# US 2015/0102177 A1 · Using wayside signals to optimize train driving under an overarching railway network safety system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0102177 A1
- Document ID: US20150102177A1
- Status: Published application
- Kind: A1
- Application number: 14/050,914
- Filed: 2013-10-10
- Published: 2015-04-16
- Earliest claimed: 2013-10-10
- Assignees: New York Air Brake Corporation
- Applicants: New York Air Brake Corporation
- Inventors: Jeffrey S. TIPPEY; Sean ADAMS; Sung-Ho JEE; Graham HAUSLER; Wade GOFORTH
- Web page: https://patentgrep.com/patent/US20150102177A1

## CPC

- B61L 3/125: {using short-range radio transmission}
- B61L 15/0027: {Radio-based, e.g. using GSM-R}
- B61L 15/0058: {On-board optimisation of vehicle or vehicle train operation}
- B61L 25/025: {Absolute localisation, e.g. providing geodetic coordinates}
- B61L 27/16: Trackside optimisation of vehicle or train operation
- B61L 27/20: Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)

## Abstract

Disclosed embodiments provide a system and methodologies that provide an optimized train driving strategy using wayside signaling while conforming to the requirements of a wayside track safety system, e.g., the “Automatic Train Protection” (ATP) System.

## Claims

### Claim 1

A train navigation system that captures and analyzes data from a train protection system , the train navigation system comprising:
a bi-directional communication link that includes at least one antenna that receives signaling from a plurality of wayside transponders, that signaling including train protection system data; and
a processor that determines a location of the train and formulates commands or instructions for optimized train driving based on analysis of received wayside transponder signaling data,
wherein the train navigation system is on board a train and part of an on-train, train control and operator assistance system, and
wherein the processor determines the commands or instructions based on the location of the train in response to the received wayside transponder signaling so that a service interruption is not triggered under rules of the train protection system.

### Claim 2 (depends on 1)

The train navigation system of claim 1, wherein the train protection system controls train speed and directs train routes through solid state wayside equipment via lamp signalling

### Claim 3 (depends on 1)

The train navigation system of claim 1, wherein the train protection system controls train speed and directs train routes via wireless transmission of train protection system signals to trains.

### Claim 4 (depends on 1)

The train navigation system of claim 1, wherein the train protection system tracks the location of the train and makes sure that the train does not pass its Limit of Authority.

### Claim 5 (depends on 1)

The train navigation system of claim 1, wherein the train protection system is an Automatic Train Protection system.

### Claim 6 (depends on 1)

The train navigation system of claim 1, wherein the train protection system is a Positive Train Control system.

### Claim 7 (depends on 1)

The train navigation system of claim 1, wherein, if the train exceeds safety thresholds of the train protection system, the train protection system triggers either a penalty brake application to slow the train or an emergency intervention.

### Claim 8 (depends on 1)

The train navigation system of claim 1, wherein a time to service intervention signal is captured and analyzed along with current train dynamics and train dynamic look ahead data to determine an optimized train driving strategy.

### Claim 9 (depends on 8)

The train navigation system of claim 8, wherein the time to service intervention signal is a measure of the time, at a current train speed, from which the on-train, train control and operator assistance system would apply an intervention or penalty brake to alter operation of the train.

### Claim 10 (depends on 8)

The train navigation system of claim 8, wherein analysis of the time to service intervention signal determines whether the time to service intervention is greater than zero plus a threshold value, the threshold value being a configurable parameter measured in seconds.

### Claim 11 (depends on 1)

The train navigation system of claim 1, wherein target speed and target speed location data are captured and the on-train, train control and operator assistance system makes a future prediction regarding speed of the train at the target position.

### Claim 12 (depends on 11)

The train navigation of claim 11, wherein the future prediction exceeds a maximum speed allowed by the train protection system.

### Claim 13 (depends on 1)

The train navigation system of claim 1, wherein the processor also determines location of the train using Global Positions System data received via the bi-directional communication link.

### Claim 14 (depends on 1)

The train navigation system of claim 1, further comprising a user interface coupled to the processor, and wherein the processor formulates and outputs driving advice to a train operator of the train via the user interface.

### Claim 15 (depends on 6)

The train navigation system of claim 6, wherein the processor outputs driving advice that takes into consideration the speed restrictions for upcoming track segments along a current track profile.

### Claim 16

A method of providing commands for train operation or advice to a train operator, the method comprising:
receiving signaling from plurality of wayside transponders via a bi-directional communication link that includes at least one antenna, that signaling including train protection system data;
determining, by a processor, a location of the train and formulating commands or instructions for optimized train driving based on analysis of received wayside transponder signaling data, wherein the processor and the bi-directional communication link are on board a train and part of an on-train, train control and operator assistance system; and
wherein the processor determines the commands or instructions based on the location of the train in response to the received wayside transponder signaling so that a service interruption is not triggered under rules of the train protection system.

### Claim 17 (depends on 16)

The method of claim 16, further comprising tracking the location of the train and ensuring the train does not pass its Limit of Authority.

### Claim 18 (depends on 16)

The method of claim 16, wherein the train protection system is an Automatic Train Protection system.

### Claim 19 (depends on 16)

The method of claim 16, wherein the train protection system is a Positive Train Control system.

### Claim 20 (depends on 16)

The method of claim 16, wherein, if the train exceeds safety thresholds of the train protection system, the train protection system triggers either a penalty brake application to slow the train or an emergency intervention.

### Claim 21 (depends on 16)

The method of claim 16 wherein a time to service intervention signal is captured and analyzed along with current train dynamics and train dynamic look ahead data to determine an optimized train driving strategy.

### Claim 22 (depends on 21)

The method of claim 21, wherein the time to service intervention signal is a measure of the time, at a current train speed, from which the on-train, train control and operator assistance system would apply an intervention or penalty brake to alter operation of the train.

### Claim 23 (depends on 21)

The method of claim 21, wherein analysis of the time to service intervention signal determines whether the time to service intervention is greater than zero plus a threshold value, the threshold value being a configurable parameter measured in seconds.

### Claim 24 (depends on 1)

The method of claim 1, wherein target speed and target speed location data are captured and the on-train, train control and operator assistance system makes a future prediction regarding speed of the train at the target position.

### Claim 25 (depends on 24)

The method of claim 24, wherein the future prediction exceeds a maximum speed allowed by the train protection system.
