# US 2015/0143843 A1 · Integration of a small scale liquefaction unit with an lng plant to convert end flash gas and boil-off gas to incremental lng.

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0143843 A1
- Document ID: US20150143843A1
- Status: Published application
- Kind: A1
- Application number: 14/089,329
- Filed: 2013-11-25
- Published: 2015-05-28
- Earliest claimed: 2013-11-25
- Assignees: Chevron U.S.A. Inc.
- Inventors: Daniel Chinn; Stanley Hsing-Wei Huang; Yaofan Yi
- Web page: https://patentgrep.com/patent/US20150143843A1

## CPC

- F25J 1/0022: {Hydrocarbons, e.g. natural gas}
- F25J 1/0025: {Boil-off gases "BOG" from storages}
- F25J 1/0242: {Waste heat recovery, e.g. from heat of compression}
- F25J 1/0245: {Different modes, i.e. 'runs', of operation; Process control}
- F25J 1/0249: {Controlling refrigerant inventory, i.e. composition or quantity (charging or discharging refrigerants in cooling systems F25B45/00)}
- F25J 1/0271: {Inter-connecting multiple cold equipments within or downstream of the cold box}
- F25J 1/0274: {Retrofitting or revamping of an existing liquefaction unit}
- F25J 1/0284: {Electrical motor as the prime mechanical driver}
- F25J 2220/62: Separating low boiling components, e.g. He, H2, N2, Air
- F25J 2230/30: Compression of the feed stream
- F25J 2230/60: the fluid being hydrocarbons or a mixture of hydrocarbons
- F25J 2240/82: with waste heat recovery, e.g. in a combined cycle, i.e. for generating steam used in a Rankine cycle
- F25J 2245/02: Recycle of a stream in general, e.g. a by-pass stream
- F25J 2245/90: the recycled stream being boil-off gas from storage
- Y10T 29/49716: Converting
- F25J: LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS {OR LIQUEFIED GASEOUS} MIXTURES BY PRESSURE AND COLD TREATMENT {OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE (cryogenic pumps F04B37/08; gas storage vessels, gas holders F17; filing vessels with, or discharging from vessels, compressed, liquefied or solidified gases F17C; refrigeration machines, plants, or systems F25B)}
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

Disclosed is a method of retrofitting a full-scale LNG plant to enhance the LNG production capacity of the LNG plant and a method for operating such a retrofit plant. A small scale LNG plant having a capacity less than 2 MTPA can be integrated with a main LNG plant having a capacity of at least 4 MTPA such that end flash gas and boil off gas from the main LNG plant can be liquefied by the small scale LNG plant as incremental LNG. It has been found that the production capacity of the integrated system can be improved by increasing the temperature of the gas stream exiting the main cryogenic heat exchanger of the main LNG plant between 5° C. and 30° C. as compared with the design temperature.

## Claims

### Claim 1

A method for retrofitting a main LNG plant having a capacity of at least 4 MTPA to expand the capacity of the main LNG plant, wherein the main LNG plant comprises:
a main cryogenic heat exchanger having a feed gas inlet and a gas outlet,
a nitrogen rejection unit having an inlet in fluid communication with the gas outlet of the main cryogenic heat exchanger, an LNG outlet and an end flash gas outlet,
an LNG storage unit having an LNG inlet in fluid communication with the LNG outlet of the nitrogen rejection unit, an LNG storage unit outlet and a boil off gas outlet,
the method comprising:
connecting a small-scale LNG plant having a capacity of less than 2 MTPA and having at least one inlet and an outlet to the end flash gas outlet of the nitrogen rejection unit of the main LNG plant such that an inlet of the small-scale LNG plant and the end flash gas outlet are in fluid communication; and
installing a first compressor having a first compressor inlet between the end flash gas outlet of the main LNG plant and the inlet of the small-scale LNG plant in fluid communication with the end flash gas outlet for increasing end flash gas pressure prior to being delivered to the inlet of the small-scale LNG plant.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
connecting the small-scale LNG plant to the boil off gas outlet of the LNG storage unit of the main LNG plant such that one of the at least one inlet of the small-scale LNG plant and the boil off gas outlet are in fluid communication; and
installing a second compressor between the boil off gas outlet of the main LNG plant and the inlet of the small-scale LNG plant in fluid communication with the boil off gas outlet for increasing boil off gas pressure prior to being delivered to the inlet of the small-scale LNG plant.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
installing a temperature sensor between the gas outlet of the main cryogenic heat exchanger of the main LNG plant and the inlet to the nitrogen rejection unit of the main LNG plant capable of gathering temperature information on a gas stream exiting the main cryogenic heat exchanger of the main LNG plant.

### Claim 4 (depends on 3)

The method of claim 3, further comprising:
installing a processor in communication with the temperature sensor for receiving the temperature information gathered by the temperature sensor and determining whether to activate a change in a feed gas flow rate to the main cryogenic heat exchanger of the main LNG plant; and
connecting the processor to a flow control valve upstream of the feed gas inlet of the main cryogenic heat exchanger of the main LNG plant.

### Claim 5 (depends on 3)

The method of claim 3, further comprising:
installing a processor in communication with the temperature sensor for receiving the temperature information gathered by the temperature sensor and determining whether to activate a change in a refrigerant circulation rate within the main cryogenic heat exchanger of the main LNG plant; and
connecting the processor to a refrigerant control valve or a refrigerant compression control mechanism associated with the main cryogenic heat exchanger of the main LNG plant.

### Claim 6 (depends on 3)

The method of claim 3, further comprising:
installing a processor in communication with the temperature sensor for receiving the temperature information gathered by the temperature sensor and determining whether to activate a change in a pressure at an outlet of a refrigerant compressor associated with the main cryogenic heat exchanger; and
connecting the processor to a compressor outlet valve.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
installing a pressure sensor at the first compressor inlet capable of gathering pressure information on a gas stream entering the first compressor.

### Claim 8 (depends on 7)

The method of claim 7, further comprising:
installing a processor in communication with the pressure sensor for receiving the pressure information gathered by the pressure sensor and determining whether to activate a change in a feed gas flow rate to the main cryogenic heat exchanger of the main LNG plant; and
connecting the processor to a flow control valve upstream of the feed gas inlet of the main cryogenic heat exchanger of the main LNG plant.

### Claim 9 (depends on 7)

The method of claim 7, further comprising:
installing a processor in communication with the pressure sensor for receiving the pressure information gathered by the pressure sensor and determining whether to activate a change in a refrigerant circulation rate within the main cryogenic heat exchanger of the main LNG plant; and
connecting the processor to a refrigerant control valve or a refrigerant compression control mechanism associated with the main cryogenic heat exchanger of the main LNG plant.

### Claim 10 (depends on 7)

The method of claim 7, further comprising:
installing a processor in communication with the pressure sensor for receiving the pressure information gathered by the pressure sensor and determining whether to activate a change in a pressure at an outlet of a refrigerant compressor associated with the main cryogenic heat exchanger; and
connecting the processor to a compressor outlet valve.

### Claim 11 (depends on 1)

A method for operating the main LNG plant retrofit according to claim 1, wherein the main LNG plant has design parameters including a design capacity, a design total refrigeration duty range, a design production of end flash gas, a design production of boil off gas, a design feed flow rate and a design temperature of a gas stream exiting the main cryogenic heat exchanger;
the method comprising the steps of:
a. passing a natural gas feed stream at a feed flow rate above the design feed flow rate of the main LNG plant through the main cryogenic heat exchanger of the main LNG plant to produce a gas stream exiting the main cryogenic heat exchanger having a temperature between 5° C. and 30° C. higher than the design temperature;
b. sending the gas stream exiting the main cryogenic heat exchanger to a nitrogen rejection unit to produce a nitrogen reduced LNG stream and an end flash gas stream;
c. sending the nitrogen reduced LNG stream to an LNG storage unit; and
d. compressing at least a portion of the end flash gas stream to produce a compressed end flash gas stream and sending the compressed end flash gas stream to the small scale LNG plant to be liquefied;
wherein the total refrigeration duty remains within the design total refrigeration duty range.

### Claim 12 (depends on 11)

The method of claim 11, wherein the design temperature of the gas stream exiting the main cryogenic heat exchanger is in a range of from −135° C. to −150° C. and the gas stream exiting the main cryogenic heat exchanger in step (a) has a temperature in a range of from −120° C. to −140° C.

### Claim 13 (depends on 11)

The method of claim 11, further comprising:
e. compressing a boil off gas stream from the LNG storage unit to a to form a compressed boil off gas stream; and
f. sending the compressed boil off gas stream to the small scale LNG plant to be liquefied.

### Claim 14 (depends on 11)

The method of claim 11, wherein prior to step (a), the natural gas stream is treated to remove acid gas and natural gas liquids.

### Claim 15 (depends on 11)

The method of claim 11, further comprising:
monitoring the temperature of the gas stream exiting the main cryogenic heat exchanger with a temperature sensor and/or monitoring the pressure of the gas stream entering the first compressor with a pressure sensor; and
controlling at least one process condition to result in maintaining the temperature of the gas stream exiting the main cryogenic heat exchanger at a temperature between 5° C. and 30° C. higher than the design temperature.

### Claim 16 (depends on 15)

The method of claim 15, wherein the at least one process condition is selected from the group consisting of feed gas flow rate to the main cryogenic heat exchanger of the main LNG plant, refrigerant circulation rate within the main cryogenic heat exchanger of the main LNG plant, and pressure at an outlet of a refrigerant compressor associated with the main cryogenic heat exchanger.

### Claim 17 (depends on 11)

The method of claim 11, further comprising utilizing a portion of the end flash gas stream as a fuel gas stream in the main LNG plant and/or the small-scale LNG plant.

### Claim 18 (depends on 11)

The method of claim 11, wherein liquefied natural gas produced by the small scale LNG plant contains no natural gas liquids.

### Claim 19 (depends on 11)

The method of claim 11, wherein power for the small scale LNG plant is provided by waste heat recovered from a utility section of the main LNG plant.

### Claim 20 (depends on 11)

The method of claim 11, wherein production of the end flash gas stream is 5-50% by volume higher than the design production of end flash gas; and production of the boil off gas stream is 5-50% by volume higher than the design production of boil off gas.

### Claim 21 (depends on 11)

The method of claim 11, wherein production of the end flash gas stream is 10-20% by volume higher than the design production of end flash gas; and production of the boil off gas stream is 10-20% by volume higher than the design production of boil off gas.

### Claim 22 (depends on 11)

The method of claim 11, wherein the main LNG plant is utilized at a capacity above the design capacity.

### Claim 23

A system for producing liquefied natural gas, comprising:
a. a main LNG plant having a capacity of at least 4 MTPA, comprising:
i. a main cryogenic heat exchanger having a feed gas inlet and a gas outlet;
ii. a nitrogen rejection unit having an inlet in fluid communication with the gas outlet of the main cryogenic heat exchanger, an LNG outlet and an end flash gas outlet; and
iii. an LNG storage unit having an LNG inlet in fluid communication with the LNG outlet of the nitrogen rejection unit, an LNG storage unit outlet and a boil off gas outlet;
b. an end flash gas compressor connected to the end flash gas outlet;
c. a boil off gas compressor connected to the boil off gas outlet; and
d. a small scale LNG plant having a capacity less than 2 MTPA and having an end flash gas inlet connected to the end flash gas compressor and having a boil off gas inlet connected to the boil off gas compressor.

### Claim 24 (depends on 23)

The system of claim 23, wherein the main LNG plant further comprises:
a natural gas liquids removal unit connected upstream of the main cryogenic heat exchanger; and
an acid gas removal unit connected upstream of the main cryogenic heat exchanger and upstream of the natural gas liquids removal unit.

### Claim 25 (depends on 23)

The system of claim 23, wherein the main LNG plant further comprises a utility section and wherein power for the small scale LNG plant is provided by waste heat recovered from the utility section of the main LNG plant.

### Claim 26 (depends on 23)

The system of claim 23, wherein the main LNG plant further comprises a temperature control system for controlling the temperature of the gas stream exiting the main cryogenic heat exchanger comprising a temperature sensor located between the gas outlet of the main cryogenic heat exchanger of the main LNG plant and the inlet to the nitrogen rejection unit of the main LNG plant capable of gathering temperature information on a gas stream exiting the main cryogenic heat exchanger of the main LNG plant, a processor in communication with the temperature sensor for receiving the temperature information gathered by the temperature sensor and determining whether to activate a change in at least one process condition to result in maintaining the temperature of the gas stream exiting the main cryogenic heat exchanger at a temperature between 5° C. and 30° C. higher than the design temperature; wherein the at least one process condition is selected from the group consisting of feed gas flow rate to the main cryogenic heat exchanger of the main LNG plant, refrigerant circulation rate within the main cryogenic heat exchanger of the main LNG plant, and pressure at an outlet of a refrigerant compressor associated with the main cryogenic heat exchanger.