# US 2015/0086278 A1 · Systems and methods to reinforce excavation walls

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0086278 A1
- Document ID: US20150086278A1
- Status: Published application
- Kind: A1
- Application number: 14/495,600
- Filed: 2014-09-24
- Published: 2015-03-26
- Earliest claimed: 2013-09-25
- Assignees: Post Tensioning Solutions LLC
- Applicants: Post Tensioning Solutions LLC
- Inventors: Joseph Marino Lucia; Rick Allen Thompson
- Web page: https://patentgrep.com/patent/US20150086278A1

## CPC

- E02D 17/207: {with means incorporating sheet piles or piles}
- E02D 5/18: Bulkheads or similar walls made solely of concrete in situ {(moulds therefor E02D5/68; making foundation slots E02D17/13; sealing diaphragms other than those made of concrete E02D19/18)}
- E02D 17/04: Bordering {surfacing} or stiffening the sides of foundation pits
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

A soldier pile wall for shoring an excavation site includes a plurality of drilled shafts drilled along an edge of the excavation site, a plurality of soldier piles, each of the plurality of soldier piles being positioned within a respective drilled shaft, and a pre-stressing system coupled to at least some of the plurality of soldier piles. The pre-stressing system is configured to induce stresses to counteract working stresses of the soldier pile wall. Related methods are also provided.

## Claims

### Claim 1

A soldier pile wall for shoring an excavation site, the soldier pile wall comprising:
a plurality of drilled shafts drilled along an edge of the excavation site;
a plurality of soldier piles, each of the plurality of soldier piles being positioned within a respective drilled shaft; and
a pre-stressing system coupled to at least some of the plurality of soldier piles, the pre-stressing system configured to induce stresses to counteract working stresses of the soldier pile wall.

### Claim 2 (depends on 1)

The soldier pile wall of claim 1 wherein the pre-stressing system includes a post-tensioning strand.

### Claim 3 (depends on 3)

The soldier pile wall of claim 3 wherein the pre-stressing system further comprises:
a protective cover having grout therein, the grout surrounding the post-tensioning strand.

### Claim 4 (depends on 1)

The soldier pile wall of claim 1 wherein each of the plurality of drilled shafts includes cementitious material surrounding the soldier pile.

### Claim 5 (depends on 1)

The soldier pile wall of claim 1, further comprising:
a plurality of laggings extending laterally between the plurality of soldier piles, each lagging being coupleable to a front side flange of each of adjacent soldier piles.

### Claim 6 (depends on 1)

The soldier pile wall of claim 1, further comprising:
a plurality of laggings extending laterally between the plurality of soldier piles, the plurality of laggings comprising concrete of a secant pile.

### Claim 7 (depends on 2)

The soldier pile wall of claim 2, further comprising:
a compressive flange coupled to the soldier pile, the compressive flange including an aperture to allow a corresponding post-tensioning strand to pass therethrough.

### Claim 8

A system for shoring an excavation site having a plurality of adjacent holes drilled along an edge of the excavation site where a soldier pile wall is to be erected, the system comprising:
a plurality of modular soldier piles, each of the plurality of modular soldier piles to be positioned within a respective hole and including a pre-stressing system coupled thereto, the pre-stressing system having:
a post-tensioning strand enclosed in a protective cover, the protective cover having grout therein to surround and enclose the post-tensioning strand;
an anchorage system positioned at each end of the post-tensioning strand and coupled to a respective end of the post-tensioning strand; and
a compressive flange brace having an aperture to allow the post-tensioning strand to pass therethrough, the compressive flange brace preventing bending of the modular soldier pile during a pre-stressing operation.

### Claim 9

A method to make a soldier pile wall for an excavation site, the method comprising:
drilling a row of holes along an edge of the excavation site to form a corresponding drilled shaft;
coupling a pre-stressing system to at least some of a plurality of soldier piles;
placing each of the plurality of soldier piles within a respective drilled shaft;
pouring cementitious material to fill the drilled shaft;
excavating the excavation site; and
inserting lagging laterally and between adjacent soldier piles.

### Claim 10 (depends on 9)

The method of claim 9 wherein the pre-stressing system includes a post-tensioning strand enclosed and surrounded by a protective cover having grout.

### Claim 11 (depends on 9)

The method of claim 9, further comprising:
coupling a compressive flange brace to the soldier pile having the pre-stressing system coupled thereto.

### Claim 12 (depends on 9)

The method of claim 9, further comprising:
tensioning the soldier pile having the pre-stressing system coupled thereto, wherein the tensioning step comprises:
fixedly holding a first end of the pre-stressing system;
releasably coupling a second end of the pre-stressing system to a hydraulic jack; and
applying a pre-set tension to the pre-stressing system.

### Claim 13 (depends on 12)

The method of claim 12 wherein the soldier pile is tensioned after being placed within the drilled shaft.

### Claim 14 (depends on 9)

The method of claim 9 wherein the coupling step comprises:
coupling an anchorage system at each end of the pre-stressing system; and
coupling a plurality of post-tensioning strands to the anchorage system.