Traffic measuring period control system for measuring energy of router and method therefor
AssigneeKorea Advanced Institute of Science and Technology
InventorsHong-shik Park, Young-min Kim, Eun-jung Lee
Life of this patent
Estimating the term…
Abstract
Disclosed are a traffic measuring period control system for measuring energy of a router and a method therefor. The traffic measuring period control system comprises: a state measurement unit for measuring a traffic road or energy consumption of the router, and a measuring period setting unit for setting the traffic measuring period on the basis of the measured traffic load value and the measured energy consumption value, and the state measurement unit can measure the traffic load of the router according to the set traffic measuring period.
Claims21
A traffic measuring period control system, comprising:
- a state measurement unit for measuring a traffic load value of a router;
- and
- a measuring period setting unit for setting the traffic measuring period on the basis of the measured traffic load value and the measured energy consumption value, and
- wherein the state measurement unit can measure the traffic load of the router according to the set traffic measuring period.
As a method of a traffic measuring period control system for controlling a traffic measuring period, the traffic measuring period control method comprises:
- a step of measuring a traffic load of a router;
- a step of calculating an energy consumption rate of the router by using the measured traffic load value and the maximum energy consumption value of the router and maximum traffic load value of the router and setting a traffic measuring period based upon the calculated value;
- and
- a step of measuring the traffic load of the router in accordance with the set traffic measuring period.
A traffic measuring period control system, comprising:
- a state management unit for measuring a traffic load value in accordance with a traffic load measuring period of a router,
- a measuring period setting unit for setting an energy profile model and the traffic measuring period by using a traffic load value measured by the state management unit, a maximum traffic load value and a maximum energy consumption value of the corresponding router, and a network congestion notification value,
- a statistical model storage unit for receiving and storing a traffic load value from the state management unit, and storing statistical information respective to an energy profile model from the measuring period setting unit,
- a network congestion state notification unit for providing the network congestion notification value to the measuring period setting unit, and
- a router basic information storage unit for providing a maximum energy consumption value and a maximum traffic load value to the measuring period setting unit.
21-24. (canceled)
Dependencies are inferred from the claim text.