# US 2015/0073570 A1 · Method and System for Controller Transition

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0073570 A1
- Document ID: US20150073570A1
- Status: Published application
- Kind: A1
- Application number: 14/385,459
- Filed: 2013-01-28
- Published: 2015-03-12
- Earliest claimed: 2012-03-16
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Aktiengesellschaft
- Inventors: Dagoberto Gonzalez-Mendoza; Arnt Olav Sveen
- Web page: https://patentgrep.com/patent/US20150073570A1

## CPC

- G05B 9/03: with multiple-channel loop, i.e. redundant control systems
- G05B 19/0428: {Safety, monitoring (G05B19/0423 takes precedence)}
- G05B 19/054: {Input/output}
- G05B 2219/14014: Redundant processors and I-O
- G05B 2219/25471: Replace existing control system with new different system in real time
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

It is described a method for transition of control from a first controller (101) to a second controller (103), the method comprising: communicatively coupling (143, 145) the first controller and the second controller, such that at least one static digital input signal (110) received by one controller (101) is mutually provided to the respective other controller (103) and such that at least one static digital output signal (118) generated by one controller (101) is mutually provided to the respective other controller (103); disconnecting at least one output line (124) from the first controller (101); connecting the at least one output line (126) to the second controller (103); supplying at least one output signal (147) to the at least one output line (126), wherein the at least one output signal (147) is obtained by performing a logical OR, in particular using an OR-gate, to at least one first output signal (118) generated by the first controller (101) and at least one second output signal (136) generated by the second controller (103), the method further comprising before disconnecting at least one output line (124) from the first controller (101): supplying a logical high signal to the output line by an external voltage source, if the first output signal (118) is a logical high signal or if the output line is at a logical high state during normal operation.

## Claims

### Claim 1

Method for transition of control from a first controller (101) to a second controller (103), the method comprising:
communicatively coupling (143, 145) the first controller and the second controller,
such that at least one static digital input signal (110) received by one controller (101) is mutually provided to the respective other controller (103) and
such that at least one static digital output signal (118) generated by one controller (101) is mutually provided to the respective other controller (103);
disconnecting at least one output line (124) from the first controller (101);
connecting the at least one output line (126) to the second controller (103);
supplying at least one output signal (147) to the at least one output line (126),
wherein the at least one output signal (147) is obtained by performing a logical OR, in particular using an OR-gate, to at least one first output signal (118) generated by the first controller (101) and at least one second output signal (136) generated by the second controller (103),
the method further comprising before disconnecting at least one output line (124) from the first controller (101):
supplying a logical high signal to the output line by an external voltage source, if the first output signal (118) is a logical high signal or if the output line is at a logical high state during normal operation.

### Claim 2 (depends on 1)

Method according to claim 1, further comprising, in particular before the disconnecting the at least one output line from the first controller:
blocking (119) output of the first output signal (118) and/or
blocking (137) output of the second output signal (136).

### Claim 3 (depends on 1, 2)

Method according to one of claims 1 to 2, further comprising, after the connecting the at least one output line (126) to the second controller:
removing blocking the output of the second output signal and/or
removing blocking the output of the first output signal.

### Claim 4

Method according to one of the preceding claims, wherein the connecting the at least one output line (126) to the second controller (103) comprises connecting the at least one output line (126) to at least one second output terminal (141) of the second controller, the method further comprising:
monitoring whether the connection of the at least one output line (126) to at least one second output terminal (141) of the second controller (103) is correct.

### Claim 5

Method according to one of the preceding claims, wherein connections of all output lines (124) of the at least one output line are switched one by one from the first controller (101) to the second controller (103).

### Claim 6

Method according to one of the preceding claims, further comprising:
disconnecting at least one input line (106) from the first controller (101);
connecting the at least one input line (108) to the second controller (103);
supplying the at least one input signal (110) carried by the at least one input line (108) to the first controller (101).

### Claim 7

Method according to the preceding claim, further comprising, in particular before the disconnecting the at least one input line from the first controller:
blocking the input signal (110) at the first controller (101); and/or
blocking the input signal (110) at the second controller (103).

### Claim 8

Method according to the preceding claim, further comprising, in particular after the connecting the at least one input line (108) to the second controller:
removing the blocking the input signal (110) at the first controller (101); and/or
removing the blocking the input signal (110) at the second controller (103).

### Claim 9 (depends on 6, 7, 8)

Method according to claims 6 to 8, wherein the connecting the at least one input line (108) to the second controller (103) comprises connecting the at least one input line (108) to at least one second input terminal (125) of the second controller (103), the method further comprising:
monitoring whether the connection of the at least one input line (108) to at least one second input terminal (125) of the second controller (103) is correct.

### Claim 10

System (100) for transition of control between two controllers, the system comprising:
a first controller (101) having:
at least one first input terminal (107),
at least one first internal input port (109),
at least one first input OR-gate (111) between the first input terminal and the first internal input port,
at least one first output terminal (123),
at least one first internal output port (117),
at least one first output OR-gate (121) between the first internal output port and the first output terminal;
a second controller (103) having:
at least one second input terminal (125),
at least one second internal input port (131),
at least one second input OR-gate (129) between the second input terminal and the second internal input port,
at least one second output terminal (141),
at least one second internal output port (135),
at least one second output OR-gate (139) between the second internal output port and the second output terminal; and
a communication system (143, 145) for communicatively coupling the first controller (101) and the second controller (103),
such that an input signal (110) received at the second input terminal (125) of the second controller (103) is supplied to the first input OR-gate (111),
such that an second output signal (136) generated at the second internal output port (135) of the second controller (103) is supplied to the first output OR-gate (121),
such that an input signal (110) received at the first input terminal (107) of the first controller (101) is supplied to the second input OR-gate (129),
such that a first output signal (118) generated at the first internal output port (117) of the first controller (101) is supplied to the second output OR-gate (139).

### Claim 11 (depends on 10)

System according to claim 10, further comprising:
at least one first controllable input block (115) arranged between the first input terminal (107) and the first input OR-gate (111) for blocking an input signal (110) received at the first input terminal (107);
at least one first controllable output block (119) arranged between the first internal output port (117) and the first output OR-gate (121) for blocking an output signal (118) generated at the first internal output port (117);
at least one second controllable input block (127) arranged between the second input terminal (125) and the second input OR-gate (129) for blocking an input signal (110) received at the second input terminal (125);
at least one second controllable output block (137) arranged between the second internal output port (135) and the second output OR-gate (139) for blocking an output signal (136) generated at the second internal output port (135).

### Claim 12 (depends on 10, 11)

System according to one of claims 10 to 11, wherein the communication system is implemented in software loaded into the first controller and the second controller.

### Claim 13 (depends on 10, 11, 12)

System according to one of claims 10 to 12, which is adapted as a protection system for controlling actuators for operation of a gas and/or fire emergency equipment.
