Assembled mud-rock flow debris dam and construction method thereof
AssigneeInstitute of Mountain Hazards and Environment, Chinese Academy of Sciences
InventorsXiaoqing Chen, Deji Li, Yong You, Peng Cui
Life of this patent
Estimating the term…
Loading patent…
AssigneeInstitute of Mountain Hazards and Environment, Chinese Academy of Sciences
InventorsXiaoqing Chen, Deji Li, Yong You, Peng Cui
Estimating the term…
A rapidly assembled debris flow sediment storage dam and a construction method are provided. The sediment storage dam has a main dam body with multiple prefabricated reinforced concrete rectangular boxes linked by vertical and horizontal connections. The top surface of each rectangular box is open, and the other five surfaces of the rectangular box are closed. Soil is used to fill each rectangular box. The main dam body is assembled above dam body foundations. Dam abutment foundations of the sediment storage dam and the inside slope of the dam body are filled with cement-laid stone masonry or concrete, while the top surface of the dam crest is also sealed using cement-laid stone masonry or concrete.
1-10. (canceled)
A rapidly assembled debris flow sediment storage dam, comprising:
A method for constructing an assembled debris flow sediment storage dam, the method comprising:
Dependencies are inferred from the claim text.