# US 2015/0101504 A1 · Tie plugging machine and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0101504 A1
- Document ID: US20150101504A1
- Status: Published application
- Kind: A1
- Application number: 14/510,286
- Filed: 2014-10-09
- Published: 2015-04-16
- Earliest claimed: 2013-10-10
- Assignees: Racine Railroad Products, Inc.
- Applicants: Racine Railroad Products, Inc.
- Inventors: David M. Brenny; Christopher M. Brenny
- Web page: https://patentgrep.com/patent/US20150101504A1

## CPC

- E01B 31/24: Forming, treating, reconditioning, or cleaning holes in sleepers; Drilling-templates (E01B29/28, E01B31/26 take precedence)
- E01B 31/26: Inserting or removing inserts or fillings for holes in sleepers, e.g. plugs, sleeves
- E01B: PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K)

## Abstract

A railroad tie maintenance vehicle is configured to seal spike holes in a railroad tie formed by the removal of railroad spikes. The vehicle includes a chassis with an integrated operator work station. The vehicle may move along railroad tracks with a plurality of wheels that support the chassis and that are configured to engage at least one railroad track. A motive power source, supported on the chassis, may be controlled by an operator within the operator work station to propel the vehicle along the railroad tracks. At least one storage vessel on the chassis contains a chemical solution used to fill the spike holes. At least two injection devices on the chassis are remotely controlled by the single operator, possibly by the operation of a single controller such as a joystick, to move into alignment with respective spike holes and to fill the spike holes with the chemical solution.

## Claims

### Claim 1

A railroad tie maintenance vehicle for dispensing a chemical into spike holes in a railroad tie, comprising:
a chassis having an area defining an operator work station;
a plurality of wheels that support the chassis and that are configured to engage at least one railroad track;
a storage vessel secured on the chassis and containing a chemical solution;
at least two injection devices located on the chassis and configured to dispense the chemical solution into the spike holes;
a powered actuator assembly that is operable to move the at least two injection devices relative to the chassis;
at least one controller in the operator work station and operable by a single operator within the work station to control the powered actuator assembly to move the at least two injection devices relative to the chassis to a location in alignment with the spike holes and to dispense the chemical solution into the spike holes.

### Claim 2 (depends on 1)

The railroad tie maintenance vehicle of claim 1, further comprising:
a work head supporting the injection devices, the work head being supported on and movable longitudinally relative to the chassis.

### Claim 3 (depends on 2)

The railroad tie maintenance vehicle of claim 2, further comprising controls that drive the work head to move relative to the chassis to position the injection devices at a location proximate to the spike holes without operator input.

### Claim 4 (depends on 3)

The railroad tie maintenance vehicle of claim 3, wherein the actuator assembly is configured to move the injection devices vertically, laterally, and longitudinally relative to the work head.

### Claim 5 (depends on 3)

The railroad tie maintenance vehicle of claim 3, further comprising:
at least one swing arm supported on the work head and configured to be driven by the actuator assembly to move the injection devices in a swinging motion laterally and vertically relative to the work head.

### Claim 6 (depends on 1)

The railroad tie maintenance vehicle of claim 1, wherein the at least one controller includes a joystick manually operable by the single operator to simultaneously control operation of both of the injection devices.

### Claim 7 (depends on 6)

The railroad tie maintenance vehicle of claim 6, wherein the joystick is configured to allow the single operator to control the powered actuator assembly to move the at least two injection devices simultaneously, in tandem, and to dispense a chemical from both injection devices.

### Claim 8 (depends on 1)

The railroad tie maintenance vehicle of claim 1, further comprising a crawler assembly in direct contact with a railbed and configured to support the vehicle and to transfer a motive power from an on-board motive power source to propel the vehicle.

### Claim 9 (depends on 1)

The railroad tie maintenance vehicle of claim 1, further comprising a debris removal device configured to remove debris on the railroad tie obstructing the spike hole.

### Claim 10

A railroad tie maintenance vehicle for sealing spike holes in a tie of a railway comprising:
a chassis including an operator work station;
a plurality of wheels that support the chassis and that are configured to engage at least one railroad track;
a motive power source that is supported on the chassis and that propels the vehicle to move along the railway;
a work head that is mounted on the chassis and that is movable longitudinally relative to the chassis;
a source of chemical solution mounted on the chassis;
at least two injection devices that are supported on the work head and that are configured to receive the chemical solution from the source and to dispense the chemical solution into the spike holes;
a powered actuator assembly that is operable to move the at least two injection devices vertically, laterally, and longitudinally relative to the chassis; and
at least one controller in the operator work station and operable by a single operator within the work station to control the powered actuator assembly to move the at least two injection devices relative to the chassis to a location in alignment with the spike holes and to dispense the chemical solution into the spike holes.

### Claim 11 (depends on 11)

The railroad tie maintenance vehicle of claim 11, further comprising at least one swing arm which is supported on the work head and which supports at least one of the injection devices, the swing arm being configured to move the injection device laterally and vertically relative to the work head.

### Claim 12 (depends on 11)

The railroad tie maintenance vehicle of claim 11, further comprising:

### Claim 13 (depends on 11, 13)

an automatically operated drive that moves the work head relative to the chassis based on a measured speed of the vehicle and a known distance between successive railroad ties. The railroad tie maintenance vehicle of claim 11, wherein the at least one controller includes a joystick manually operable by the single operator in the work station to simultaneously control operation of both of the injection devices. The railroad tie maintenance vehicle of claim 13, wherein the joystick is configured to allow the single operator to control the powered actuator assembly to move the at least two injection devices simultaneously, in tandem, and to dispense the chemical solution from both injection devices.

### Claim 14 (depends on 13)

The railroad tie maintenance vehicle of claim 13, wherein the source of chemical solution comprises first and second tanks storing respective component of the solution, and wherein the components are mixed by the injection devices prior to be dispensed therefrom.

### Claim 15

A method of operating a railroad tie maintenance vehicle to seal spike holes in a railroad tie of a railway comprising the steps of
via action of a single operator, manually operating at least one controller supported on chassis of a vehicle travelling along a railway to
a) move at least two injection devices relative to the chassis into alignment with respective spike holes of the railroad tie; and
b) control the dispensing of a chemical solution into the spike holes.

### Claim 16 (depends on 16)

The method of claim 16, wherein the operating step comprises manipulating a single controller to remotely control operation of the at least two injection devices.

### Claim 17 (depends on 17)

The method of claim 17, wherein the operating step causes the at least two injection devices to move in tandem longitudinally and laterally relative to the chassis.

### Claim 18 (depends on 16)

The method of claim 16, further comprising the steps of:
automatically moving the at least two injection devices, relative to the chassis, to an approximate location above the spike holes based on a prevailing speed of the vehicle and a known distance between successive railroad ties.

### Claim 19 (depends on 19)

The method of claim 19, wherein the step of manually operating occurs simultaneously with or after the step of automatically moving.

### Claim 20 (depends on 15)

The method of claim 15, further comprising removing a debris from a surface of the railroad tie with a retractable debris removal device supported on the chassis.
