page: https://patentgrep.com/patent/US20150143885A1

## CPC

- G01M 13/02: Gearings; Transmission mechanisms
- G01M 15/00: Testing of engines
- G01M 15/02: Details or accessories of testing apparatus
- G05B 13/048: {using a predictor}
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

In a process for testing the powertrain of vehicles that are at least in part electrically driven, the voltage supplied to the powertrain is controlled by a controller coupled with a simulation system for the energy storage system in a way that the voltage acts dynamically as for a real energy storage system. The controller is designed with a model based controller design method, with a load model of the powertrain being used in the model of the controlled system.

## Claims

### Claim at position 1

1-7. (canceled)

### Claim 8

A method for testing the powertrain of vehicles that are at least in part electrically driven, whereby the voltage supplied to the powertrain is controlled by a controller coupled with a simulation system for the energy storage system in a manner that the voltage acts dynamically as for a real energy storage system, whereat the controller is designed with a model based controller design method as model predictive control, whereby a load model of the powertrain being used in the discrete time model of the controlled system and at each time instant (k) an optimal sequence of control moves (Δuk) is determined, wherein the model has a parameter (gp) in its parameter set that is variable over the operating range and wherein a number (i) of parameter sets with parameter (gp,i) is calculated over the operating range and the parameter set with parameter (gp,i) which is closest to the actual parameter (gp) is chosen for determining the sequence of control moves (Δuk).

### Claim 9 (depends on 8)

The method according to claim 8, wherein the output voltage is measured, the power demand of the powertrain is estimated and the parameters of the load model are modified in dependence of the output voltage and the estimated load demand, preferably by switching between complete sets of parameters.

### Claim 10 (depends on 9)

The method according to claim 9, wherein the estimation of the load demand is accomplished with an observer system, based on the measured load current.

### Claim 11

A device for testing of a powertrain of vehicles that are at least in part electrically driven, with a simulation system for the energy storage system, and with a controller that is coupled with the simulation system for controlling the voltage supplied to the powertrain in a manner that said voltage acts dynamically as for a real storage system, whereat a model based controller as model predictive control is realized in the controlled system and a load model of the powertrain is integrated in the model of the controlled system and at each time instant (k) an optimal sequence of control moves (Δuk) is determined by the model predictive control, wherein the model has a parameter (gp) in its parameter set that is variable over the operating range and wherein the control chooses the parameter set with parameter (gp,i) which is closest to the actual parameter (gp) from a number (i) of calculated and over the operating range allocated parameter sets with parameter (gp,i) for determining the sequence of control moves (Δuk).

### Claim 12 (depends on 11)

The device according to claim 11, wherein a load power demand dependent model is integrated.

### Claim 13 (depends on 12)

The device according to claim 12, wherein a model is integrated that depends on the output voltage of the energy storage system.
