# US 2015/0088571 A1 · System and method for task assignment in workflows

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0088571 A1
- Document ID: US20150088571A1
- Status: Published application
- Kind: A1
- Application number: 14/036,867
- Filed: 2013-09-25
- Published: 2015-03-26
- Earliest claimed: 2013-09-25
- Assignees: Sap SE
- Inventors: Tianyu Luwang; Wen-Syan Li
- Web page: https://patentgrep.com/patent/US20150088571A1

## CPC

- G06Q 10/063118: {Staff planning in a project environment}
- G06Q 10/06311: {Scheduling, planning or task assignment for a person or group}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

The method includes determining an assignment completion time distribution based on a task set defining a project, determining a project completion time distribution based on the assignment completion time distribution and the task set, determining a project cost based on assignments of the task set, and generating a list of project task assignments based on the project cost and the project completion time distribution.

## Claims

### Claim 1

A method, comprising:
determining an assignment completion time distribution based on a task set defining a project;
determining a project completion time distribution based on the assignment completion time distribution and the task set;
determining a project cost based on assignments of the task set; and
generating a list of project task assignments based on the project cost and the project completion time distribution.

### Claim 2 (depends on 1)

The method of claim 1, wherein the assignment completion time distribution includes a time distribution or time range for each task in the task set, the time distribution or time range being based on a completion time associated with each of a set of candidate assignments.

### Claim 3 (depends on 1)

The method of claim 1, wherein determining the project completion time distribution includes determining a plurality of project completion times.

### Claim 4 (depends on 1)

The method of claim 1, wherein
determining the project completion time distribution includes determining a plurality of project completion times, and
each of the plurality of project completion times includes a randomly selected assignment for a task of the task set.

### Claim 5 (depends on 1)

The method of claim 1, wherein
determining the project completion time distribution includes determining a plurality of project completion times, and
each of the plurality of project completion times is based on at least one of a task group and a task dependency.

### Claim 6 (depends on 1)

The method of claim 1, wherein the project cost is a combined cost associated with each task of the task set, the combined cost being based on a cost associated with completing the task and a risk cost based on an overdue project.

### Claim 7 (depends on 1)

The method of claim 1, wherein the list of project task assignments is filtered based on the project cost and the project completion time distribution.

### Claim 8 (depends on 1)

The method of claim 1, wherein the list of project task assignments is ranked based on the project cost and the project completion time distribution.

### Claim 9 (depends on 1)

The method of claim 1, wherein
the list of project task assignments is ranked based on the project cost and the project completion time distribution, and
upon determining a new entry is ranked above an lowest ranked existing entry, the existing entry is dropped from the list and the new entry is added to the list.

### Claim 10

A non-transitory computer-readable storage medium having stored thereon computer executable program code which, when executed on a computer system, causes the computer system to perform steps comprising:
determine an assignment completion time distribution based on a task set defining a project;
determine a project completion time distribution based on the assignment completion time distribution and the task set;
determine a project cost based on assignments of the task set; and
generate a list of project task assignments based on the project cost and the project completion time distribution.

### Claim 11 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein the assignment completion time distribution includes a time distribution or time range for each task in the task set, the time distribution or time range being based on a completion time associated with each of a set of candidate assignments.

### Claim 12 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein determining the project completion time distribution includes determining a plurality of project completion times.

### Claim 13 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein
determining the project completion time distribution includes determining a plurality of project completion times, and
each of the plurality of project completion times includes a randomly selected assignment for a task of the task set.

### Claim 14 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein
determining the project completion time distribution includes determining a plurality of project completion times, and
each of the plurality of project completion times is based on at least one of a task group and a task dependency.

### Claim 15 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein the project cost is a combined cost associated with each task of the task set, the combined cost being based on a cost associated with completing the task and a risk cost based on an overdue project.

### Claim 16 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein the list of project task assignments is filtered based on the project cost and the project completion time distribution.

### Claim 17 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein the list of project task assignments is ranked based on the project cost and the project completion time distribution.

### Claim 18 (depends on 10)

The non-transitory computer-readable storage medium of claim 10, wherein
the list of project task assignments is ranked based on the project cost and the project completion time distribution, and
upon determining a new entry is ranked above an lowest ranked existing entry, the existing entry is dropped from the list and the new entry is added to the list.

### Claim 19

An apparatus including a processor and a non-transitory computer readable medium, the apparatus comprising:
a task assignment module configured to determine an assignment completion time distribution based on a task set defining a project;
a project completion module configured to determine a project completion time distribution based on the assignment completion time distribution and the task set;
a project cost module configured to determine a project cost based on assignments of the task set; and
an assignment combination module configured to generate a list of project task assignments based on the project cost and the project completion time distribution.

### Claim 20 (depends on 19)

The apparatus of claim 19, wherein the assignment combination module is further configured to rank the list of project task assignments based on the project cost and the project completion time distribution.
