# US 2014/0207507 A1 · Recording, tracking and evaluating system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2014/0207507 A1
- Document ID: US20140207507A1
- Status: Published application
- Kind: A1
- Application number: 14/240,513
- Filed: 2012-08-23
- Published: 2014-07-24
- Earliest claimed: 2011-08-23
- Inventors: Giuseppe Cirianni
- Web page: https://patentgrep.com/patent/US20140207507A1

## CPC

- G06Q 10/063114: {Status monitoring or status determination for a person or group}
- G06Q 10/10: Office automation; Time management
- G06Q 40/00: Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A system for continuously carry out a determination in real time of whether said signals received from the plurality of separate secondary inputs satisfy criteria derived from said project schedule with relation to the value of said clock means, update said output means status data, so as to output a communication a result of said determination and as per the communication template, and update said project schedule data as a function of a result of said determination.

## Claims

### Claim at position 1

1-30. (canceled)

### Claim 31

A system for recording, tracking and evaluating for project control, comprising:
a. a first input receiving a plurality of input data to define details of at least part of a project including a predetermined level of completion of the at least part of a project;
b. a secondary input receiving real time data related to the at least part of a project;
c. a determinator comparing the real time data of the secondary input with the input data of the first input in order to assess the at least part of a project and the gradual completion of the at least part of a project to the predetermined level of completion of the at least part of the project; and
d. an automatic notificator that sends output to one or more users defined in the input data according to the determinator assessment of completion to the predetermined level of the at least part of a project to the predetermined level according to the project;
wherein the at least part of the project assessed by the determinator provides automatic real-time control according to the defined at least part of a project.

### Claim 32 (depends on 31)

A system for recording, tracking and evaluating according to claim 31, wherein the input data of the first input defines the characteristics of a plurality of subprojects according to schedule, tasks, people and time.

### Claim 33 (depends on 32)

A system for recording, tracking and evaluating according to claim 32, wherein the at least two of the subprojects to be undertaken are at least partially concurrent.

### Claim 34 (depends on 33)

A system for recording, tracking and evaluating according to claim 33, wherein the input data of the first input defines the following:
a. a first activation point at which time and position in the defined schedule a subproject is to begin;
b. a second completion point at which time and position in the defined schedule a subproject is to be completed;
c. at least one third gradual completion point at which time and position in the defined schedule a subproject is to have reached a defined gradual completion point; and
d. at least one fourth review point at which time and position in the defined schedule a subproject is to be reviewed.

### Claim 35 (depends on 34)

A system for recording, tracking and evaluating according to claim 34, wherein the determinator compares the secondary input with the first input in order to assess if any one or more of the first activation points has been reached and instigates the automatic notificator to sending output signals to the identified people in the input data to begin the at least part of a project to the predetermined level according to the project.

### Claim 36 (depends on 35)

A system for recording, tracking and evaluating according to claim 35, wherein the determinator compares the secondary input with the first input in order to assess if any one or more of the second completion points has been reached and instigates the automatic notificator to sending output signals to the identified people in the input data to begin the next at least part of a project to the predetermined level according to the project.

### Claim 37 (depends on 36)

A system for recording, tracking and evaluating according to claim 36, wherein the determinator compares the secondary input with the first input in order to assess if any one or more of the at least one of the third gradual completed points input has been reached and instigates the automatic notificator to sending output signals to the identified people in the input data to begin the next at least part of a project to the predetermined level according to the project.

### Claim 38 (depends on 37)

A system for recording, tracking and evaluating according to claim 37, wherein the determinator compares the secondary input with the first input in order to assess if any one or more of the at least one of the fourth review points has been reached and instigates the automatic notificator to sending output signals to the
identified people in the input data to review the at least part of a project to the
predetermined level according to the project.

### Claim 39 (depends on 32)

A system for recording, tracking and evaluating according to claim 32, wherein each subproject preferably represents at least one subcontractor or tradesperson, wherein the secondary input receives real time data related to location of the at least one subcontractor or tradesperson involved in the subproject.

### Claim 40 (depends on 39)

A system for recording, tracking and evaluating according to claim 39, wherein the first input includes a predetermined gradual completion level of each subproject according to the gradual completion of one or more other subprojects to a predetermined level.

### Claim 41 (depends on 39)

A system for recording, tracking and evaluating according to claim 39, wherein the secondary input receives real time data related to the at least part of a project.

### Claim 42 (depends on 41)

A system for recording, tracking and evaluating according to claim 41, wherein the secondary input is entered by an automatic GPS locator connected with a subcontractor or tradesperson of each assignment.

### Claim 43 (depends on 41)

A system for recording, tracking and evaluating according to claim 41, wherein the secondary input is entered by a swipe card by a subcontractor or tradesperson at the completion of each assignment.

### Claim 44 (depends on 32)

A system for recording, tracking and evaluating according to claim 32, wherein the determinator compares the secondary input with the first input in order to assess the subprojects and the gradual completion of the subprojects to the predetermined level according to the project wherein the output is determined by the determinator's assessment of the gradual completion of the assignment to a predetermined level.

### Claim 45 (depends on 32)

A system for recording, tracking and evaluating according to claim 32, wherein the automatic notificator sends output signals to one or more users according to the determinator assessment of completion to the predetermined level of at least one of the subprojects to initiate completion of one or more subprojects or concurrently.

### Claim 46 (depends on 32)

A system for recording, tracking and evaluating according to claim 32, wherein once the determinator has recognised from the secondary input that the predetermined level has been reached, an automatic output is sent wherein the automatic output, in one form, signals for a quality check to be performed and wherein the automatic output, in a second form, signals for a second subproject to commence.

### Claim 47 (depends on 32)

A system for recording, tracking and evaluating according to claim 32, wherein the input of the secondary input provides redefining of the system by the determinator.

### Claim 48

A system for recording, tracking and evaluating for project control, using a computer network, comprising:
a. a first input receiving a plurality of input data to define details of at least part of a project including a predetermined level of completion of the at least part of a project, the first input adapted to receive project schedule, said project schedule data defining times by which specified activities are to be performed by a plurality of users undertaking to complete at least part of the project;
b. a first memory adapted to store said project schedule data;
c. a second memory that stores a communication template;
d. a first output adapted to output a communication signal as a function of output status data and the communication template;
e. a plurality of separate secondary inputs remote from the first input and operable in relative locations of the at least part of a project for receiving real time data related to the at least part of a project;
f. a clock;
g. a communication arrangement which when instructed by the determinator forms as an automatic notificator and sends output communications to one or more users defined in the input data according to the determinator assessment of completion to the predetermined level of the at least part of a project to the predetermined level according to the project;
h. a first processor forming a determinator comparing the real time data of the secondary inputs with the input data of the first input in order to assess the at least part of a project and the gradual completion of the at least part of a project to the predetermined level of completion of the at least part of the project; said first processor configured to:
i. continuously carry out a determination in real time of whether said signals received from the plurality of separate secondary inputs satisfy criteria derived from said project schedule with relation to the value of said clock,
ii. update said output status data, so as to output a communication a result of said determination and as per the communication template,
iii. update said project schedule data as a function of a result of said determination,
wherein the at least part of the project assessed by the determinator provides automatic real-time control according to the defined at least part of a project.

### Claim 49 (depends on 48)

A system for recording, tracking and evaluating according to claim 48, wherein at least some of the plurality of separate secondary inputs are portable and GPS connected to provide real time position location relative to the at least part of a project.

### Claim 50 (depends on 48)

A system for recording, tracking and evaluating according to claim 48, wherein the plurality of remote secondary input with interface means adapted to send signals to the automatic project controller operate over a different communication channel to the output communicated used by automatic notificator in sending output communications to one or more users.

### Claim 51 (depends on 48)

A system for recording, tracking and evaluating according to claim 48, wherein the input data of the first input defines the communication template in relation to the activation points including the following:
a. a first activation point at which time and position in the defined schedule a subproject is to begin;
b. a second completion point at which time and position in the defined schedule a subproject is to be completed;
c. at least one third gradual completion point at which time and position in the defined schedule a subproject is to have reached a defined gradual completion point;
d. at least one fourth review point at which time and position in the defined schedule a subproject is to be reviewed;
and instigates one or more communications according to the communication template to the predefined one or more users relevant to the schedule point including relating to:
i. instruction to commence defined next step;
ii. instruction to report progress;
iii. instruction to make defined scheduled time;
iv. instruction to review.