# US 2015/0088312 A1 · Smart building management system and multi-building management system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0088312 A1
- Document ID: US20150088312A1
- Status: Published application
- Kind: A1
- Application number: 14/282,018
- Filed: 2014-05-20
- Published: 2015-03-26
- Earliest claimed: 2013-09-26
- Assignees: Delta Electronics, Inc.
- Applicants: Delta Electronics, Inc.
- Inventors: Tien-Szu LO; Meng-Seng CHEN; Hsueh-Hsing CHAO
- Web page: https://patentgrep.com/patent/US20150088312A1

## CPC

- G05B 15/02: electric
- G05B 2219/2642: Domotique, domestic, home control, automation, smart house
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A smart building management system manages a building for providing smart analyses and strategies. The management system connects with plural hardware devices in the building and receives the data and statuses replied by the hardware devices, and further analyzes the maintenance statuses and energy consumption statuses of the hardware devices. Then the management system gathers the statistics of the total energy consumption statuses of the building according to the energy consumption statuses of the hardware devices. The management system receives the requests of users through a graphic user interface. The management system plans an energy-saving strategy based on the maintenance statuses of the hardware devices and the requests of users, and adjusts the hardware devices depending on the energy-saving strategy. Therefore, the total energy consumption statuses of the building meet an energy-saving target set by users in advance.

## Claims

### Claim 1

A smart building management system (1) for managing a building (2), comprising:
a graphic user interface (11), receiving requests from a user in an authority limit of a user account, and providing functions and data of the authority limit;
an account manager (12), connecting with the graphic user interface (11), managing the user account registered by the user, and setting the authority limit of the user account;
a building equipment control module (15), connecting with a plurality of hardware devices (41) through an industrial control system (ICS) (4) in the building (2) in order to be a connecting interface between the smart building management system (1) and the plurality of hardware devices (41);
a building management sub-system (13), connecting with the graphic user interface (11) and the building equipment control module (15), receiving data and equipment statuses replied by the hardware devices (41), analyzing maintenance statuses of the hardware devices (41) and a total energy consumption of the building (2), and displaying on the graphic user interface (11); and
a task execution module (14), connecting with the building management sub-system (13) and the building equipment control module (15), making schedules to a plurality of tasks established by the building management sub-system (13) and executing the plurality of tasks according to the schedules;
wherein the building management sub-system (13) establishes the plurality of tasks based on the maintenance statuses of the hardware devices (41) and the requests from the user, and the task execution module (14) executes the tasks to adjust the hardware devices (41), so that the total energy consumption of the building (2) meets an energy-saving target set by the user.

### Claim 2 (depends on 1)

The smart building management system (1) according to claim 1, further comprising a database (17), connecting with the building equipment control module (15) and the hardware devices (41), storing the data and the equipment statuses replied by the hardware devices (41), and being accessed by the building management sub-system (13) and the task execution module (14) through the building equipment control module (15).

### Claim 3 (depends on 2)

The smart building management system (1) according to claim 2, wherein the building management sub-system (13) comprises:
an energy management sub-system (132), collecting operating timing of the hardware devices (41), and analyzing the energy consumption and loading statuses in order to gather statistics of the total energy consumption statuses of the building (2);
a maintenance management sub-system (133), collecting down time data, maintenance time, and maintenance flow charts of the hardware devices (41), receiving the data and the equipment statuses replied by the hardware devices (41) so as to analyze maintenance statuses of the hardware devices (41) and send a notice when maintenance is needed;
a quality of service management sub-system (134), gathering statistics of the requests from the user, and analyzing a progress and quality of a service provided by the smart building management system (1) for the requests; and
a planning and optimization sub-system (131), connecting with the energy management sub-system (132), the maintenance management sub-system (133) and the quality of service management sub-system (134), the planning and optimization sub-system (131) executing optimization of the smart building management system (1) according to the requests of the user, the maintenance statuses of the hardware devices (41), and the total energy consumption of the building (2), and planning an energy-saving strategy;
wherein the energy-saving strategy comprises the plurality of tasks that are executed by the task execution module (14).

### Claim 4 (depends on 3)

The smart building management system (1) according to claim 3, wherein the energy-saving strategy comprises a hardware replacing strategy and a software analyze strategy, the hardware replacing strategy comprising estimating a cost to replace the hardware devices (41) and estimating an energy-saving benefit brought by replacing the hardware devices (41), the software analyze strategy comprising analyzing using statuses of energy according to history data of the hardware devices (41) in order to provide a software improvement proposal and estimate a cost to the software improvement proposal and an energy-saving benefit brought by the software improvement proposal.

### Claim 5 (depends on 3)

The smart building management system (1) according to claim 3, wherein the building management sub-system (13) further comprises a building configuration sub-system (136), connecting with the planning and optimization sub-system (131), recording and managing an amount and a sort of the hardware devices (41), and an installment position of the hardware devices (41) in the building (2).

### Claim 6 (depends on 5)

The smart building management system (1) according to claim 5, wherein the building management sub-system (13) further comprises a building monitoring sub-system (135), connecting with the planning and optimization sub-system (131) and the building configuration sub-system (136), monitoring operating statuses of the hardware devices (41), and issuing a warning message when abnormal operations are occurred.

### Claim 7 (depends on 6)

The smart building management system (1) according to claim 6, wherein the building monitoring sub-system (135) connects with the maintenance management sub-system (133) and provides the operating statuses of the hardware devices (41) to the maintenance management sub-system (133), the maintenance management sub-system (133) issuing a maintenance message in time when the hardware devices (41) are the in abnormal operations.

### Claim 8 (depends on 3)

The smart building management system (1) according to claim 3, wherein the task execution module (14) comprises:
a data mining module (141), receiving requests of the building management sub-system (13) in order to search and analyze corresponding data in the database (17), and replying an analyzed result to the building management sub-system (13);
an error handling module (142), recording a plurality of processes of a plurality of error statuses, and eliminating errors according to corresponding processes while the hardware devices (41) are in abnormal operations;
an intelligent scheduling and event control module (144), making schedules to the tasks planned by the planning and optimization sub-system (131), executing the plurality of tasks according to the schedules, and replying execution results to the planning and optimization sub-system (131); and
a reporting module (143), receiving the requests of the building management sub-system (13) in order to generate corresponding reports, wherein the reports are displayed by the graphic user interface (11).

### Claim 9 (depends on 3)

The smart building management system (1) according to claim 3, further comprising a field access control agent (18), connecting with the hardware devices (41) and the building equipment control module (15) in order to be an agent interface of the building equipment control module (15) for communicating with the industrial control system (4) that has the hardware devices (41).

### Claim 10 (depends on 9)

The smart building management system (1) according to claim 9, further comprising a smart node device (19), connecting with the building equipment control module (15), the smart node device (19) being in a local area (21) of the building (2), and connecting with an area sensing device (211) and an area application device (212) of the local area (21), the smart node device (19) searching and analyzing environmental statuses of the local area (21) through the area sensing device (211), and controlling the area application device (212) according to an analyzing result.

### Claim 11 (depends on 10)

The smart building management system (1) according to claim 10, wherein the area sensing device (211) comprises at least one of a temperature sensing device (213), a moisture sensing device (214), a heat sensing device, and an infrared ray sensing device, the area application device (212) comprising at least one of a lamp (215), an air conditioner, a fan, an air extractor (216), and a shutter (217).

### Claim 12 (depends on 10)

The smart building management system (1) according to claim 10, wherein there are a plurality of smart node devices (19), each smart node device (19) being in a corresponding local area (21) of the building (2), the smart node devices (19) connecting with each other, each of the smart node devices (19) transmitting the environmental statuses of the corresponding local area (21) and the analyzed result to the building equipment control module (15) or to the other smart node device (19), and the other smart node device (19) transmitting to the building equipment control module (15).

### Claim 13 (depends on 3)

The smart building management system (1) according to claim 3, further comprising an inter-building communication module (16), connecting with the other smart building management system (1), wherein the other smart building management system (1) manages the other building (2).

### Claim 14 (depends on 13)

The smart building management system (1) according to claim 13, wherein the inter-building communication module (16) connects with a multi-building management system (3), the multi-building management system (3) simultaneously managing the smart building management system (1) and the other smart building management system (1), the multi-building management system (3) planning at least one co-management strategy, wherein the planning and optimization sub-system (131) plans the energy-saving strategy based on the co-management strategy.

### Claim 15

A smart building management system (1) for managing a building (2), comprising:
a graphic user interface (11), receiving requests from a user in an authority limit of a user account, and providing functions and data of the authority limit;
an account manager (12), connecting with the graphic user interface (11), managing the user account registered by the user, and setting the authority limit of the user account;
a building equipment control module (15), connecting with a plurality of hardware devices (41) in the building (2) to be a connecting interface among the smart building management system (1) and the plurality of hardware devices (41), wherein each of the plurality of hardware devices (41) being in each of areas of the building (2);
a database (17), connecting with the building equipment control module (15) and the hardware devices (41), storing data and equipment statuses replied by the hardware devices (41);
an energy management sub-system (132), connecting with the database (17), collecting operating timing of the hardware devices (41) of each of the areas in the database (17), and analyzing energy consumption and loading statuses of the hardware devices (41) in order to gather statistics of total energy consumption statuses of the building (2), an analyzing and statistical result being stored in the database (17) and being displayed by the graphic user interface (11);
a maintenance management sub-system (133), connecting with the database (17), collecting down time data, maintenance time, maintenance flow charts of the hardware devices 41, and data and equipment statuses replied by the hardware devices (41) in the database (17) so as to analyze maintenance statuses of the hardware devices (41) and to store an analyzing result in the database (17), an analyzing result of the maintenance management sub-system (133) being displayed by the graphic user interface (11) for maintenance;
a quality of service management sub-system (134), connecting with the database (17), gathering statistics of the requests provided by the user, and analyzing an achieved percentage and quality of a service for the requests, wherein the service is provided by the smart building management system (1), an analyzing result of the quality of service management sub-system (134) being stored in the database (17) and being displayed by the graphic user interface (11);
a building configuration sub-system (136), connecting with the database (17), letting the user record and manage an amount, sorts, installment positions of the hardware devices (41) in the building (2), and then storing in the database (17);
a building monitoring sub-system (135), connecting with the building configuration sub-system (136) and the database (17), monitoring whether the hardware devices (41) are in normal operations, a monitoring result being stored in the database (17), and issuing a warning message when the hardware devices (41) are in abnormal operations;
a planning and optimization sub-system (131), connecting with the energy management sub-system (132), the maintenance management sub-system (133), and the quality of service management sub-system (134), the planning and optimization sub-system (131) executing optimization of the smart building management system (1) according to the requests of the user, the maintenance statuses of the hardware devices (41), and a total energy consumption of the building (2), and planning at least one energy-saving strategy;
wherein the smart building management system (1) manages and adjusts the hardware devices (41) in the building (2) based on the energy-saving strategy in order to let the total energy consumption meet an energy-saving target set by the user.

### Claim 16 (depends on 15)

The smart building management system (1) according to claim 15, further comprising a task execution module (14), connecting with the energy management sub-system (132), the maintenance management sub-system (133), the quality of service management sub-system (134), the planning and optimization sub-system (131), the building monitoring sub-system (135), and the building configuration sub-system (136), the task execution module (14) connecting with the database (17) via the building equipment control module (15) and comprising:
a data mining module (141), receiving requests of the sub-systems in order to search and analyze corresponding data in the database (17), and replying an analyzed result to the sub-systems that provide requests;
an error handling module (142), recording a plurality of processes of a plurality of error statuses, and eliminating errors according to corresponding processes when the hardware devices (41) are in abnormal operations;
an intelligent scheduling and event control module (144), making schedules to a plurality of tasks included in the energy-saving strategy, executing the plurality of tasks according to the schedules, and replying execution results to the planning and optimization sub-system (131); and
a reporting module (143), receiving the requests of the sub-systems in order to generate corresponding reports, wherein the reports are displayed by the graphic user interface (11).

### Claim 17 (depends on 16)

The smart building management system (1) according to claim 16 further comprising a field access control agent (18), connecting with the hardware devices (41) and the building equipment control module (15) in order to represent the building equipment control module (15) and communicate with the hardware devices (41).

### Claim 18 (depends on 16)

The smart building management system (1) according to claim 16, further comprising a smart node device (19), connecting with the building equipment control module (15), the smart node device (19) being in a local area (21) of the building (2), and connecting with an area sensing device (211) and an area application device (212) of the local area (21), the smart node device (19) searching and analyzing environmental statuses of the local area (21) through the area sensing device (211), and controlling the area application device (212) according to an analyzed result.

### Claim 19

A multi-building management system (3), connecting with a plurality of smart building management systems (1) via a network, wherein the smart building management systems (1) manage different buildings (2), the multi-building management system (3) comprising:
a graphic user interface (31), receiving requests from a user in an authority limit of a user account, and providing functions and data of the authority limit;
an account manager (32), connecting with the graphic user interface (31), managing the user account registered by the user, and setting the authority limit of the user account;
a multi-building equipment control module (35), connecting with the plurality of smart building management systems (1), receiving data and equipment statuses replied by a plurality of hardware devices (41) in the buildings (2);
a database (36), connecting with the multi-building equipment control module (35) and the plurality of smart building management systems (1), storing the data and the equipment statuses replied by the hardware devices (41);
an multi-building energy management sub-system (332), connecting with the database (36), collecting operating timing of the hardware devices (41) in the database (36), and analyzing the energy consumption and loading statuses of the hardware devices (41) in order to gather statistics of total energy consumption statuses of the buildings (2), analyzed and statistical results being stored in the database (36) and being displayed by the graphic user interface (31);
a multi-building maintenance management sub-system (333), connecting with the database (36), collecting down time data, maintenance time, maintenance flow charts of the hardware devices 41, and data and equipment statuses replied by the hardware devices (41) in the database (36) so as to analyze maintenance statuses of the hardware devices (41) and to store analyzed results in the database (36), the analyzed results of the multi-building maintenance management sub-system (333) being displayed by the graphic user interface (31) for maintenance;
a multi-building quality of service management sub-system (334), connecting with the database (36), respectively gathering statistics of the requests from the users of the buildings (2), and analyzing a progress and quality of services for the requests, wherein the services are provided by the plural smart building management systems (1), analyzed results of the multi-building quality of service management sub-system (334) being stored in the database (36) and being displayed by the graphic user interface (31);
a multi-building configuration sub-system (336), connecting with the database (36), letting the user record and manage amounts, sorts, installment positions of the hardware devices (41) in the plural buildings (2), and then storing in the database (36);
a multi-building monitoring sub-system (335), connecting with the building configuration sub-system (336) and the database (36), monitoring whether the hardware devices (41) are in normal operations, monitoring results being stored in the database (36), and issuing warning messages when the hardware devices (41) are in abnormal operations; and
a multi-building planning and optimization sub-system (331), connecting with the multi-building energy management sub-system (332), the multi-building maintenance management sub-system (333), and the multi-building quality of service management sub-system (334), the multi-building planning and optimization sub-system (331) planning at least one co-managing strategy according to the requests of the users of the plural smart building management systems (1), the maintenance statuses of the hardware devices (41), and total energy consumptions of the buildings (2), and transmitting to the plural smart building management systems (1);
wherein the plural smart building systems (1) respectively use the co-managing strategy to be as a planning base of an energy-saving strategy.

### Claim 20 (depends on 19)

The smart building management system (1) according to claim 19, further comprising a multi-building task execution module (34), connecting with the multi-building energy management sub-system (332), the multi-building maintenance management sub-system (333), the multi-building quality of service management sub-system (334), the multi-building planning and optimization sub-system (331), the multi-building building monitoring sub-system (335), and the multi-building building configuration sub-system (336), the multi-building task execution module (34) connecting with the database (36) via the multi-building equipment control module (35) and comprising:
a multi-building data mining module (341), receiving requests of the sub-systems in order to search and analyze corresponding data in the database (36), and replying analyzed results to the sub-systems that provide requests;
a multi-building error handling module (342), recording a plurality of processes of a plurality of error statuses, informing the multi-building monitoring sub-system (335) and eliminating errors according to corresponding processes when the hardware devices (41) in the plural buildings (2) are in the abnormal operations;
a multi-building intelligent scheduling and event control module (344), making schedules to a plurality of tasks included in the co-managing strategy, executing the plurality of tasks according to the schedules, and replying execution results to the planning and optimization sub-system (331); and
a multi-building reporting module (343), receiving the requests of the sub-systems in order to generate corresponding reports, wherein the reports are displayed by the graphic user interface (31).
