# US 2014/0207693 A1 · Systems, Devices, Components and Methods for Monitoring, Certifying and/or Recertifying the Performance of a Building or Structure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2014/0207693 A1
- Document ID: US20140207693A1
- Status: Published application
- Kind: A1
- Application number: 13/843,811
- Filed: 2013-03-15
- Published: 2014-07-24
- Earliest claimed: 2013-01-24
- Assignees: United States Green Building Council (USGBC)
- Applicants: United States Green Building Council (Usgbc)
- Inventors: Scot Horst; Mahesh Ramanujam; Dhruv Gami; S. Richard Fedrizzi
- Web page: https://patentgrep.com/patent/US20140207693A1

## CPC

- G06Q 30/018: Certifying business or products
- G06Q 50/16: Real estate
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Described and disclosed herein are various embodiments of method and systems for monitoring, certifying or recertifying performance of a building or structure. Such systems and methods may include or employ at least one building or structure data acquisition device, building or structure performance data corresponding to the building or structure, at least one dashboard device operably connected to the data acquisition device, and computer and/or internet means for transferring at least portions of the building or structure performance data to a server. The server or another computer is configured and programmed to certify or not certify the building or structure as meeting building or structure performance certification standards.

## Claims

### Claim 1

A method for monitoring, certifying or recertifying performance of a building or structure, comprising:
acquiring building or structure performance data corresponding to the building or structure, the performance data comprising at least three of water data, energy data, human experience data, transportation data, and waste data;
displaying, using at least one building or structure dashboard device, the performance data to at least one of a building or structure user and a building or structure dashboard manager;
transferring at least portions of the performance data to a server, and
on the basis of the transferred data, certifying or not certifying the building or structure as meeting predetermined building or structure performance certification standards.

### Claim 2 (depends on 1)

The method of claim 1, further comprising acquiring the building or structure performance data using at least one building or structure data acquisition device and corresponding sensors and data inputs located in the building or structure, the data acquisition device being operably connected to the dashboard device.

### Claim 3 (depends on 2)

The method of claim 2, wherein the data acquisition device comprises a variable air volume control device or system.

### Claim 4 (depends on 2)

The method of claim 2, further comprising the user or dashboard manager inputting building or structure performance data into the dashboard device.

### Claim 5 (depends on 2)

The method of claim 2, further comprising the user or dashboard manager inputting building or structure performance data into the data acquisition device.

### Claim 6 (depends on 1)

The method of claim 1, further comprising associating a unique IP address with the building or structure.

### Claim 7 (depends on 1)

The method of claim 1, further comprising using at least one of a mobile phone, a desktop computer, a laptop computer, a tablet computer, a personal data assistant (PDA) and a touchscreen device as the dashboard device.

### Claim 8 (depends on 1)

The method of claim 1, further comprising providing the water data with at least one water meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device.

### Claim 9 (depends on 1)

The method of claim 1, further comprising providing the energy data with at least one energy meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device.

### Claim 10 (depends on 1)

The method of claim 1, further comprising providing the waste data with at least one of: (a) a waste meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, and (b) waste data inputs entered by the user or dashboard manager into the building data acquisition device or the dashboard device.

### Claim 11 (depends on 1)

The method of claim 1, further comprising providing human experience data with at least one of: (a) a human experience meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, and (b) human experience data inputs entered by at least one of the user, the dashboard manager and an occupant of the building or structure into the building data acquisition device or the dashboard device.

### Claim 12 (depends on 1)

The method of claim 1, further comprising providing transportation data with at least one of: (a) a transportation meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, and (b) transportation data inputs entered by at least one of the user, the dashboard manager and an occupant of the building or structure into the building data acquisition device or the dashboard device.

### Claim 13 (depends on 1)

The method of claim 1, further comprising transferring the performance data to the server via the internet.

### Claim 14 (depends on 13)

The method of claim 13, further comprising transferring the performance data to the server from the data acquisition device.

### Claim 15 (depends on 13)

The method of claim 13, further comprising transferring the performance data to the server from the dashboard device.

### Claim 16 (depends on 1)

The method of claim 1, wherein at least portions of the performance data are provided to the building or structure data acquisition device wirelessly.

### Claim 17 (depends on 1)

The method of claim 1, further comprising wirelessly providing the performance data to at least one of the data acquisition device and the dashboard device.

### Claim 18 (depends on 1)

The method of claim 1, further comprising generating a score for the performance data received from the building or structure.

### Claim 19 (depends on 18)

The method of claim 18, further comprising including at least one of indoor air quality, carbon dioxide levels, occupancy rates, occupant satisfaction, and absentee rates in the human experience data when determining the score.

### Claim 20 (depends on 18)

The method of claim 18, further comprising including at least one of commuting methods, commuting distances, and carbon dioxide equivalents associated with the commuting methods, and carbon dioxide equivalents associated with the commuting distances in the transportation data when determining the score.

### Claim 21 (depends on 18)

The method of claim 18, further comprising including at least one of water use in the building or structure space, water use for equipment located in the building or structure, water use in cooling towers associated with the building or structure, and irrigation associated with the building or structure in the water data when determining the score.

### Claim 22 (depends on 18)

The method of claim 18, further comprising including at least one of energy use in the building or structure, a type of the building or structure, a construction method or design associated the building or structure, an occupancy rate of the building or structure, and weather data associated with the building or structure in the energy data when determining the score.

### Claim 23 (depends on 18)

The method of claim 18, further comprising including at least one of an amount of waste generated in the building or structure, an amount of waste diverted to compost from the building or structure, and an amount of waste recycled from the building or structure in the waste data when determining the score.

### Claim 24 (depends on 18)

The method of claim 18, further comprising employing the score to determine whether the building or structure meets the predetermined performance certification standards.

### Claim 25 (depends on 24)

The method of claim 24, further comprising certifying or not certifying the building or structure as meeting the predetermined performance certification standards on the basis of the score.

### Claim 26 (depends on 25)

The method of claim 25, further comprising subsequently re-certifying or not re-certifying the building or structure as meeting the predetermined performance certification standards on the basis of an updated score.

### Claim 27

A system for monitoring, certifying or recertifying performance of a building or structure, comprising:
at least one building or structure data acquisition device configured to receive input signals from a plurality of sensors located in or around the building or structure, the input signals representing building or structure performance data corresponding to the building or structure, the performance data comprising at least three of water data, energy data, human experience data, transportation data, and waste data;
at least one dashboard device operably connected to the data acquisition device, the dashboard device being configured to display the performance data to at least one of a building or structure user and a building or structure dashboard manager, the dashboard device further being configured to receive building or structure performance input data from at least one of the user and the manager;
computer and internet means for transferring at least portions of the building or structure performance data to a server, the server being configured and programmed to at least one of store the transferred data for analysis and to certify or not certify the building or structure as meeting the performance certification standards.

### Claim 28 (depends on 27)

The system of claim 27, wherein the data acquisition device is further configured to receive building or structure performance input data from the user or dashboard manager.

### Claim 29 (depends on 27)

The system of claim 27, wherein the building data acquisition device comprises a variable air volume control device or system.

### Claim 30 (depends on 27)

The system of claim 27, wherein the building or structure has a unique IP address associated therewith.

### Claim 31 (depends on 27)

The system of claim 27, wherein the dashboard device is at least one of a mobile phone, a desktop computer, a laptop computer, a tablet computer, a personal data assistant (PDA) and a touchscreen device as the dashboard device.

### Claim 32 (depends on 27)

The system of claim 27, further comprising at least one water meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, the water meter or monitor being configured to provide at least portions of the water data.

### Claim 33 (depends on 27)

The system of claim 27, further comprising at least one energy meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, the energy meter or monitor being configured to provide at least portions of the energy data.

### Claim 34 (depends on 27)

The system of claim 27, further comprising at least one waste meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, the waste meter or monitor being configured to provide at least portions of the energy data.

### Claim 35 (depends on 27)

The system of claim 27, further comprising at least one human experience meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, the human experience meter or monitor being configured to provide at least portions of the human experience data.

### Claim 36 (depends on 27)

The system of claim 27, further comprising at least one transportation meter or monitor located in the building or structure and operably connected to at least one of the data acquisition device and the dashboard device, the transportation meter or monitor being configured to provide at least portions of the transportation data.

### Claim 37 (depends on 27)

The system of claim 27, further comprising an internet connection between the server and at least one of the data acquisition device and the dashboard device.

### Claim 38 (depends on 27)

The system of claim 27, wherein at least some of the plurality of sensors are configured to wirelessly transfer the input data signals to the building or structure data acquisition device.

### Claim 39 (depends on 27)

The system of claim 27, further comprising wireless means configured to provide the performance data to at least one of the data acquisition device and the dashboard device.
