Tower base assembly for a wind turbine
AssigneeGeneral Electric Company
InventorsColwyn Mark Sayers, William Francis Gevers
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Company
InventorsColwyn Mark Sayers, William Francis Gevers
Estimating the term…
A pre-assembled tower base assembly for a wind turbine configured for transportation to a wind turbine site is disclosed. The tower base assembly includes a tubular side wall defining an internal volume, a first flange portion at a first end of the tubular side wall, a second flange portion at a second end opposite the first end, and a down-tower electrical assembly installed within the internal volume of the tubular side wall. The first flange portion is configured to couple to a foundation. The second flange portion is configured to couple to a tower section. Further, the first and second flanges define a maximum longitudinal extension therebetween. The maximum longitudinal extension is a maximum height permitted for rail or truck transport. As such, the tower base assembly is configured for transportation in an upright position to a wind turbine site with the down-tower electrical assembly pre-assembled within the internal volume.
A pre-assembled tower base assembly for a wind turbine configured for transportation to a wind turbine site in an upright position, the tower base assembly comprising:
(canceled)
(canceled)
A pre-assembled tower base assembly for a wind turbine configured for transportation to a wind turbine site in an upright position, the tower base assembly comprising:
A method for transporting a pre-assembled tower base assembly of a wind turbine, the method comprising:
Dependencies are inferred from the claim text.