# US 2015/0089510 A1 · Device, system, apparatus, method and program product for scheduling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0089510 A1
- Document ID: US20150089510A1
- Status: Published application
- Kind: A1
- Application number: 14/482,025
- Filed: 2014-09-10
- Published: 2015-03-26
- Earliest claimed: 2013-09-24
- Assignees: Kabushiki Kaisha Toshiba
- Applicants: Kabushiki Kaisha Toshiba
- Inventors: Yasuyuki KOZAKAI
- Web page: https://patentgrep.com/patent/US20150089510A1

## CPC

- G06F 9/4401: Bootstrapping (security arrangements therefor G06F21/57)
- G06F 9/45558: {Hypervisor-specific management and integration aspects}
- G06F 9/4887: {involving deadlines, e.g. rate based, periodic}
- G06F 9/5077: {Logical partitioning of resources; Management or configuration of virtualized resources (specific details on emulation or internal functioning of virtual machines G06F9/455)}
- G06F 2009/45575: {Starting, stopping, suspending or resuming virtual machine instances}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A scheduling device according to embodiment may comprise a controller, a load calculator, a resource calculator. The controller may be configured to obtain an execution history of one or more tasks operating on a virtual OS. The load calculator may be configured to calculate a first resource amount required by each task based on the execution history. The resource calculator may be configured to calculate a second resource to be assigned to the virtual OS based on the first resource amount calculated for the one or more tasks.

## Claims

### Claim 1

A scheduling device comprising:
a controller configured to obtain an execution history of one or more tasks operating on a virtual OS;
a load calculator configured to calculate a first resource amount required by each task based on the execution history; and
a resource calculator configured to calculate a second resource to be assigned to the virtual OS based on the first resource amount calculated for the one or more tasks.

### Claim 2 (depends on 1)

The device according to claim 1, wherein
the controller is further configured to obtain an execution cycle of the one or more tasks, and
the load calculator is further configured to calculate an execution time for each cycle of each task based on the execution history, and calculate the first resource amount required by each task based on the execution time for each cycle.

### Claim 3 (depends on 1)

The device according to claim 1, wherein
the execution history includes a start time and an ending time of each task, and
the load calculator is further configured to calculate the execution time for each cycle based on the start time and the eliding time of each task.

### Claim 4

A scheduling device comprising:
a load calculator configured to obtain a first resource amount required by each of one or more tasks operating on a virtual OS; and
a resource calculator configured to calculate a second resource amount to be assigned to the virtual OS based on the first resource amounts,
wherein the load calculator is further configured to calculate the first resource amount by adding a first margin depending on en execution cycle of an execution time for each cycle to a third resource amount being a minimum resource amount required by each cask.

### Claim 5 (depends on 4)

The device according to claim 4, wherein the load calculator is farther configured to calculate the first margin using at least one of a time length of the execution cycle, a time length of the execution time for each cycle, a dispersion of the execution cycle, a standard deviation of the execution cycle, and a value calculated by subtracting a minimum value from a maximum value among execution times for each cycle of the one or more tasks.

### Claim 6 (depends on 4)

The device according to claim 4, wherein the load calculator is further configured to add the first margin greater than the execution time for each cycle included in the third resource amount calculated for a task with a long execution cycle.

### Claim 7 (depends on 4)

The device according to claim 4, wherein the load calculator is further configured to calculate a third resource amount using the first resource amount, and calculate the second resource amount by adding a second margin depending on an execution cycle of an execution time for each cycle of each task to the third resource amount.

### Claim 8 (depends on 7)

The device according to claim 7, wherein the resource calculator is further configured to calculate the second margin using at least a dispersion of the execution cycle of the one or more tasks, a standard deviation of the execution cycle, and a value calculated by subtracting a minimum value from a maximum value among execution times for each cycle of the one or more tasks.

### Claim 9 (depends on 7)

The device according to claim 7, wherein the resource calculator is further configured to add the second margin so that the smaller the dispersion of the execution cycle of the one or more tasks is, the greater the second margin with respect to the third resource becomes.

### Claim 10 (depends on 1)

A data processing system comprising:
the scheduling device according to claim 1; and
a server connected no the scheduling device via a certain network and configured to execute the virtual OS,
wherein the controller is further configured to transmit a first message for requiring a transmission of the execution history to the server, receive a second message including the execution history from the server, and transmit a third message including the second resource amount calculated by the resource calculator to the server, and
the server is further configured to, when receiving the first message, obtain the execution history by measuring the one or more tasks, transmit the second message including the measured execution history to the scheduling device, and reduce a resource amount assigned to the virtual OS based on the second resource amount included in the receive third message.

### Claim 11 (depends on 10)

The system according to claim 10, wherein
the controller is further configured to transmit a fourth message including a third resource amount before transmitting the first message to the server, and
the third resource amount is equal to or greater than at least the second resource amount.

### Claim 12 (depends on 1)

A data processing device comprising:
the scheduling device according to claim 1; and
one or more computers configured to execute the virtual OS,
wherein the controller is further configured to assign the second resource amount calculated by the resource calculator to the virtual OS.

### Claim 13

A scheduling method including:
obtaining an execution history of: one or more tasks operating on a virtual OS;
calculating a first resource amount required by each task based on the execution history; and
calculating a second resource amount to be assigned to the virtual OS based on the first resource amount calculated for the one or mere tasks.

### Claim 14

A scheduling method including:
calculating a first resource amount being a minimum resource amount required by the one ox: more tasks operating on the virtual OS;
calculating a second resource amount required by the one or more tasks by adding a margin depending on an execution cycle or an execution time for each cycle of each task to the first resource; and
calculating a second resource amount to be assigned to the virtual OS base on the second resource amount.

### Claim 15

A non-transitory computer-readable program product storing instructions for letting a computer processor schedule an assignment of resources to a virtual OS executing one or more tasks, the instructions including:
obtaining an execution history of one or more tasks operating on a virtual OS;
calculating a first resource amount required by each task based on the execution history; and
calculating a second resource amount to be assigned to the virtual OS based on the first resource amount calculated for the one or more tasks.

### Claim 16

A non-transitory computer-readable program product storing instructions for letting a computer processor schedule an assignment of resources to a virtual OS executing one or more tasks, the instructions including:
calculating a first resource amount being a minimum resource amount required by the one or more tasks operating on the virtual OS;
calculating a second resource amount required by the one or more tasks by adding a margin depending on an execution cycle or an execution time for each cycle of each task to tine first resource; and
calculating a second resource amount to be assigned to the virtual OS base on the second resource amount.