# US 2014/0195289 A1 · Project plan generation from an information architecture model

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2014/0195289 A1
- Document ID: US20140195289A1
- Status: Published application
- Kind: A1
- Application number: 14/207,293
- Filed: 2014-03-12
- Published: 2014-07-10
- Earliest claimed: 2012-10-24
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Brian P. Byrne; Hayden Marchant; Lior Zimmerman
- Web page: https://patentgrep.com/patent/US20140195289A1

## CPC

- G06Q 10/06316: {Sequencing of tasks or work}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Provided are a computer implemented method, computer program product, and system for generating a project plan by creating an association between a development method in a hierarchy of development methods and an architectural element in a hierarchy of architectural elements in a computer-based model of a system, and providing a computer-based user interface configured to facilitate navigation between the development method and the associated architectural element.

## Claims

### Claim 1

A method, comprising:
creating, using a processor of a computer, an association between a development method in a hierarchy of development methods and an architectural element in a hierarchy of architectural elements in a computer-based model; and
providing a computer-based user interface configured to facilitate navigation between the development method and the associated architectural element.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising:
generating a task corresponding to the association between the development method and the architectural element, wherein the task is derived from the development method; and
generating a project plan in which the task is presented in association with the architectural element.

### Claim 3 (depends on 2)

The method according to claim 2, further comprising:
establishing interoperational linkage between a first computer-based tool that maintains the architectural element that is associated with the generated task and a second computer-based tool that maintains the project plan including the generated task and status information related to the generated task; and
using the interoperational linkage to facilitate presentation by the first computer-based tool of the generated task and the status information related to the generated task in association with the architectural elements.

### Claim 4 (depends on 2)

The method according to claim 2, further comprising:
establishing interoperational linkage between a first computer-based tool that maintains the architectural element that is associated with the generated task and a second computer-based tool that maintains the project plan including the generated task and status information related to the generated task; and
using the interoperational linkage to facilitate navigation from the architectural element as presented within a user interface of the first computer-based tool, to the generated task associated with the architectural element as presented within a user interface of the second computer-based tool.

### Claim 5 (depends on 2)

The method according to claim 2, wherein generating the project plan further comprises:
generating the project plan in which the task is presented in association with an ancestor of the architectural element in the hierarchy of architectural elements.

### Claim 6 (depends on 2)

The method according to claim 2, further comprising:
generating a descendant task corresponding to a descendant development method of the development method associated with the architectural element, wherein the task is derived from the descendant development method, and wherein generating the project plan comprises generating the project plan in which the descendant task is presented in association with the architectural element.

### Claim 7 (depends on 2)

The method according to claim 2, wherein generating the project plan further comprises:
generating the project plan in which any of the development methods in the hierarchy of development methods that a) lacks a direct association with any of the architectural elements in the hierarchy of architectural elements and b) is an ancestor of the development method from which the generated task is derived, is presented within the project plan in a hierarchical association with the generated task.