# US 2015/0104259 A1 · Method of construction, installation, and deployment of an offshore wind turbine on a concrete tension leg platform

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0104259 A1
- Document ID: US20150104259A1
- Status: Published application
- Kind: A1
- Application number: 14/121,467
- Filed: 2014-09-09
- Published: 2015-04-16
- Earliest claimed: 2013-09-09
- Assignees: DBD Systems, LLC
- Inventors: Fontain M. Johnson
- Web page: https://patentgrep.com/patent/US20150104259A1

## CPC

- E02D 27/425: {specially adapted for wind motors masts (wind motors per se F03D1/00)}
- B63B 21/26: securing to bed
- B63B 21/502: {by means of tension legs}
- E02D 27/50: Anchored foundations
- E02D 27/525: {using elements penetrating the underwater ground (sinking work pieces E02D15/08, sinking caissons E02D23/02)}
- B63B 2021/505: {Methods for installation or mooring of floating offshore platforms on site}
- B63B 2035/446: {for converting wind energy into electric energy}
- E02B 2017/0078: {Suction piles, suction cans}
- E02B 2017/0091: {Offshore structures for wind turbines}
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)

## Abstract

Method for construction, deployment, and installation of a wind turbine generator on a floating slip formed concrete tension leg platform/spar (WTG foundation) using gravity anchors. A concrete WTG foundation is built with the ‘slip form’ method, a combination construction/deployment dry dock barge (barge) utilizing wing walls for stability allowing the WTG and WTG foundation to be delivered to the installation site as a complete unit. A split hull hydraulic dump scow facilitates the slip form construction and deployment of the slip-formed gravity anchor(s). The barge is sunk as a dry dock to a draft that permits the WTG/WTG foundation to be floated off. The free floating WTG foundation is ballasted with sea water to its operating draft with 5 feet of freeboard. The tension legs from the gravity anchors are attached to the WTG foundation and snugged with equal tension. The sea water is then removed from the WTG foundation. This process tightens the tension legs to their design loads. The WTG/WTG foundation maintains a relatively large water plane and a 5 foot freeboard. The gravity anchor(s) is constructed from slip formed concrete on a split hull hydraulic dump scow and deployed to the installation site, with tension legs attached for deployment and attachment to the WTG platform.

## Claims

### Claim 1

Method for installation of a wind turbine generator “WTG” on a floating concrete tension leg platform/spar, comprising the steps of:
constructing a WTG foundation on a construction barge dry dock having wing walls for stability using a slip form concrete pouring method;
forming at least one gravity anchor in a split hull scow at a dock using a slip form method and deploying same to the installation site;
installing a wind turbine generator on said construction barge dry dock;
towing the construction barge to the installation site using tugs delivering WTG and WTG foundation to installation site as a complete unit;
sinking said at least one gravity anchor at a selected off shore deep water site;
sinking said construction barge to a selected draft such that the WTG foundation with the WTG thereon floats off of the barge (dry dock mode), wherein the WTG foundation with the WTG thereon floats freely and is stable having a positive GM;
refloating said construction barge dry dock with its self-contained pumping system for return to dock;
ballasting the WTG foundation with sea water until it reaches its selected operating draft maintaining stability throughout the process;
positioning the WTG foundation over said at least one gravity anchor;
attaching a plurality of tendons leading from said at least one gravity anchor to the said WTG foundation; and
and establishing the proper tension in said tendons extending between said WTG foundation and said at least one gravity anchor.