Method for estimating cable plant topology
AssigneeGeneral Instrument Corporation
InventorsDavid B. Bowler, Brian M. Basile
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Instrument Corporation
InventorsDavid B. Bowler, Brian M. Basile
Estimating the term…
A method of estimating a topology of a network in which an estimated geographic path of cables of a network between a geographic location of a network component and a geographic location of a terminal network element is automatically generated from data providing the geographic location of the network component and the geographic location of the terminal network element. If the estimated geographic path includes an intersection of separate branches of the path located a predetermined distance from the network component in a downstream direction extending from the network component to the terminal network element, the estimated geographic path is automatically adjusted by replacing the intersection in the estimated geographic path with separate non-intersecting paths extending from different outlet ports of the network component to the separate branches.
A method of estimating a topology of a network, comprising the steps of:
A method according to claim 6, wherein, during said estimating step, the geo-encoded data is used to electronically determine a path extending along the geographic layout of streets and corresponding to a shortest walking distance along the streets between the geographic location of the network component and the geographic location of the terminal network element, and wherein the path corresponding to the shortest walking distance along the streets is used as the estimated geographic path of the cables of the network.
A signal processing electronic device for estimating a topology of a network, comprising at least one processing unit configured to:
At least one non-transitory computer readable storage medium having computer program instructions stored thereon that, when executed by at least one processor, cause the at least one processor to:
Dependencies are inferred from the claim text.