# US 2015/0083400 A1 · System and method for changing proppant concentration

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0083400 A1
- Document ID: US20150083400A1
- Status: Published application
- Kind: A1
- Application number: 14/366,140
- Filed: 2013-08-15
- Published: 2015-03-26
- Earliest claimed: 2013-08-15
- Assignees: Halliburton Energy Services, Inc.
- Applicants: Halliburton Energy Services, Inc.
- Inventors: Stanley V. Stephenson; Wesley J. Warren
- Web page: https://patentgrep.com/patent/US20150083400A1

## CPC

- F04B 49/22: by means of valves (F04B49/03 takes precedence)
- E21B 43/2607: {Surface equipment specially adapted for fracturing operations}
- E21B 43/267: reinforcing fractures by propping
- F04B 23/06: the pumps being all of reciprocating positive-displacement type
- F04B 49/00: Control {, e.g. of pump delivery, or pump pressure} of, or safety measures for, machines, pumps, or pumping installations, not otherwise provided for, or of interest apart from, groups F04B1/00 - F04B47/00
- F04B 53/162: {Adaptations of cylinders}
- F04B: POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS (machines for liquids, or pumps, of rotary-piston or oscillating-piston type F04C; non-positive-displacement pumps F04D; pumping of fluid by direct contact of another fluid or by using inertia of fluid to be pumped F04F)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Disclosed are systems and methods utilizing multiple parallel pumps to deliver a mixture of the proppant and clean fluid via a manifold trailer. One method of providing a step-change in proppant concentration includes selecting a first flow rate for a first pump connected between a first input node and first output node, calculating a first transit time for a flow of a fluid at the first flow rate through a first flow path extending from the first inlet node, through the first pump, and to the first outlet node, and calculating a second flow rate for a second pump connected between the first input node and the first output node such that a second transit time for a flow of the fluid through a second flow path extending from the first inlet node, through the second pump, and to the first outlet node is equal to the first transit time.

## Claims

### Claim 1

A method of providing a step-change in proppant concentration, the method comprising:
selecting a first flow rate for a first pump connected between a first input node and first output node;
calculating a first transit time for a flow of a fluid at the first flow rate through a first flow path extending from the first inlet node, through the first pump, and to the first outlet node; and
calculating a second flow rate for a second pump connected between the first input node and the first output node such that a second transit time for a flow of the fluid through a second flow path extending from the first inlet node, through the second pump, and to the first outlet node is equal to the first transit time.

### Claim 2 (depends on 1)

The method of claim 1, further comprising simultaneously operating the first and second pumps respectively at the first and second flow rates.

### Claim 3 (depends on 1)

The method of claim 1, wherein calculating the first transit time comprises calculating a first fluid volume within the first flow path and dividing the first fluid volume by the first flow rate.

### Claim 4 (depends on 1)

The method of claim 1, wherein calculating the second flow rate comprises calculating a second fluid volume within the second flow path and dividing the second fluid volume by the first transit time.

### Claim 5 (depends on 1)

The method of claim 1, wherein the second flow path does not pass through any portion of the first flow path.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
determining a calculated total flow rate by summing at least the first and second flow rates;
determining a ratio of a desired total flow rate to the calculated total flow rate; and
calculating first and second adjusted flow rates by respectively multiplying the first and second flow rates by the ratio.

### Claim 7 (depends on 6)

The method of claim 6, further comprising simultaneously operating the first and second pumps respectively at the first and second adjusted flow rates.

### Claim 8 (depends on 7)

The method of claim 7, further comprising pumping the fluid into a wellbore using the first and second pumps, wherein the fluid comprises a fracturing fluid.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
calculating a third transit time for a flow of the fluid at the first flow rate through a third flow path extending from a second inlet node, through the first inlet node, through the first pump, through the first outlet node, and to a second outlet node; and
calculating a third flow rate for a third pump connected between the second inlet node and the second outlet node such that a fourth transit time for a flow of fluid through a fourth flow path extending from the second inlet node, through the third pump, and to the second outlet node is equal to the first transit time.

### Claim 10 (depends on 9)

The method of claim 9, wherein the fourth flow path does not pass through any portion of the first, second, or third flow paths.

### Claim 11 (depends on 9)

The method of claim 9, further comprising simultaneously operating the first, second, and third pumps, respectively, at the first, second, and third flow rates.

### Claim 12 (depends on 11)

The method of claim 11, further comprising pumping the fluid into a wellbore using the first, second, and third pumps, wherein the fluid comprises a fracturing fluid.

### Claim 13 (depends on 9)

The method of claim 9, further comprising:
calculating a fifth transit time for a flow of the fluid at the first flow rate through a fifth flow path extending from a third inlet node, through the second inlet node, through the first inlet node, through the first pump, through the first outlet node, through the second outlet node, and to a third outlet node; and
calculating a fourth flow rate for a fourth pump connected between the third inlet node and the third outlet node such that a sixth transit time for a flow of fluid through a sixth flow path extending from the third inlet node, through the fourth pump, and to the third outlet node is equal to the fifth transit time.

### Claim 14 (depends on 13)

The method of claim 13, wherein the sixth flow path does not pass through any portion of the first, second, third, fourth, or fifth flow paths.

### Claim 15 (depends on 13)

The method of claim 13, further comprising simultaneously operating the first, second, third, and fourth pumps, respectively, at the first, second, third, and fourth flow rates.

### Claim 16 (depends on 15)

The method of claim 15, further comprising pumping the fluid into a wellbore using the first, second, third, and fourth pumps, wherein the fluid comprises a fracturing fluid.

### Claim 17

A multi-pump manifold, comprising:
a first pump fluidly coupled between a first inlet node and a first outlet node;
a first flow path extending from the first inlet node, through the first pump, and to the first outlet node;
a second pump fluidly coupled between the first inlet node and the first outlet node;
a second flow path extending from the first inlet node, through the second pump, and to the first outlet node that does not pass through any portion of the first flow path;
a third pump fluidly coupled between a second inlet node and a second outlet node;
a third flow path extending from the second inlet node, through the first inlet node, through the first pump, through the first outlet node, and to the second outlet node; and
a fourth flow path extending from the second inlet node, through the third pump, and to the second outlet node that does not pass through any portion of the first, second, or third flow paths.

### Claim 18 (depends on 17)

The multi-pump manifold of claim 17, further comprising:
a manifold inlet having a flow path to the second inlet node that does not pass through any portion of the first, second, or third flow paths; and
a manifold outlet having a flow path from the second outlet node that does not pass through any portion of the first, second, or third flow paths.

### Claim 19 (depends on 17)

The multi-pump manifold of claim 17, further comprising:
a source of a clean fluid;
a source of a proppant slurry; and
a blender fluidly coupled to the source of the clean fluid, the source of the proppant slurry, and the manifold inlet, the blender being configured to accept selected amounts of at least one of the clean fluid and the proppant slurry, mix the clean fluid and the proppant slurry to a generally uniform mixture, and deliver the mixture to the manifold inlet.

### Claim 20 (depends on 17)

The multi-pump manifold of claim 17, further comprising:
a controller coupled to the first, second, and third pumps, the controller being configured to:
accept a first nominal flow rate, a second nominal flow rate, and a third nominal flow rate;
simultaneously operate the first pump at the first nominal flow rate, the second pump at the second nominal flow rate, and the third pump at the third nominal flow rate;
accept a desired total flow rate;
calculate a first adjusted flow rate, a second adjusted flow rate, and a third adjusted flow rate by respectively multiplying the first, second, and third nominal flow rates by a ratio of the desired total rate over a sum of at least the first, second, and third nominal flow rates; and
simultaneously operate the first pump at the first adjusted flow rate, the second pump at the second adjusted flow rate, and the third pump at the third adjusted flow rate.
