# US 2015/0143769 A1 · Steel-frame building, plant, and method for assembling steel-frame building

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0143769 A1
- Document ID: US20150143769A1
- Status: Published application
- Kind: A1
- Application number: 14/525,640
- Filed: 2014-10-28
- Published: 2015-05-28
- Earliest claimed: 2013-11-27
- Assignees: Mitsubishi Hitachi Power Systems, Ltd.
- Applicants: Mitsubishi Hitachi Power Systems, Ltd.
- Inventors: Naoshige YOSHIDA
- Web page: https://patentgrep.com/patent/US20150143769A1

## CPC

- C10J 3/00: Production of combustible gases containing carbon monoxide from solid carbonaceous fuels (destructive distillation processes C10B)
- C10J 2200/09: Mechanical details of gasifiers not otherwise provided for, e.g. sealing means
- E04C 2003/0495: {the truss elements being located in several non-parallel surfaces}
- Y02E 20/18: Integrated gasification combined cycle [IGCC], e.g. combined with carbon capture and storage [CCS]
- C10J: PRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES (synthesis gas from liquid or gaseous hydrocarbons C01B; underground gasification of minerals E21B43/295); CARBURETTING AIR OR OTHER GASES
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A steel-frame building, which is installed permanently next to a stand-alone heavy structure and which can reduce a construction cost, a plant including the steel-frame building, and a method for assembling a steel-frame building are provided. The steel-frame building is installed permanently next to a stand-alone heavy structure, and includes a gantry frame which is used for pulling the whole of the stand-alone heavy structure to stand up. The gantry frame may be used for carrying in other devices to be housed in the steel-frame building.

## Claims

### Claim 1

A steel-frame building which is installed permanently next to a stand-alone heavy structure and which is used for an integrated coal gasification combined cycle plant including tower-type gasification furnace apparatus as the stand-alone heavy structure, comprising a gantry frame which is used for pulling a whole of the stand-alone heavy structure to stand up.

### Claim 2 (depends on 1)

The steel-frame building according to claim 1, the gantry frame comprising:
columns;
beams; and
horizontal braces, wherein
the horizontal brace is a brace provided in a horizontal plane to connect the column and the beam in a horizontal direction.

### Claim 3 (depends on 2)

The steel-frame building according to claim 2, the gantry frame further comprises vertical braces, wherein
the vertical brace is a brace provided in a vertical plane to connect the column and the beam in the height direction; and
at least one of the column, the beam, the horizontal brace, and the vertical brace is made of H-steel and thicker than a column, a beam, and a horizontal brace, and a vertical brace respectively which constitute the steel-frame building.

### Claim 4 (depends on 1)

An integrated coal gasification combined cycle plant comprising the steel-frame building according to claim 1.

### Claim 5 (depends on 2)

An integrated coal gasification combined cycle plant comprising the steel-frame building according to claim 2.

### Claim 6 (depends on 3)

An integrated coal gasification combined cycle plant comprising the steel-frame building according to claim 3.

### Claim 7

A method for assembling a steel-frame building which is installed permanently next to a stand-alone heavy structure and which is used for an integrated coal gasification combined cycle plant including tower-type gasification furnace apparatus as the stand-alone heavy structure, the method comprising the steps of:
assembling sections which constitute major parts of the steel-frame building; and
assembling a gantry frame which constitutes a part of the steel-frame building and which is used for pulling a whole of the stand-alone heavy structure to stand up.

### Claim 8 (depends on 7)

The method for assembling a steel-frame building according to claim 7, further comprising the steps of:
installing a crane on top of the steel-frame building;
anchoring a wire hung from the crane to the stand-alone heavy structure; and
hoisting up the wire so that the stand-alone heavy structure stands alone.

### Claim 9 (depends on 8)

The method for assembling a steel-frame building according to claim 8, further comprising the steps of:
lifting other devices and carrying them into the steel-frame building by using the crane installed on top of the steel-frame building; and
installing the other devices at predetermined positions.

### Claim 10 (depends on 7)

The method for assembling a steel-frame building according to claim 7, wherein the gantry frame is not removed but is used as is as a section constituting a part of the steel-frame building even after the stand-alone heavy structure has been pulled to stand up.