# US 2015/0125215 A1 · Method for constructing a tunnel course, and structural element for use by the method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0125215 A1
- Document ID: US20150125215A1
- Status: Published application
- Kind: A1
- Application number: 14/128,113
- Filed: 2012-06-21
- Published: 2015-05-07
- Earliest claimed: 2011-06-21
- Assignees: Stabinor AS
- Inventors: Torbjørn Dalegården
- Web page: https://patentgrep.com/patent/US20150125215A1

## CPC

- E21D 11/083: {Methods or devices for joining adjacent concrete segments}
- E21D 9/00: Tunnels or galleries, with or without linings; Methods or apparatus for making thereof (E02D29/045, E02D29/063 take precedence; linings per se E21D11/00); Layout of tunnels or galleries
- E21D 11/04: Lining with building materials (E21D11/02, E21D11/14 take precedence {; compositions of mortars, concrete or like building materials C04B; placing filling-up materials in underground workings E21F15/00})
- E21D 11/08: with preformed concrete slabs {(backfilling the space between the slabs and the rock E21D11/105)}
- E21D 11/102: {Removable shuttering; Bearing or supporting devices therefor}
- E21D 11/30: Bases for lower arch members (for props E21D15/54)
- E21D 11/38: Waterproofing (in general E02D31/00); Heat insulating; Soundproofing; Electric insulating (for building constructions in general E04B1/62)
- E21D 11/385: {Sealing means positioned between adjacent lining members (for joints in foundation structures E02D29/16; for sewers E03F3/04; for building structures in general E04B1/68)}
- E21D 11/386: {inflatable sealing means}
- E21D 11/40: Devices or apparatus specially adapted for handling or placing units of linings {or supporting units} for tunnels or galleries {(combined with tunnelling shields E21D9/06)}
- E21F 16/02: of tunnels
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)
- E21F: SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS

## Abstract

A method and a structural element for the construction of a directionally flexible and watertight tunnel lining (1) or tunnel course (1), the method using pre-fabricated elements of concrete or sandwich structure (3, 4, 5; 73;73′). Interspace between such elements and extending transversely of the direction of the tunnel course or tunnel lining receives an interspace cast (14) using an outer flexible formwork (2) in the form of skirts (2′, 2″) attached to the outside of the elements (3, 4, 5; 73, 73′), and which through interconnection (11) thereof form a flexible, “bag-like” formwork (2) on the outside of the elements (3, 4, 5; 73, 73′). Together with conventional formwork (12) on the inside of the elements (3, 4, 5; 73, 73′) there is formed a defined cavity (13) which can be filled with injectable mass of concrete. After the concrete has hardened it will provide support to the installed elements (3, 4, 5; 73, 73′) as well as providing support relative to exposed surface portion of rock surface (10). The elements (3, 4, 5; 73, 73′) can be provided on the outside with a membrane (17). Further, the elements can be provided with injection paths (16) in order to at any time establish a completely watertight tunnel lining (1).

## Claims

### Claim 1

A method for constructing tunnel courses which are completely or partly surrounded by rock formations and/or are located in open air, the tunnel course in its longitudinal direction consisting of a plurality of mutually separate, pre-fabricated tunnel arch forming structural elements which are intended to be sealed against each other, comprising:
a) installing along a tunnel course at each longitudinal side thereof tunnel element bases and cast these onto masses adjacent the bases,
b) placing from recesses on the bases successively in the longitudinal direction of the tunnel course with mutual distance self-supportive sections each consisting of at least two of said tunnel arch forming elements, wherein the tunnel arch forming elements are made of concrete or sandwich structure,
c) arranging at the outside of the sections at the opening therebetween an outer, flexible formwork,
d) arranging formwork equipment across the opening between the sections at the inside of the sections,
e) injecting concrete through the formwork equipment into a space defined by adjacent tunnel arch forming element sections, said outer flexible formwork and said formwork equipment, so that injected concrete expands the outer, flexible formwork outwardly and laterally at the outside of the tunnel course, and
f) letting the injected concrete harden.

### Claim 2 (depends on 1)

The method according to claim 1, the tunnel course being surrounded by rock masses, wherein feature a) further includes providing the base with a skirt attached thereto along a face of the base facing the inside of the tunnel course, the skirt being configured to form a flexible formwork, and fixedly casting the base into place by filling concrete into a space bordered by the base, neighbouring rock masses and the skirt.

### Claim 3 (depends on 1)

The method according to claim 1, wherein said tunnel arch forming elements are made of concrete and provided on their outside with a watertight membrane.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the outer flexible formwork is provided by using two longitudinal skirts at the upright edges of adjacent tunnel arch forming element, and interconnecting the neighbouring skirts to form the flexible formwork.

### Claim 5 (depends on 1)

The method according to claim 1, wherein each skirt is configured as a net, wherein concrete is injected into said space of which the flexible formwork forms a part until filled by concrete, and wherein some concrete is allowed to penetrate the flexible formwork provided by the interconnected net configured skirts.

### Claim 6 (depends on 4)

The method according to claim 4, the tunnel course being surrounded by rock masses, further comprising letting the injected concrete press the flexible formwork to expand in order to contact a portion of adjacent rock mass.

### Claim 7 (depends on 1)

The method according to claim 1, comprising after the hardening of concrete in feature f) injecting via pre-arranged injection path in upright contact faces on the tunnel arch forming elements sealing mass between the injected, hardened concrete and the adjacent tunnel sections.

### Claim 8 (depends on 1)

The method according to claim 1, comprising injecting, via pre-arranged injection path at contact faces on the tunnel arch forming elements in direction of the tunnel course, sealing mass between adjacent elements of a tunnel section.

### Claim 9 (depends on 1)

The method according to claim 1, wherein a compressible, open-pore mat is located between contact faces of the tunnel arch forming elements in the direction of the tunnel course, and wherein sealing mass is injected via the mat into the space between the contact faces.

### Claim 10 (depends on 1)

The method according to claim 1, further providing a puncturable mat or cushion structure containing sealing mass between opposite edge faces of the tunnel elements located in the direction of the tunnel course, and upon joining the elements to form a tunnel section thereby puncturing the mat or cushion structure to form a sealing between the opposite contact faces.

### Claim 11 (depends on 1)

The method according to claim 1, wherein in a recess of the bases there is located a puncturable mat or cushion structure containing sealing mass to interact with lowermost elements of a tunnel section, and causing the mat or cushion structure to be punctured when the lowermost elements enter the respective recess.

### Claim 12 (depends on 1)

The method according to claim 1, comprising prior to step b) locating in recesses in the bases a fluid spreading mat, and injecting therein a sealing mass to spread the sealing mass in a space between the recesses and lowermost elements of a tunnel section entered into the recesses.

### Claim 13 (depends on 1)

The method according to claim 1, the tunnel course being surrounded by rock masses, further comprising injecting into cavities between the tunnel sections and the rock masses filler means in the form of concrete or loose filler material.

### Claim 14 (depends on 1)

The method according to claim 1, the tunnel course being located in open air, further comprising applying concrete or other covering means to the outside of tunnel sections formed by tunnel arch forming elements.

### Claim 15 (depends on 1)

The method according to claim 1, wherein, following feature f), the tunnel course is completed by casting a tunnel foundation after a membrane is established on a smoothing cast on a bed formed by rock or filler material.

### Claim 16 (depends on 1)

A structural element for use in manufacturing a tunnel course according to the method of claim 1, wherein the element is of concrete or a sandwich structure, and wherein the element on the outside thereof at either edge to be positioned upright and extending in a direction transversely of the longitudinal direction of the tunnel and the element, is provided with a first, outer, flexible formwork half which is configured to be interconnectable with a corresponding second, outer, flexible formwork half on a neighbouring further structural element when said further structural element is positioned next to the first mentioned element, to form a flexible formwork for receiving concrete injected between the adjacent elements and into the flexible formwork.

### Claim 17 (depends on 16)

The structural element according to claim 16, wherein the structural element is made of concrete, and wherein its outside face is provided with a watertight membrane.

### Claim 18 (depends on 16)

The structural element according to claim 16, wherein said outer, flexible formwork halves each consists of attached skirt configured as a net, injectable concrete being locatable in a space defined by the interconnected, flexible formwork halves and opposite upright side edges of adjacent tunnel arch forming structural elements.

### Claim 19 (depends on 18)

The structural element according to claim 18, wherein the net has a mesh width which is small enough to prevent the largest sized added material of the injected concrete to penetrate the net configured flexible formwork, and large enough to allow smaller sized parts of the added material over at least a part of the injection period to penetrate the flexible formwork.

### Claim 20 (depends on 16)

The structural element according to claim 16, configured for a tunnel lining surrounded by rock masses, wherein the flexible formwork has a property of flexibility which allows injected concrete to press the flexible formwork to come to rest against a portion of the rock mass.

### Claim 21 (depends on 16)

The structural element according to claim 16, comprising an injection path moulded-in or arranged in the contact faces of the structural element which extend transversely of the tunnel course, the injection path capable of causing sealing mass to be injected into a space between injected, hardened concrete forming an interspace cast and tunnel arch forming elements adjacent thereto.

### Claim 22 (depends on 16)

The structural element according to claim 16, wherein an injection path, located in at least one of the contact faces of the structural element which extends in the direction of the tunnel course, is provided to allow injection of sealing mass between contact faces of adjacent elements which extend in such a direction.

### Claim 23 (depends on 16)

The structural element according to claim 16, wherein in a space between contact faces of elements extending in the direction of the tunnel course, there is arrangable a compressible, open-pore mat capable of receiving sealing mass to seal said space.

### Claim 24 (depends on 16)

The structural element according to claim 16, wherein sealing in a space between contact faces of elements extending in the direction of the tunnel course is provided by a puncturable mat or cushion structure which contains a sealing mass and to be located in said space.

### Claim 25 (depends on 16)

The structural element according to claim 16, further comprising a puncturable mat and cushion structure containing sealing mass to provide sealing between lowermost elements of the tunnel arch forming elements and corresponding base elements below shaped to receive a lowermost end of said lowermost elements.