# US 2015/0085718 A1 · Simplified fdd-tdd carrier aggregation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0085718 A1
- Document ID: US20150085718A1
- Status: Published application
- Kind: A1
- Application number: 14/495,619
- Filed: 2014-09-24
- Published: 2015-03-26
- Earliest claimed: 2013-09-26
- Assignees: QUALCOMM Incorporated
- Applicants: QUALCOMM Incorporated
- Inventors: Wanshi Chen; Peter Gaal; Jelena Damnjanovic
- Web page: https://patentgrep.com/patent/US20150085718A1

## CPC

- H04L 5/0053: {Allocation of signalling, i.e. of overhead other than pilot signals}
- H04B 7/2656: {for structure of frame, burst}
- H04L 1/1812: Hybrid protocols; Hybrid automatic repeat request [HARQ]
- H04L 5/14: Two-way operation using the same type of signal, i.e. duplex
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04B: TRANSMISSION

## Abstract

Methods, systems, and devices are described for multi-carrier communications involving one or more TDD component carriers and one or more FDD component carriers in a wireless communications network. Some described embodiments are directed to systems and methods for multi-carrier communications for a half-duplex device. The described methods, systems, and devices may simplify multi-carrier communications, such as the determination of hybrid automatic repeat request (HARQ) and/or scheduling timing with FDD+TDD carrier aggregation.

## Claims

### Claim 1

A method of multi-carrier communication for a device utilizing at least one time division duplex (TDD) component carrier and at least one frequency division duplex (FDD) component carrier in a wireless communications network, the method comprising:
determining a first reference subframe configuration for a downlink of the at least one FDD component carrier;
determining a second reference subframe configuration for an uplink of the at least one FDD component carrier; and
communicating on the at least one FDD component carrier according to the determined first and second reference subframe configurations in respective downlink and uplink directions, wherein communicating on the at least one FDD component carrier comprises determining at least one of a hybrid automatic repeat-request (HARQ) timing or a scheduling timing based on the first reference subframe configuration or the second reference subframe configuration.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining the at least one TDD component carrier as a primary component carrier and the at least one FDD component carrier as a secondary component carrier.

### Claim 3 (depends on 1)

The method of claim 1, wherein determining the second reference subframe configuration for the uplink of the at least one FDD component carrier comprises:
determining the second reference subframe configuration to be the same as the first reference subframe configuration.

### Claim 4 (depends on 3)

The method of claim 3, wherein determining the first reference subframe configuration comprises:
determining a subframe configuration of the at least one TDD component carrier; and
determining the first reference subframe configuration to be the same as the subframe configuration determined for the at least one TDD component carrier.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining the second reference subframe configuration for the uplink of the at least one FDD component carrier comprises:
determining a reference subframe configuration different from the determined first reference subframe configuration.

### Claim 6 (depends on 1)

The method of claim 1, wherein at least one of the first and second reference subframe configurations is determined based on whether self-carrier scheduling or cross-carrier scheduling is used to schedule communications on the at least one FDD component carrier.

### Claim 7 (depends on 1)

The method of claim 1, wherein the at least one FDD component carrier comprises at least two FDD component carriers, and wherein:
determining the first reference subframe configuration for the downlink of the at least one FDD component carrier comprises determining the first reference subframe configuration for the downlink of the at least two FDD component carriers; and
determining the second reference subframe configuration for the uplink of the at least one FDD component carrier comprises determining the second reference subframe configuration for the uplink of the at least two FDD component carriers.

### Claim 8 (depends on 4)

The method of claim 4, wherein at least one of the determining of the first reference subframe configuration and the determining of the second reference subframe configuration is based at least in part on a subframe configuration determined for the at least one TDD component carrier.

### Claim 9 (depends on 1)

The method of claim 1, wherein at least one of the determining of the first reference subframe configuration and the determining of the second reference subframe configuration is based at least in part on a duplex capability of the device.

### Claim 10 (depends on 1)

The method of claim 1, further comprising:
identifying at least one special subframe in the first reference subframe configuration; and
treating the at least one identified special subframe as a regular downlink subframe.

### Claim 11 (depends on 1)

The method of claim 1, further comprising:
identifying at least one downlink subframe in the at least one FDD component carrier that is not part of the first reference subframe configuration; and
using the at least one identified downlink subframe for scheduling via one of self-carrier scheduling from an FDD component carrier or cross-carrier scheduling from a TDD component carrier.

### Claim 12 (depends on 11)

The method of claim 11, further comprising:
providing acknowledgement/negative acknowledgement (ACK/NAK) feedback for the at least one identified downlink subframe.

### Claim 13 (depends on 12)

The method of claim 12, wherein the ACK/NAK feedback for the at least one identified downlink subframe is provided in a same uplink subframe with the ACK/NAK feedback for at least one downlink subframe part of the first reference subframe configuration.

### Claim 14 (depends on 1)

The method of claim 1, wherein:
determining the first reference subframe configuration is based at least part on one or more received signals.

### Claim 15 (depends on 9)

The method of claim 9, wherein the device comprises a half-duplex device for multi-carrier communications.

### Claim 16 (depends on 1)

The method of claim 1, wherein determining at least one of the first reference subframe configuration or the second reference subframe configuration is based at least in part on a subframe configuration of the at least one TDD component carrier.

### Claim 17

An apparatus for multi-carrier communication for a device utilizing at least one time division duplex (TDD) component carrier and at least one frequency division duplex (FDD) component carrier in a wireless communications network, the apparatus comprising:
means for determining a first reference subframe configuration for a downlink of the at least one FDD component carrier;
means for determining a second reference subframe configuration for an uplink of the at least one FDD component carrier; and
means for communicating on the at least one FDD component carrier according to the determined first and second reference subframe configurations in respective downlink and uplink directions, wherein communicating on the at least one FDD component carrier comprises determining at least one of a hybrid automatic repeat-request (HARQ) timing or a scheduling timing based on the first reference subframe configuration or the second reference subframe configuration.

### Claim 18 (depends on 17)

The apparatus of claim 17, further comprising:
means for determining the at least one TDD component carrier as a primary component carrier and the at least one FDD component carrier as a secondary component carrier.

### Claim 19 (depends on 17)

The apparatus of claim 17, wherein the means for determining the second reference subframe configuration for the uplink of the at least one FDD component carrier determines the second reference subframe configuration to be the same as the first reference subframe configuration.

### Claim 20 (depends on 19)

The apparatus of claim 19, wherein the means for determining the first reference subframe configuration determines a subframe configuration of the at least one TDD component carrier, and determines the first reference subframe configuration to be the same as the subframe configuration determined for the at least one TDD component carrier.

### Claim 21 (depends on 17)

The apparatus of claim 17, wherein the means for determining the second reference subframe configuration for the uplink of the at least one FDD component carrier determines a reference subframe configuration that is different from the first reference subframe configuration.

### Claim 22 (depends on 17)

The apparatus of claim 17, wherein at least one of the first and second reference subframe configurations is determined based on whether self-carrier scheduling or cross-carrier scheduling is used to schedule communications on the at least one FDD component carrier.

### Claim 23

An apparatus for multi-carrier communication for a device utilizing at least one time division duplex (TDD) component carrier and at least one frequency division duplex (FDD) component carrier in a wireless communications network, the apparatus comprising:
a processor; and
a memory coupled to the processor, wherein the processor is configured to:
determine a first reference subframe configuration for a downlink of the at least one FDD component carrier,
determine a second reference subframe configuration for an uplink of the at least one FDD component carrier, and
communicate on the at least one FDD component carrier according to the determined first and second reference subframe configurations in respective downlink and uplink directions, wherein communicating on the at least one FDD component carrier comprises determining at least one of a hybrid automatic repeat-request (HARQ) timing or a scheduling timing based on the first reference subframe configuration or the second reference subframe configuration.

### Claim 24 (depends on 23)

The apparatus of claim 23, wherein the processor is further configured to:
determine the at least one TDD component carrier as a primary component carrier and the at least one FDD component carrier as a secondary component carrier.

### Claim 25 (depends on 23)

The apparatus of claim 23, wherein the processor is further configured to:
determine the second reference subframe configuration to be the same as the first reference subframe configuration.

### Claim 26 (depends on 23)

The apparatus of claim 23, wherein at least one of the first and second reference subframe configurations is determined based on whether self-carrier scheduling or cross-carrier scheduling is used to schedule communications on the at least one FDD component carrier.

### Claim 27

A non-transitory computer-readable medium for storing instructions executable by a processor, comprising:
instructions to determine a first reference subframe configuration for a downlink of at least one FDD component carrier;
instructions to determine a second reference subframe configuration for an uplink of the at least one FDD component carrier; and
instructions to communicate on the at least one FDD component carrier according to the determined first and second reference subframe configurations in respective downlink and uplink directions, wherein communicating on the at least one FDD component carrier comprises determining at least one of a hybrid automatic repeat-request (HARQ) timing or a scheduling timing based on the first reference subframe configuration or the second reference subframe configuration.

### Claim 28 (depends on 27)

The non-transitory computer-readable medium of claim 27, further comprising:
instructions to determine at least one TDD component carrier as a primary component carrier and the at least one FDD component carrier as a secondary component carrier.

### Claim 29 (depends on 27)

The non-transitory computer-readable medium of claim 27, wherein the instructions to determine the second reference subframe configuration for the uplink of the at least one FDD component carrier comprise instructions to:
determine the second reference subframe configuration to be the same as the first reference subframe configuration.

### Claim 30 (depends on 27)

The non-transitory computer-readable medium of claim 27, wherein at least one of the first and second reference subframe configurations is determined based on whether self-carrier scheduling or cross-carrier scheduling is used to schedule communications on the at least one FDD component carrier.
