# US 2015/0106608 A1 · Power-on scheduling of multiple blades requiring a preboot image from a remote disk

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0106608 A1
- Document ID: US20150106608A1
- Status: Published application
- Kind: A1
- Application number: 14/052,119
- Filed: 2013-10-11
- Published: 2015-04-16
- Earliest claimed: 2013-10-10
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Jimmie L. Brundidge; William G. Pagan; Carlos Santana; Tiviley W. Slack
- Web page: https://patentgrep.com/patent/US20150106608A1

## CPC

- G06F 9/4416: {Network booting; Remote initial program loading [RIPL]}
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method includes obtaining an inventory of hardware devices in each of a plurality of blades, and calculating, for each of the plurality of blades, an amount of boot time to power-on the blade and reach a condition in which the blade is ready to receive a preboot image, wherein the amount of boot time is calculated as a function of the inventory of hardware devices in the blade. In addition, a preboot image load time is identified for each of the plurality of blades. The method then further comprises scheduling power-on of each of the plurality of blades so that a subsequent blade in an order is ready to mount the remote disk and receive the preboot image when a previous blade in the order has received the preboot image and released the remote disk.

## Claims

### Claim 1

A method, comprising:
obtaining an inventory of hardware devices in each of a plurality of blades;
calculating, for each of the plurality of blades, an amount of boot time to power-on the blade and reach a condition in which the blade is ready to receive a preboot image, wherein the amount of boot time is calculated as a function of the inventory of hardware devices in the blade;
identifying a preboot image load time for each of the plurality of blades; and
scheduling power-on of each of the plurality of blades so that a subsequent blade in the order is ready to mount the remote disk and receive the preboot image when a previous blade in the order has received the preboot image and released the remote disk.

### Claim 2 (depends on 1)

The method of claim 1, wherein the blade is ready to receive a preboot image upon completion of the boot power-on-self-test (POST).

### Claim 3 (depends on 1)

The method of claim 1, wherein a blade of the plurality of blades having the shortest boot time is placed first in the order of the plurality of blades to mount the remote disk storing the boot image.

### Claim 4 (depends on 1)

The method of claim 1, wherein the plurality of blades are scheduled to mount the remote disk in an order of ascending boot time.

### Claim 5 (depends on 1)

The method of claim 1, wherein identifying a preboot image load time for each of the plurality of blades, includes identifying a size of the preboot image, identifying a data transfer rate from the remote disk, and dividing the size by the data transfer rate.

### Claim 6 (depends on 5)

The method of claim 5, wherein the same preboot image load time is used for each of the plurality of blades.

### Claim 7 (depends on 1)

The method of claim 1, wherein the plurality of blades are received in a multi-blade chassis.

### Claim 8 (depends on 7)

The method of claim 7, wherein the plurality of blades are blade servers, and the multi-blade chassis include a chassis management module.

### Claim 9 (depends on 8)

The method of claim 8, wherein obtaining an inventory of hardware devices in each of a plurality of blades, includes the chassis management module obtaining an inventory of hardware devices from each of the plurality of blade servers and reporting the inventory of hardware devices for each of the plurality of blade servers to a remote management module.

### Claim 10 (depends on 1)

The method of claim 1, wherein the inventory of hardware devices identifies a capacity of at least one hardware device in the blade, and wherein the calculation of boot time includes the capacity multiplied by a time factor.

### Claim 11 (depends on 10)

The method of claim 10, wherein the inventory of hardware devices identifies an amount of memory in the blade.

### Claim 12 (depends on 1)

The method of claim 1, wherein the inventory of hardware devices identifies a type of at least one hardware device in the blade, and wherein the calculation of boot time includes a predetermined amount of time for the identified type of hardware device.

### Claim 13 (depends on 12)

The method of claim 12, wherein the inventory of hardware devices identifies a type of a network adapter in the blade.

### Claim 14 (depends on 1)

The method of claim 1, further comprising:
identifying a current system state of each of the plurality of blades; and
wherein calculating, for each of the plurality of blades, an amount of boot time to power-on the blade and reach a condition in which the blade is ready to receive a preboot image, includes determining an amount of time to shutdown the blade in response to identifying that the current system state of the blade is powered-on, and adding the amount of time to shutdown the blade into the boot time for the blade.

### Claim 15 (depends on 14)

The method of claim 14, wherein determining an amount of time to shutdown the blade is a function of the hardware inventory for the blade.

### Claim 16 (depends on 14)

The method of claim 14, wherein the amount of time to shutdown the blade is a predetermined amount of time.
