# US 2015/0101811 A1 · Method of treating a downhole formation using a downhole packer

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0101811 A1
- Document ID: US20150101811A1
- Status: Published application
- Kind: A1
- Application number: 14/050,792
- Filed: 2013-10-10
- Published: 2015-04-16
- Earliest claimed: 2013-10-10
- Assignees: Thru Tubing Solutions, Inc.
- Inventors: Brock Watson; Roger Schultz; Andy Ferguson; Mark Britton
- Web page: https://patentgrep.com/patent/US20150101811A1

## CPC

- E21B 43/26: by forming crevices or fractures
- E21B 23/006: {"J-slot" systems, i.e. lug and slot indexing mechanisms}
- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B 33/1291: {anchor set by wedge or cam in combination with frictional effect, using so-called drag-blocks (E21B33/1295 takes precedence)}
- E21B 33/1292: {with means for anchoring against downward and upward movement}
- E21B 34/06: in wells
- E21B 43/114: Perforators using direct fluid action {on the wall to be perforated}, e.g. abrasive jets
- E21B 43/14: Obtaining from a multiple-zone well
- E21B 2200/04: Ball valves
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

This disclosure is directed to a method of using a packer having at least two areas of relative rotation. The disclosure is further directed toward a method of using a packer incorporating a jet port, a highly debossed mandrel and/or a J-pin rotatably disposed within a drag block assembly for continuously and redundantly engaging a J-slot area disposed in the mandrel.

## Claims

### Claim 1

A method, the method comprising:
running a packer downhole into a casing adjacent to a formation, the packer comprising:
a packer supported by downhole piping, the packer having a mandrel, a top sub for connecting the packer to other downhole tools and three or more areas of relative rotation between components of the packer wherein one area of relative rotation exists between the top sub and the mandrel;
setting the packer in the casing;
abrasively perforating the formation to create perforations therein; and
fracturing the perforations in the formation.

### Claim 2 (depends on 1)

The method of claim 1 wherein the step of setting the packer in the casing is done before or after the step of abrasively perforating the formation to create perforations therein.

### Claim 3 (depends on 2)

The method of claim 2 further comprising the steps of:
unsetting the packer in the casing;
moving the packer to a plurality of locations in the casing without removing the packer from the casing;
resetting the packer at each location the packer is moved to in the casing;
abrasively perforating the formation at each location to create additional perforations therein; and
fracturing the additional perforations in the formation at each location.

### Claim 4

(canceled)

### Claim 5 (depends on 1)

The method of claim 1 wherein the packer further comprises:
at least one packer element disposed around a portion of the mandrel for hydraulically sealing an upper area in a casing from a lower area in the casing;
a wedge element disposed around a portion of the mandrel adjacent to the at least one packer element;
at least one slip element disposed around the mandrel adjacent to the wedge element; and
a drag block assembly disposed around a portion of the mandrel to frictionally engage the casing.

### Claim 6 (depends on 1)

The method of claim 1 wherein one of the areas of relative rotation for the packer is the drag block assembly rotation relative to the mandrel.

### Claim 7 (depends on 1)

The method of claim 1 wherein the packer further comprises a J-pin rotatably disposed within the drag block assembly.

### Claim 8 (depends on 7)

The method of claim 7 wherein the third area of relative rotation is the J-pin rotation relative to the drag block assembly.

### Claim 9 (depends on 5)

The method of claim 5 wherein the packer further comprises a jet port disposed therein above the at least one packer element to circulate fluid outside the packer and above the at least one packer element to prevent sand accumulation during fracturing and perforating operations when the packer is in a set position, the jet port in fluid communication with the downhole piping.

### Claim 10 (depends on 9)

The method of claim 9 wherein the jet port is disposed in a top sub of the packer, the top sub having a first interior portion in fluid communication with the downhole piping, a second interior portion in fluid communication with an area in the casing below the at least one packer, and a fluid blocking member disposed therebetween.

### Claim 11 (depends on 5)

The method of claim 5 wherein the downhole piping is coiled tubing.

### Claim 12

A method, the method comprising:
running a packer downhole into a casing adjacent to a formation, the packer comprising:
a mandrel having a plurality of debossed areas in addition to a J-slot area to reduce places where sand can accumulate and prevent operation of the packer and a plurality of constantly open holes disposed in the side of the mandrel outside of the J-slot area to provide constant fluid communication between an inner portion of the mandrel and an annular space between the mandrel and the casing;
setting the packer in the casing;
abrasively perforating the formation to create perforations therein; and
fracturing the perforations in the formation.

### Claim 13 (depends on 12)

The method of claim 12 wherein the step of setting the packer in the casing is done before or after the step of abrasively perforating the formation to create perforations therein.

### Claim 14 (depends on 13)

The method of claim 13 further comprising the steps of:
unsetting the packer in the casing;
moving the packer to a plurality of locations in the casing without removing the packer from the casing;
resetting the packer at each location the packer is moved to in the casing;
abrasively perforating the formation at each location to create additional perforations therein; and
fracturing the additional perforations in the formation at each location.

### Claim 15 (depends on 14)

The method of claim 14 wherein at least 50 percent of the mandrel's cylindrical surface area is debossed.

### Claim at position 16

16-23. (canceled)

### Claim 24 (depends on 1)

The method of claim 1 wherein the packer further comprises a check valve to permit pressurized fluid to flow from below at least one packer element of the packer to above the at least one packer element when pressure of fluid below the at least one packer element gets a predetermined amount higher than the pressure of fluid above the at least one packer element.

### Claim 25 (depends on 24)

The method of claim 24 wherein the check valve is a ball check valve and the packer has a hole disposed therein for permitting fluid passing through the check valve to exit the packer.

### Claim 26 (depends on 1)

The method of claim 1 wherein each area of relative rotation can be 360° in at least one direction.
