- Number: US 2014/0207437 A1
- Document ID: US20140207437A1
- Status: Published application
- Kind: A1
- Application number: 14/223,926
- Filed: 2014-03-24
- Published: 2014-07-24
- Earliest claimed: 2011-07-25
- Assignees: Clean Power Research, L.L.C.
- Applicants: Clean Power Research, L.L.C.
- Inventors: Thomas E. Hoff
- Web page: https://patentgrep.com/patent/US20140207437A1

## CPC

- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G01W 1/12: Sunshine duration recorders (measuring intensity of sunshine G01J)
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 3/381: {Dispersed generators}
- H02J 3/466: Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02S 50/10: Testing of PV devices, e.g. of PV modules or single PV cells (testing of semiconductor devices during manufacturing {H10P74/00})
- G06F 2111/08: Probabilistic or stochastic CAD
- G06Q 50/06: Energy or water supply
- H02J 2101/24: Photovoltaics
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02B 10/10: Photovoltaic [PV]
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G01W: METEOROLOGY (radar, sonar, lidar or analogous systems, designed for meteorological use G01S13/95, G01S15/88, G01S17/95)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02S: GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES (obtaining electrical energy from radioactive sources G21H1/12; light sensitive inorganic semiconductor devices H10F; light sensitive organic semiconductor devices H10K30/00; thermoelectric devices H10N10/00; pyroelectric devices H10N15/00)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Operational specifications of a photovoltaic plant configuration can be inferred through evaluation of historical measured system production data and measured solar resource data. Based upon the location of the photovoltaic plant, a time-series power generation data set is simulated based on a normalized and preferably substantially linearly-scalable solar power simulation model. The simulation is run for a range of hypothetical photovoltaic system configurations. The simulation can be done probabilistically. A power rating is derived for each system configuration by comparison of the measured versus simulated production data, which is applied to scale up the simulated time-series data. The simulated energy production is statistically compared to actual historical data, and the system configuration reflecting the lowest overall error is identified as the inferred (and optimal) system configuration. Inferred configurations of photovoltaic plants in a photovoltaic fleet can be aggregated into a configuration of the fleet.

## Claims

### Claim 1

A computer-implemented method for inferring operational specifications of a fleet of photovoltaic power generation systems, comprising the steps of:
obtaining historical power production data measured over an earlier time period for and also locations of a plurality of photovoltaic power generation plants comprised in a photovoltaic power generation fleet;
obtaining historical measured irradiance data over the earlier time period for the locations;
defining a plurality of hypothetical photovoltaic plant configurations that each comprise a power rating and operational features hypothesized for the plants;
obtaining a configuration for each of the plants, comprising:
simulating power output production data for each of the hypothetical photovoltaic plant configurations based on a normalized photovoltaic power generation plant using the historical measured irradiance data for the earlier time period;
deriving a simulated photovoltaic system rating as a function of the historical power production data for that plant and the simulated power output production data;
scaling the simulated power output production data by the simulated photovoltaic system rating over each point in the earlier time period; and
inferring the configuration of that plant from the hypothetical photovoltaic plant configuration that exhibits a minimal error between the scaled simulated power output production data and the historical power production data for that plant;
aggregating the inferred configurations of the plants into a configuration of the photovoltaic power generation fleet,
wherein the steps are performed on a suitably-programmed computer.

### Claim 2 (depends on 1)

A method according to claim 1, further comprising the steps of:
calculating irradiance statistics based on the irradiance data; and
estimating photovoltaic production data for the fleet based on the irradiance statistics and the configuration of the fleet.

### Claim 3 (depends on 2)

A method according to claim 2, further comprising the steps of:
generating power statistics for each of the plants based on the irradiance statistics and the inferred configuration of that plant;
combining the power statistics for all of the plants in the fleet; and
using the combined power statistics for the estimation.

### Claim 4 (depends on 1)

A method according to claim 1, further comprising the steps of:
obtaining a preexisting configuration for one of the plants; and
modifying the preexisting configuration, comprising one of:
correcting the preexisting configuration based on the inferred configuration; and
replacing the preexisting configuration with the inferred configuration.

### Claim 5 (depends on 1)

A method according to claim 1, further comprising the steps of:
dividing the earlier time period into a plurality of individual time periods and segmenting the historical power production data according to the individual time periods;
simulating the power output production data for each of the hypothetical photovoltaic plant configurations using only the historical measured irradiance data within each of the individual time periods; and
for each of the individual time periods, inferring the configuration of each of the plants during that time period from the hypothetical photovoltaic plant configuration that exhibits a minimal error between the scaled simulated power output production data and the historical power production data for that plant within that individual time period.

### Claim 6 (depends on 5)

A method according to claim 5, further comprising the steps of:
detecting a mismatch between the inferred configurations of one of the plants for two or more of the time periods; and
modifying one or more of the hypothetical photovoltaic plant configurations based on the mismatch.

### Claim 7 (depends on 6)

A method according to claim 6, further comprising the step of:
selecting the configuration inferred for a most recent of the individual time periods as the inferred configuration of the plant with the mismatched configurations.

### Claim 8 (depends on 1)

A method according to claim 1, further comprising the steps of:
comparing the simulated power output production data for one or more of the hypothetical photovoltaic plant configurations to the simulated power output production data for the inferred configuration of one of the plants; and
proposing a change to the inferred configuration of the plant based on the comparison.

### Claim 9 (depends on 8)

A method according to claim 8, wherein the change comprises one or more of revising one or more of a tracking mode, azimuth, tilt, row-to-row spacing, tracking rotation limit, shading, and a degree to which one or more parameters of the configurations are varied.

### Claim 10 (depends on 1)

A method according to claim 1, wherein the simulated power output production data comprises a mean and a standard deviation of a power output for that hypothetical photovoltaic plant configuration.

### Claim 11

A computer-implemented method for probabilistically inferring operational specifications of a photovoltaic power generation system, comprising the steps of:
obtaining historical power production data measured over an earlier time period for and also a location of a photovoltaic power generation plant;
obtaining historical measured irradiance data over the earlier time period for the locations;
defining a plurality of hypothetical photovoltaic plant configurations that each comprise a power rating and operational features hypothesized for the plant;
simulating power output production data for each of the hypothetical photovoltaic plant configurations based on a normalized photovoltaic power generation plant using the historical measured irradiance data for the earlier time period, the simulated power output production data comprising a mean and a standard deviation of a power output for that hypothetical photovoltaic plant configuration;
deriving a simulated photovoltaic system rating as a function of the historical power production data and the simulated power output production data;
scaling the simulated power output production data by the simulated photovoltaic system rating over each point in the earlier time period;
inferring the plant's configuration from the hypothetical photovoltaic plant configuration that exhibits a minimal error between the scaled simulated power output production data and the historical power production data, wherein the steps are performed on a suitably-programmed computer.

### Claim 12 (depends on 11)

A method according to claim 11, further comprising the steps of:
dividing the earlier time period into a plurality of individual time periods and segmenting the historical power production data according to the individual time periods;
simulating the power output production data for each of the hypothetical photovoltaic plant configurations using only the historical measured irradiance data within each of the individual time periods; and
for each of the individual time periods, inferring the configuration of the plant during that time period from the hypothetical photovoltaic plant configuration that exhibits a minimal error between the scaled simulated power output production data and the historical power production data within that individual time period.

### Claim 13 (depends on 12)

A method according to claim 12, further comprising the steps of:
detecting a mismatch between the inferred configurations for the plant for two or more of the individual time periods; and
modifying one or more of the hypothetical photovoltaic plant configurations based on the mismatch.

### Claim 14 (depends on 13)

A method according to claim 13, further comprising the step of:
selecting the configuration inferred for a most recent of the individual time periods as the inferred configuration of the plant.

### Claim 15 (depends on 11)

A method according to claim 11, further comprising the steps of:
comparing the simulated power output production data for one or more hypothetical photovoltaic plant configurations to the simulated power output production data for the inferred configuration of the plant; and
proposing a change to the inferred configuration of the plant based on the comparison.

### Claim 16 (depends on 15)

A method according to claim 15, wherein the change comprises revising one or more of a tracking mode, azimuth, tilt, row-to-row spacing, tracking rotation limit, shading, and a degree to which one or more parameters of the configuration are varied.

### Claim 17 (depends on 11)

A method according to claim 11, wherein the plant is comprised in a photovoltaic power generation fleet comprising one or more additional photovoltaic power generation plants, comprising:
aggregating the inferred configuration and configurations of the additional plants into a configuration of the fleet; and
calculating irradiance statistics based on the irradiance data; and
estimating photovoltaic production data for the fleet based on the irradiance statistics and the inferred configuration of the fleet.

### Claim 18 (depends on 17)

A method according to claim 17, further comprising the steps of:
obtaining a preexisting configuration for the plant; and
modifying the preexisting configuration, comprising one of:
correcting the preexisting configuration based on the inferred configuration; and
replacing the preexisting configuration with the inferred configuration.

### Claim 19 (depends on 11)

A method according to claim 11, further comprising the steps of:
screening the historical power production data by eliminating data where observations are invalid either due to data recording issues or photovoltaic system performance issues power output; and
removing the historical measured irradiance data corresponding to each point of screened historical power production data.

### Claim 20 (depends on 11)

A method according to claim 11, further comprising the step of:
establishing a variance threshold and determining the variance between the scaled simulated power output production data and the historical power production data for each of the hypothetical photovoltaic plant configurations; and
evaluating the error between the scaled simulated power output production data and the historical power production data from which the variance is determined using an error measurement metric such as but not limited to relative mean absolute error or root mean square error,
wherein the hypothetical photovoltaic plant configuration corresponding to the scaled simulated power output production data exhibiting the least variance from the historical power production data also exhibits the minimal error.