- Number: US 2014/0208130 A1
- Document ID: US20140208130A1
- Status: Published application
- Kind: A1
- Application number: 14/221,069
- Filed: 2014-03-20
- Published: 2014-07-24
- Earliest claimed: 2010-06-28
- Assignees: Amazon Technologies, Inc.
- Applicants: Amazon Technologies, Inc.
- Inventors: OSVALDO P. MORALES; James R. Hamilton
- Web page: https://patentgrep.com/patent/US20140208130A1

## CPC

- G06F 1/30: Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations (for resetting only G06F1/24)
- H02J 9/02: in which an auxiliary distribution system and its associated lamps are brought into service
- H02J 9/04: in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J 9/06: with automatic change-over {, e.g. UPS systems}
- H02J 9/061: {for DC powered loads}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

A system for performing computing operations in a data center includes one or more sets of computer systems, one or more primary power systems, and a reserve power system. The primary power systems include at least one power distribution unit that supplies power to at least one of the sets of computer systems. The reserve power system automatically supplies power to at least one of the sets of computer systems if a condition is met (such as a failure of the primary power system).

## Claims

### Claim at position 1

-28. (canceled)

### Claim 29

A system for supplying power, comprising:
two or more sets of computer systems;
one or more primary power systems coupled to, and configured to supply primary power to, the two or more sets of computer systems, wherein at least one of the one or more primary power systems comprises:
a downstream portion configured to distribute power to the one or more sets of computer systems,
an upstream portion configured to selectively supply primary power from one or more primary power sources to the downstream portion; and
a reserve power system coupled to, and configured to automatically supply reserve power to, at least one of the two or more sets of computer systems through at least the downstream portion of the at least one primary power system, wherein the total power requirements of the two or more sets of computer systems exceed the capacity of the reserve power system to supply power;
wherein the reserve power system is configured to selectively switch the downstream portion from distributing, to an individual set of computer systems, primary power received from the upstream portion of the at least one primary power system to distributing reserve power received from an upstream portion of the reserve power system, such that at least one other individual set of computer systems continues to receive primary power.

### Claim 30 (depends on 29)

The system of claim 29, wherein:
the upstream portion of the reserve power system further comprises one or more automatic transfer switches; and
wherein at least one of the one or more automatic transfer switches is configured to automatically switch the downstream portion of the at least one primary power system from supplying primary power received from the upstream portion of the at least one primary power system to supplying reserve power received from the upstream portion of the reserve power system.

### Claim 31 (depends on 29)

The system of claim 29, wherein:
the two or more sets of computer systems are included in one or more computing modules that comprise a first computing module and a second computing module;
the one or more primary power systems comprise a first primary power system configured to supply power to the first computing module and a second primary power system configured to supply primary power to the second computing module; and
the reserve power system is configured to:
automatically supply power to the first computing module via a downstream portion of the first primary power system to bypass an upstream portion of the first primary power system, and
automatically supply power to the second computing module via a downstream portion of the second primary power system to bypass an upstream portion of the second primary power system.

### Claim 32 (depends on 29)

The system of claim 29, wherein:
The upstream portion of the at least one primary power system comprises a primary power-side uninterruptible power supply (UPS);
the downstream portion of the at least one primary power system comprises a primary power-side power distribution unit (PDU); and
wherein, to selectively switch the downstream portion from distributing primary power received to distributing reserve power, the reserve power system is configured to selectively switch the primary power-side PDU from distributing primary power received from the primary power-side UPS to distributing reserve power received from the upstream portion of the reserve power system.

### Claim 33 (depends on 32)

The system of claim 32, wherein:
the upstream portion of the reserve power system comprises a reserve power-side UPS; and
wherein, to selectively switch the downstream portion from distributing primary power received to distributing reserve power, the reserve power system is further configured to selectively switch the primary power-side PDU from distributing primary power received from the primary power-side UPS to distributing reserve power received from the reserve power-side UPS.

### Claim 34 (depends on 29)

The system of claim 29, wherein:
the reserve power system comprises one or more shut-down devices; and
to protect against overload of the reserve power system, at least one of the shut-down devices is configured to automatically shut down at least one of the sets of computer systems if at least one condition is met.

### Claim 35 (depends on 34)

The system of claim 34, wherein the reserve power system is configured to prioritize at least one of the computer systems or at least one of the sets of computer systems, wherein the reserve power system is configured to shut-down at least one relatively low priority computer system while continuing to supply reserve power to at least one other computer system.

### Claim 36 (depends on 29)

The system of claim 29, wherein the at least one of the sets of computer systems corresponds to a rack system in a data center.

### Claim 37

A system for providing reserve power to computer systems in a data center, comprising:
a reserve power system coupled to, and configured to automatically supply power to two or more sets of computer systems each receiving power from one or more individual primary power systems if at least one condition is met, each individual primary power system comprising an upstream portion and a downstream portion, the reserve power system comprising:
a reserve power source; and
an automatic transfer switch configured to automatically switch an individual set of computer systems from receiving power from a primary power source through a downstream portion of an individual primary power system to receiving power from the reserve power source through the downstream portion of the individual primary power system, such that another individual set of computer systems continues to receive power from the primary power source through another downstream portion of another individual primary power system;
wherein the total power requirements of the two or more sets of computer systems coupled to the reserve power system exceed a capacity of the reserve power system to supply power.

### Claim 38 (depends on 37)

The system of claim 37, wherein the automatic transfer switch comprises:
a primary power input coupled to an output of the upstream portion of the individual primary power system;
a reserve power input coupled to an output of an upstream portion of the reserve power system; and
a power output coupled to an input of the downstream portion of the individual primary power system;
wherein the automatic transfer switch is configured to selectively route power to the input of the downstream portion of the individual primary power system from one of the upstream portions.

### Claim 39 (depends on 38)

The system of claim 38, wherein:
the downstream portion of the individual primary power system comprises a primary power-side power distribution unit (PDU); and
wherein, to selectively route power to the input of the downstream portion of the individual primary power system from one of the upstream portions, the automatic transfer switch is configured to selectively route power to an input of the primary power-side PDU.

### Claim 40 (depends on 39)

The system of claim 39, wherein:
the upstream portion of the at least one primary power system comprises a primary power-side uninterruptible power supply (UPS); and
the upstream portion of the reserve power system comprises a reserve power-side UPS;
wherein, to selectively route power to the power input of the primary power-side PDU, the automatic transfer switch is configured to selectively route power from one of the primary power-side UPS or the reserve power-side UPS.

### Claim 41 (depends on 37)

The system of claim 37, wherein:
the reserve power system comprises one or more shut-down devices; and
to protect against overload of the reserve power system, at least one of the shut-down devices is configured to automatically shut down at least one of the sets of computer systems if at least one condition is met.

### Claim 42 (depends on 41)

The system of claim 41, wherein the reserve power system is configured to prioritize at least one of the computer systems or at least one of the sets of computer systems, wherein the reserve power system is configured to shut-down at least one relatively low priority computer system while continuing to supply reserve power to at least one other computer system.

### Claim 43 (depends on 37)

The system of claim 37, wherein the automatic transfer switch comprises a manual override.

### Claim 44

A method of supplying reserve power to computer systems in a data center, comprising:
monitoring a primary power feed supplied to at least one set of computer systems through an upstream portion and a downstream portion of an individual primary power system, wherein the downstream portion is configured to distribute received power to the at least one set of computer systems; and
in response to an at least partial failure of the primary power feed in the upstream portion of the individual primary power system, automatically switching the downstream portion of the primary power system from receiving the primary power feed from the upstream portion to receiving a reserve power feed from a reserve power system, such that the downstream portion of the individual primary power system distributes power received from the reserve power feed to the at least one set of computer systems and the upstream portion is bypassed;
wherein the total power requirements of the one or more sets of computer systems exceed the capacity of the reserve power system to supply power.

### Claim 45 (depends on 44)

The method of claim 44, wherein:
the upstream portion of the individual primary power system comprises a primary power-side uninterruptible power supply (UPS);
the downstream portion of the individual primary power system comprises a primary power-side power distribution unit (PDU);
the reserve power system comprises a reserve power-side UPS; and
automatically switching the downstream portion of the individual primary power system to receive the reserve power feed comprises switching from routing the primary power feed from the primary power-side UPS to the primary power-side PDU to routing the reserve power feed from the reserve power-side UPS to the primary power-side PDU.

### Claim 46 (depends on 44)

The method of claim 44, wherein automatically switching the downstream portion of the individual primary power system comprises switching the downstream portion of one of a plurality of primary power systems to receive the reserve power feed, such that:
the downstream portion of the one primary power system distributes power received from the reserve power feed to at least one set of computer systems, and
at least one downstream portion of at least one other of the plurality of primary power systems continues to distribute power from the primary power feed to at least one other set of computer systems.

### Claim 47 (depends on 44)

The method of claim 44, further comprising automatically shutting down at least one of the computer systems if at least one condition is met to protect against overload of the reserve power system.

### Claim 48 (depends on 47)

The method of claim 47, further comprising:
prioritizing at least one of the computer systems or sets of computer systems; and
automatically shutting down at least one of the computer systems if at least one condition is met to protect against overload of the reserve power system.