# US 2014/0209327 A1 · Single trip completion system and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2014/0209327 A1
- Document ID: US20140209327A1
- Status: Published application
- Kind: A1
- Application number: 14/166,019
- Filed: 2014-01-28
- Published: 2014-07-31
- Earliest claimed: 2013-01-28
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Dinesh R. Patel
- Web page: https://patentgrep.com/patent/US20140209327A1

## CPC

- E21B 33/12: Packers; Plugs (used for cementing E21B33/134, E21B33/16)
- E21B 43/12: Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method includes in a single trip running a completion system having an internal bore into a wellbore that penetrates a formation zone, the completion system having an upper completion connected to a lower completion, setting an isolation packer forming a barrier above the formation zone, displacing the annulus fluid above the set isolation packer and then setting an upper packer thereby providing a completion barrier above the set isolation packer. The annulus fluid may be displaced prior to setting an upper completion packer.

## Claims

### Claim 1

A single trip completion system, comprising:
an upper completion and a lower completion connected at a coupler to be run into a wellbore as a unit in a single trip;
the lower completion comprising:
an isolation packer;
a fluid communication valve located above the isolation packer to control communication between a completion bore and an annulus of the wellbore; and
an upper packer located above the fluid communication valve.

### Claim 2 (depends on 1)

The completion system of claim 1, wherein the lower completion comprises an element located below the isolation packer, the element being one selected from a flow control valve and a stand-alone screen.

### Claim 3 (depends on 1)

The completion system of claim 1, wherein the coupler comprises a latch to selectively disconnect the upper completion from the lower completion.

### Claim 4 (depends on 1)

The completion system of claim 1, wherein the upper completion comprises a completion packer.

### Claim 5 (depends on 1)

The completion system of claim 1, wherein the upper completion comprises a tubing movement compensation joint.

### Claim 6

A method, comprising:
in a single trip running a completion system having an internal bore into a wellbore that penetrates a formation zone, the completion system comprising an upper completion connected to a lower completion;
setting an isolation packer forming a barrier above the formation zone in an annulus between the lower completion and the wellbore;
displacing an annulus fluid above the set isolation packer; and
after the displacing, setting an upper packer thereby providing a completion barrier above the isolation packer.

### Claim 7 (depends on 6)

The method of claim 6, comprising after the setting the upper packer disconnecting the upper completion from the lower completion, and pulling the disconnected upper completion from the wellbore.

### Claim 8 (depends on 6)

The method of claim 6, wherein the lower completion comprises a flow control valve located below the isolation packer.

### Claim 9 (depends on 6)

The method of claim 6, wherein the displacing the annulus fluid comprises communicating a fluid from the internal bore through a fluid communication valve into the annulus.

### Claim 10 (depends on 6)

The method of claim 6, wherein the lower completion comprises a stand-alone screen located below the isolation packer.

### Claim 11 (depends on 6)

The method of claim 6, wherein the upper packer is located in the lower completion and a fluid communication valve is located between the upper packer and the isolation packer, wherein the displacing the annulus fluid comprises communicating a fluid from the internal bore through the fluid communication valve into the annulus.

### Claim 12 (depends on 6)

The method of claim 6, wherein the upper completion comprises a completion packer, wherein the displacing the annulus fluid is performed before setting the completion packer.

### Claim 13 (depends on 12)

The method of claim 12, comprising after the setting the upper packer disconnecting the upper completion from the lower completion, and pulling the disconnected upper completion from the wellbore.

### Claim 14 (depends on 12)

The method of claim 12, wherein the displacing the annulus fluid comprises communicating a fluid from the internal bore through a fluid communication valve into the annulus.

### Claim 15 (depends on 12)

The method of claim 12, wherein the upper packer is located in the lower completion and a fluid communication valve is located between the upper packer and the isolation packer, wherein the displacing the annulus fluid comprises communicating a fluid from the bore through the fluid communication valve into the annulus.

### Claim 16

A method, comprising:
in a single trip running a completion system having an internal bore into a wellbore penetrating a formation zone, the completion system comprising an upper completion connected at a coupler to a lower completion, wherein the lower completion comprises an isolation packer, a fluid communication valve located above the isolation packer operable to control fluid communication between the internal bore and an annulus of the wellbore, and an upper packer located above the fluid communication valve;
setting the isolation packer above the formation zone;
displacing an annulus fluid above the set isolation packer in response to circulating a fluid from the internal bore through the fluid communication valve; and
after the displacing setting the upper packer thereby providing a completion barrier above the isolation packer.

### Claim 17 (depends on 16)

The method of claim 16, wherein the upper completion comprises a packer, wherein the displacing the annulus fluid is performed before the packer of the upper completion is set.

### Claim 18 (depends on 16)

The method of claim 16, further comprising after the setting the upper packer of the lower completion, disconnecting the upper completion at the coupler and pulling the upper completion out of the wellbore.

### Claim 19 (depends on 18)

The method of claim 18, further comprising:
after providing the completion barrier, disconnecting the upper completion at the coupler and pulling the upper completion out of the wellbore; and
running the upper completion back into the wellbore and connecting to the lower completion.

### Claim 20 (depends on 16)

The method of claim 16, wherein the lower completion comprises a flow control valve located below the isolation packer.
