# US 2014/0352978 A1 · Device for a Pipe Handling Unit and Method of Inserting and Withdrawing a Pipe String in/from a Borehole

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2014/0352978 A1
- Document ID: US20140352978A1
- Status: Published application
- Kind: A1
- Application number: 14/354,470
- Filed: 2013-02-20
- Published: 2014-12-04
- Earliest claimed: 2012-02-22
- Assignees: West Drilling Products AS
- Applicants: West Drilling Products AS
- Inventors: Bjorn Eilertsen; Odd B. Skjaerseth
- Web page: https://patentgrep.com/patent/US20140352978A1

## CPC

- E21B 19/16: Connecting or disconnecting pipe couplings or joints (E21B19/20 takes precedence)
- E21B 3/022: {Top drives}
- E21B 3/06: Adaptation of rotary draw works to drive rotary tables
- E21B 19/06: Elevators, i.e. rod- or tube-gripping devices
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A pipe-handling system includes at least two pipe-handling units arranged in a vertically displaceable manner along respective guide tracks of, respectively, first and second portions of a tower. The pipe-handling unit is provided with lower and upper rotary units spaced apart vertically on a chassis. Each of the rotary units is provided with a rotatable tong and a hanging-off device. A method is for inserting and withdrawing a pipe string in/from a borehole by the use of the pipe-handling system.

## Claims

### Claim 1

A pipe-handling system, comprising at least two pipe-handling units arranged in a vertically displaceable manner along respective guide tracks of, respectively, first and second tower columns arranged in a tower, wherein the pipe-handling units are provided with lower and upper rotary units spaced apart vertically on a chassis, and wherein each of the rotary units is provided with a rotatable tong and a hanging-off device.

### Claim 2 (depends on 1)

The pipe-handling system in accordance with claim 1, wherein one of the lower and upper rotary units is arranged in a vertically displaceable manner along a portion of the chassis.

### Claim 3 (depends on 2)

The pipe-handling system in accordance with claim 2, wherein the movable rotary unit and chassis are interconnected by a linear actuator.

### Claim 4 (depends on 2)

The pipe-handling system in accordance with claim 2, wherein the movable rotary unit is provided with a secondary drive which includes one or more secondary toothed wheels in engagement with a corresponding pitch rack arranged on a portion of the chassis.

### Claim 5 (depends on 1)

The pipe-handling system in accordance with claim 1, wherein, to the lower rotary unit, a circulation unit is connected, arranged to maintain a continuous supply of drilling fluid to a pipe string which is connected to said rotary unit.

### Claim 6 (depends on 1)

The pipe-handling system in accordance with claim 1, wherein the lower and upper rotary units are arranged on, respectively, lower and upper chassis sections, and the lower and upper chassis sections are releasably connected to each other and are provided with independent drives arranged to displace the chassis sections relative to each other in a vertical direction.

### Claim 7 (depends on 1)

The pipe-handling system in accordance with claim 1, wherein an upper drive on the chassis includes a first set of driving wheels which are in engagement with a first engagement portion connected to the guide track, and a second set of driving wheels which are arranged to be in engagement with a second engagement portion arranged vertically on a telescope tower portion displaceably connected to the respective first or second tower column.

### Claim 8 (depends on 7)

The pipe-handling system in accordance with claim 7, wherein the driving wheels are toothed wheels, and the engagement portions are pitch racks.

### Claim 9

A method of inserting and withdrawing a pipe string in/from a borehole by the use of a pipe-handling system, the pipe string being moved continuously in the axial direction of the borehole, wherein the method comprises:
a) hanging a first pipe or pipe section off in a rotationally rigid manner in a lower rotary unit or an upper rotary unit of a first pipe-handling unit;
b) wherein the first pipe-handling unit moves the first pipe/pipe section down the center axis of the borehole;
c) hanging a second pipe or pipe section off in a lower rotary unit or an upper rotary unit of a second pipe-handling unit;
d) wherein the second pipe-handling unit is moved downwards towards the first handling unit, bringing the second pipe or pipe section to connect to the first pipe or pipe section by the second pipe or pipe section being rotated to be screwed together with the first pipe or pipe section;
e) disengaging said rotary unit of the first pipe-handling unit from the pipe string as the pipe string has been hung off in a rotationally rigid manner in said rotary unit of the second pipe-handling unit;
f) wherein the first pipe-handling unit is moved upwards after the lower and upper rotary units (23, 23′) have been moved away from the centre axis of the borehole;
g) repeating the steps b)-f) until the pipe string is complete; and
h) reversing the steps a)-g) until the pipe string has been disassembled.

### Claim 10

A method of joining together or disassembling a pipe string by the use of a pipe-handling system, the pipe string being moved continuously in the axial direction of the borehole, wherein the method comprises:
a) hanging a first pipe off in a rotationally rigid manner in a rotary unit of a lower pipe-handling section;
b) wherein the lower pipe-handling section moves the first pipe down the center axis of the borehole;
c) placing an upper pipe-handling section in its upper position in which a second pipe is hung off in a rotary unit of the upper pipe-handling section;
d) wherein the upper pipe-handling section is moved downwards towards the lower pipe-handling section, bringing the second pipe to connect to the first pipe by the second pipe being rotated to be screwed together with the first pipe;
e) disengaging the rotary unit of the lower pipe-handling section from the pipe string as the pipe string has been hung off in a rotationally rigid manner in the rotary unit of the upper pipe-handling section;
f) wherein the upper pipe-handling section and the pipe string are moved downwards;
g) wherein the lower pipe-handling section is moved upwards towards the upper pipe-handling section;
h) wherein the lower pipe-handling section is moved downwards at a rate equal to the rate of the upper pipe-handling section while the rotary unit of the lower pipe-handling section is being connected to the pipe string;
i) releasing the upper pipe-handling section the pipe string;
j) repeating the steps b)-i) until the pipe string is complete; and
k) reversing the steps a)-j) until the pipe string has been disassembled.

### Claim 11 (depends on 9)

The method in accordance with claim 9, wherein the pipe or pipe section or pipe string is hung off in a rotatable tong or in a slips arrangement in the rotary unit.

### Claim 12 (depends on 10)

The method in accordance with claim 10, wherein the pipe or pipe section or pipe string is hung off in a rotatable tong or in a slips arrangement in the rotary unit.