# US 2014/0210256 A1 · Power generation system with anticipatory operation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2014/0210256 A1
- Document ID: US20140210256A1
- Status: Published application
- Kind: A1
- Application number: 14/186,358
- Filed: 2014-02-21
- Published: 2014-07-31
- Earliest claimed: 2012-07-02
- Assignees: Kohler Co.
- Applicants: Kohler Co.
- Inventors: Joseph Petrus Eduardus Raats; Anthony J. Hackbarth; Isaac S. Frampton
- Web page: https://patentgrep.com/patent/US20140210256A1

## CPC

- H02J 9/06: with automatic change-over {, e.g. UPS systems}
- H02J 9/00: Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J 9/08: requiring starting of a prime-mover
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 9/068: {Electronic means for switching from one power supply to another power supply, e.g. to avoid parallel connection}
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

Systems and methods include operating a power system in a first state, and detecting an anticipated load increase. The systems and methods further include changing operation of the power system from the first state to a second state upon detection of the anticipated load increase.

## Claims

### Claim 1

A method comprising:
operating a power system in a first state;
detecting an anticipated load increase;
changing operation of the power system from the first state to a second state upon detection of the anticipated load increase.

### Claim 2 (depends on 1)

The method of claim 1, wherein the first state comprises a standard state of operation, and wherein the second mode comprises an anticipation state of operation.

### Claim 3 (depends on 1)

The method of claim 1, wherein detecting the anticipated load increase comprises receiving a signal from a global positioning system.

### Claim 4 (depends on 1)

The method of claim 1, wherein detecting the anticipated load increase comprises receiving an anticipated load increase indication from a joystick, toggle switch, or button.

### Claim 5 (depends on 1)

The method of claim 1, wherein the anticipated load increase is detected based on a location of the power system.

### Claim 6 (depends on 1)

The method of claim 1, wherein the power system comprises a power source, the power source being inactive when the power system is operated in the first state; and
wherein changing the operation of the power system from the first state to the second state comprises starting the power source.

### Claim 7

A system comprising:
an input configured to receive an anticipated load increase indication;
a controller in communication with the input and comprising:
a non-transitory computer readable storage medium storing logic for controlling a power system, the logic comprising:
instructions for identifying an anticipated load increase;
instructions for operating the power system in a first state prior to identification of the anticipated load increase;
instructions for operating the power system in a second state upon identification of an anticipated load increase; and
a processor configured to execute the logic.

### Claim 8 (depends on 7)

The system of claim 7, wherein the power system comprises a plurality of power sources.

### Claim 9 (depends on 8)

The system of claim 8, wherein the instructions for operating the power system in the first state comprise instructions for controlling each of the plurality of power sources to either be inactive or to operate in a power supply mode.

### Claim 10 (depends on 8)

The system of claim 8, wherein the instructions for operating the power system in the second state comprise instructions for controlling each of the plurality of power sources to either operate in a power supply mode or an offline mode.

### Claim 11 (depends on 10)

The system of claim 10, further comprising instructions for identifying a load increase when the power system operates in the second state.

### Claim 12 (depends on 11)

The system of claim 11, wherein the logic further comprises instructions to control the power sources operating in the offline mode in the second state to operate in the power supply mode upon identification of the load increase.

### Claim 13 (depends on 10)

The system of claim 10, wherein the power sources operating in the power supply mode are operating and are supplying power to a load connected with the power system;
wherein the power sources operating in the offline mode are operating and are not supplying power to the load; and
wherein the inactive power sources are not operating.

### Claim 14 (depends on 7)

The system of claim 7, wherein the logic further comprises instructions for monitoring a load powered by the power system.

### Claim 15 (depends on 7)

The system of claim 7, wherein the power system comprises a plurality of power sources;
wherein the instructions for operating the power system in a first state prior to identification of the anticipated load increase comprise instructions for operating a first set of the power sources in a power supply mode and controlling a second set of power sources to be inactive; and
wherein the instructions for operating the power system in a second state upon identification of an anticipated load increase comprise instructions for operating the first set of the power sources in the power supply mode and operating the second set of power sources in an offline mode.

### Claim 16

A system comprising:
a power source connected with a vehicle;
a load anticipation unit that detects a parameter associated with the vehicle;
a controller that controls an operation of the power source;
wherein the power source is inactive before an anticipated load increase is identified;
wherein the controller receives the parameter and identifies an anticipated load increase based on the parameter;
wherein the controller controls the power source to operate in an offline mode when the anticipated load increase is identified.

### Claim 17 (depends on 16)

The system of claim 16, wherein the parameter comprises a location of the vehicle.

### Claim 18 (depends on 17)

The system of claim 17, wherein the controller compares the location of the vehicle to a threshold associated with a point of interest; and
wherein the controller identifies an anticipated load increase when the location of the vehicle is within the threshold.

### Claim 19 (depends on 18)

The system of claim 18, wherein the controller monitors a load to identify a load increase associated with the anticipated load increase; and
wherein the controller controls the power source to change from operating in an offline mode to operate in a power supply mode when the load increase associated with the anticipated load increase is identified.

### Claim 20 (depends on 18)

The system of claim 18, wherein the vehicle is a boat, and wherein the point of interest is a port or dock.
