Evaluation of predictions in the absence of a known ground truth
AssigneeInternational Business Machines Corporation
InventorsErhan BILAL, Gustavo STOLOVITZKY
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsErhan BILAL, Gustavo STOLOVITZKY
Estimating the term…
Disclosed is a novel system, and method to evaluate a prediction of a possibly unknown outcome out of a plurality of predictions of that outcome. The method begins with accessing a particular prediction of an outcome out of a plurality of predictions of that outcome in which the outcome may be unknown. Next, a subsample of the plurality of predictions of the outcome is accessed. The subsample can possibly include the particular prediction. A consensus prediction of the outcome based on the subsample of the plurality of predictions is determined. A proximity of the particular prediction to the consensus prediction is determined. Each prediction is ranked out of the plurality of predictions in an order of a closest in proximity to the consensus prediction to a farthest in proximity to the consensus prediction.
A method to evaluate a prediction of an outcome out of a plurality of predictions of that outcome, the method comprising:
15-20. (canceled)
Dependencies are inferred from the claim text.