# US 2015/0143765 A1 · Connection between a wind turbine tower and its foundation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0143765 A1
- Document ID: US20150143765A1
- Status: Published application
- Kind: A1
- Application number: 14/381,611
- Filed: 2012-02-28
- Published: 2015-05-28
- Earliest claimed: 2012-02-28
- Assignees: Ms Enertech, S.L.
- Inventors: José Ramón Carril González; Alvaro Hernando Aragón; Enrique Martínez Camarero
- Web page: https://patentgrep.com/patent/US20150143765A1

## CPC

- E04H 12/34: Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E02D 27/425: {specially adapted for wind motors masts (wind motors per se F03D1/00)}
- E04B 1/4114: {Elements with sockets (E04B1/4107 takes precedence)}
- F03D 13/22: {Foundations specially adapted for wind motors}
- F05B 2230/60: Assembly methods
- F05B 2240/912: on a tower
- F05B 2240/917: attached to cables
- F05B 2260/30: Retaining components in desired mutual position
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/728: Onshore wind turbines
- Y02P 70/50: Manufacturing or production processes characterised by the final manufactured product
- Y10T 29/49631: Columnar member
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

The invention relates to a connection between a tower (7) of a wind generator and its foundation established by an interface formed by flexible elements independent from one another which are formed by a series of tensioned cables (1). Each of these cables is located inside vertical housing means (4) which are embedded in the foundation. The invention also relates to a method of execution of the connection between a tower (7) of a wind generator and its foundation (8), comprising a series of stages, some of which vary depending on whether or not the foundation (8) has central lightweighting. It also generates variation in some aspect if the tower is made of metal or concrete and, in this case, if the tensioning cables of the tower are common to or independent of those of the connection.

## Claims

### Claim 1

Connection between a tower of a wind generator and its foundation, wherein said connection is established by an interface formed by flexible elements independent from one another.

### Claim 2 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the flexible elements forming the interface are formed by a series of tensioned cables with a passive anchor at one end and an active anchor at the other, each of which are inside vertical housing means which are embedded in the foundation, said housing means being spaced a certain distance from one another.

### Claim 3 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1 wherein the flexible elements forming the interface are formed by a series of tensioned cables with two active anchors, each one at one of the ends, each of which is inside a vertical longitudinal element that is embedded in the foundation, said longitudinal elements being spaced a certain distance from one another.

### Claim 4 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the passive anchor is embedded in the foundation.

### Claim 5 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the passive anchor is outside the foundation.

### Claim 6 (depends on 4)

Connection between a tower of a wind generator and its foundation according to claim 4, wherein the tensioning of the cables is performed from the upper end.

### Claim 7 (depends on 5)

Connection between a tower of a wind generator and its foundation according to claim 5, wherein the tensioning of the cables is performed from the lower end.

### Claim 8 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the section of tower of the wind generator connecting with the foundation is made of concrete and the tensioning cables of the connection are common to the of tensioning of the tower.

### Claim 9 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the section of tower of the wind generator connecting with the foundation is made of concrete and the tensioning cables of the connection are independent of the tensioning cables of the tower.

### Claim 10 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the section of tower of the wind generator connecting with the foundation is made of non-prestressed reinforced concrete.

### Claim 11 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the section of tower of the wind generator connecting with the foundation is made of metal.

### Claim 12 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the tensioned cables forming the interface can be formed by steel.

### Claim 13 (depends on 1)

Connection between a tower of a wind generator and its foundation according to claim 1, wherein the vertical housing means for each of the cables can be formed by sheaths or any other element or set of elements generating a space for housing the cable.

### Claim 14 (depends on 1)

Method of execution of the connection between a tower of a wind generator and its foundation, this being a foundation without central lightweighting, as defined in claim 1, wherein it comprises the following stages
reinforcing the foundation;
placing housing means of the cables;
assembling passive anchors;
threading steel cables;
concreting the foundation;
placing at least the first section of tower;
pouring leveling mortar in the upper portion of the pedestal of the foundation;
assembling active anchors in the upper portion of each cable;
tensioning the cables, and;
filling sheaths with cementitious grout.

### Claim 15 (depends on 14)

Method of execution of the connection between a tower of a wind generator and its foundation according to claim 14, wherein in the case of a concrete tower of the wind generator with tensioning cables common to those of the connection, the stage of placing at least the first section of tower comprises placing the sections of said tower the cable of which is the same as the connection.

### Claim 16 (depends on 15)

Method of execution of the connection between a tower of a wind generator and its foundation according to claim 15, wherein if the tensioning is outside the tower, after pouring foundation mortar there is an additional stage of assembling cables guides for guiding the cables towards the tower.

### Claim 17 (depends on 1)

Method of execution of the connection between a tower of a wind generator and its foundation, this being a foundation with central lightweighting, the connection defined in claim 1, wherein it comprises the following stages
reinforcing the foundation and formwork of the lower box;
placing housing means of the cables;
concreting the foundation;
placing at least the first section of tower;
pouring leveling mortar in the upper portion of the pedestal of the foundation;
threading steel cables;
assembling passive anchors;
assembling active anchors, and;
tensioning the cables.

### Claim 18 (depends on 17)

Method of execution of the connection between a tower of a wind generator and its foundation according to claim 17, wherein the lower box can be discontinuous.

### Claim 19 (depends on 1)

Method of execution of the connection between a tower of a wind generator and its foundation according to claim 1, wherein in the event that the tower of the wind generator is made of concrete with tensioning cables (1.1) common to those of the connection and outside the tower, it comprises an additional stage of assembling cable guides for guiding the cables towards the tower after pouring the leveling mortar.

### Claim 20 (depends on 1)

Method of execution of the connection between a tower of a wind generator and its foundation according to claim 1, wherein in the event that the tower of the wind generator is made of concrete with tensioning cables common to those of the connection, in the stage of placing at least the first section of tower, those sections thereof the cable of which is the same as that of the connection are placed.

### Claim 21 (depends on 14)

Method of execution of the connection between a tower of a wind generator and its foundation according to claim 14, wherein the housing means of the cables are placed on an element for fixing and separating said means which is embedded in the foundation.