In-situ optimization of chilled water plants
AssigneeEntic, LLC
InventorsIgor F. Gonzalez, Hari Kishore Adluru, Aparna Aravelli
Life of this patent
Estimating the term…
Loading patent…
AssigneeEntic, LLC
InventorsIgor F. Gonzalez, Hari Kishore Adluru, Aparna Aravelli
Estimating the term…
A model based optimization method for determining optimized operating conditions to minimize overall power consumption of a chiller plant includes identifying each of the plurality of chiller plant subsystems in the chiller plant, generating a chiller performance model and a chiller stalling model, generating a cooling tower performance model, generating a chilled water pump performance model, generating a condenser water pump model, formulating a chiller plant optimization model, receiving chiller plant input data from the chiller plant, solving the chiller plant optimization model using the chiller plant input data, generating optimized chiller plant subsystems outputs, comparing the optimized chiller plant subsystems outputs to current operating chiller plant subsystems, generating projected energy savings of the optimized chiller plant subsystems, comparing the projected energy savings to an energy saving threshold value, when the projected energy savings exceeds the energy saving threshold value, sending the optimized chiller plant subsystems output to a building control system.
A model based optimization method for determining optimized operating conditions to minimize overall power consumption of a chiller plant having a plurality of chillers of equal capacity and from the same manufacturer, a plurality of cooling towers, a plurality of chilled water pumps and a plurality of condenser water pumps arranged in parallel and coupled to a common header on a chilled water side and a common header on a condenser water side, the method comprising:
Dependencies are inferred from the claim text.