Method and system for managing construction projects
OwnerSandy MacElheron, Gang Hong +1inventors
InventorsSandy MacElheron, Gang Hong, Ben Swan
Life of this patent
Estimating the term…
Loading patent…
OwnerSandy MacElheron, Gang Hong +1inventors
InventorsSandy MacElheron, Gang Hong, Ben Swan
Estimating the term…
Methods and systems for managing construction projects are provided. The methods and systems can be based on component-associated data where components can be assigned identifiers, drawings, cost codes, and man-hour values according to industry standards. Components can be grouped, sorted, searched and accessed through a database (a component library). Project schedules and work packages can be formed based on components and their associated data through a planning system. The schedule can be altered at the component level by adding or removing components, or stretching or shrinking the schedule. Constraints can be used to restrict a schedule or work package from being released until the constraints are satisfied. Once released, schedules can be updated to track construction progress of the project underway through a tracking system. Reports can be generated to reflect productivity of construction crews or individuals and track progress of the project.
A method for managing a construction project based on component data, the method comprising:
A system for managing construction projects, the system comprising:
A software program for managing a construction project based on component data, embodied on a computer readable medium, the software program comprising:
A computerized method for using a commerce application of managing a construction project based on component data, comprising:
Dependencies are inferred from the claim text.