# US 2015/0010365 A1 · Method of installing a foundation in the sea bed and such foundation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2015/0010365 A1
- Document ID: US20150010365A1
- Status: Published application
- Kind: A1
- Application number: 14/376,164
- Filed: 2013-02-08
- Published: 2015-01-08
- Earliest claimed: 2012-02-10
- Assignees: Universal Foundation A/S
- Applicants: Universal Foundation A/S
- Inventors: Soren Andreas Nielsen; Lars Bo Ibsen
- Web page: https://patentgrep.com/patent/US20150010365A1

## CPC

- E02D 27/525: {using elements penetrating the underwater ground (sinking work pieces E02D15/08, sinking caissons E02D23/02)}
- B63B 21/27: by suction
- E02D 23/00: Caissons; Construction or placing of caissons (tunnels submerged into or built in open water E02D29/063 {; moles, piers, quays, breakwaters incorporating caissons E02B3/06; foundation formed by caissons E02D27/18 - E02D27/22; caisson-like artificial islands E02B17/00})
- E02D 27/10: Deep foundations
- E02D 27/22: Caisson foundations made by starting from fixed or floating artificial islands by using protective bulkheads
- E02D 27/32: Foundations for special purposes {(for paving of roads E01C3/00)}
- E02D 27/42: Foundations for poles, masts or chimneys {(sockets or holders for poles or masts per se E04H12/22)}
- E02D 27/50: Anchored foundations
- E02D 29/06: {Constructions, or methods of constructing, in water (E02D15/00 takes precedence; submerged foundations E02D27/52)}
- F03D 13/22: {Foundations specially adapted for wind motors}
- B63B 2021/267: {by penetration of anchor into the sea bed using water jets, e.g. by ground or sand fluidisation}
- E02B 2017/0078: {Suction piles, suction cans}
- F05B 2240/95: offshore
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/727: Offshore wind turbines
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- F03D: WIND MOTORS
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The invention relates to a seabed foundation (1) for an offshore facility, comprising a primary pressure chamber (7) connected to a primary pump (8) and one or more secondary pressure chambers (9) connected to one or more secondary pumps (10). According to an embodiment of the invention, said primary pump is a suction pump and said secondary pump is a pressure pump. The invention further relates to a method (12) of installing said foundation on the seabed (19), which comprises the steps of activating (14) said primary pump to create negative pressure in the primary pressure chamber (7), so that the foundation sinks into the seabed, and activating (15) said one or more secondary pumps (10) to create positive pressures in the secondary pressure chambers (9), so as to control the alignment of the foundation with respect to a substantially horizontal axis (16) during the sinking into the seabed.

## Claims

### Claim 1

A sea bed foundation for an offshore facility, said sea bed foundation having a circumferential side wall substantially defining a cylinder, which cylinder is closed in one end and provided with an opening in the opposite end, thereby defining a primary chamber, said sea bed foundation is hollow, downwardly open and where said side wall defines a skirt, said primary chamber being connected to a primary pump, and wherein said sea bed foundation further comprises one or more secondary chambers connected to one or more secondary pumps wherein said primary pump is a suction pump and said secondary pump is a pressure pump.

### Claim 2 (depends on 1)

The sea bed foundation according to claim 1, wherein said one or more secondary chambers are externally attached to the skirt.

### Claim 3 (depends on 1)

The sea bed foundation according to claim 1, wherein said one or more secondary chambers are integrated in the skirt.

### Claim 4 (depends on 1)

The sea bed foundation according to claim 1, wherein said skirt is formed by a number of substantially curved interconnected profiles, said number of substantially curved interconnected profiles being provided with one or more secondary chambers.

### Claim 5 (depends on 1)

A method for establishing a sea bed foundation for an offshore facility 4, providing a seabed foundation comprising a circumferential side wall substantially defining a cylinder, which cylinder is closed in one end and provided with an opening in the opposite end, thereby defining a primary chamber, said sea bed foundation is hollow, downwardly open and where said side wall defines a skirt, said primary chamber being connected to a primary pump, and wherein said sea bed foundation further comprises one or more secondary chambers connected to one or more secondary pumps wherein said primary pump is a suction pump and said secondary pump is a pressure pump,
positioning the sea bed foundation according to claim 1 on the sea-bed;
activating said primary pump to create negative pressure in the primary chamber, so that the foundation sinks into the sea bed;
activating said one or more secondary pumps to create positive pressures in the secondary chambers, so as to control the alignment of the foundation with respect to a substantially vertical axis during the sinking into the sea bed; and
deactivating said primary pump and said secondary pumps when the foundation has reached a desired level in the sea bed.

### Claim 6 (depends on 5)

They method according to claim 5, wherein said positive pressures are applied in the one or more secondary chambers individually by the one or more secondary pumps.

### Claim 7 (depends on 5)

The method, according to claim 5, wherein said one or more secondary chambers are externally attached to the skirt.

### Claim 8 (depends on 5)

The method, according to claim 5, wherein said one or more secondary chambers are integrated in the skirt.

### Claim 9 (depends on 5)

The method, according to claim 5, wherein said skirt is formed by a number of substantially curved interconnected profiles being provided with one or more secondary chambers.
