# US 2013/0284461 A1 · Steam Anti-Coning/Cresting Technology ( SACT) Remediation Process

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0284461 A1
- Document ID: US20130284461A1
- Status: Published application
- Kind: A1
- Application number: 13/889,775
- Filed: 2013-05-08
- Published: 2013-10-31
- Earliest claimed: 2011-07-13
- Assignees: Nexen Inc.
- Inventors: Richard Kelso Kerr; Peter Yang
- Web page: https://patentgrep.com/patent/US20130284461A1

## CPC

- E21B 43/24: using heat, e.g. steam injection
- E21B 43/32: Preventing gas- or water-coning phenomena, i.e. the formation of a conical column of gas or water around wells
- E21B 43/2408: {SAGD in combination with other methods}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A cyclic remediation process to restore oil recovery from a primary oil production well that has watered off from bottom water encroachment (cone or crest) whereby: (a) the primary oil production well has a produced water cut in excess of 95% (v/v); (b) the oil is heavy oil, with in-situ viscosity >1000 cp; wherein said process includes: (c) injecting a steam slug with a volume of 0.5 to 5.0 times the cumulative primary oil production, with steam volumes measured as water volumes; (d) shutting in the well for a soak period, after the steam injection is complete; and (e) producing the well until the water cut exceeds 95%.

## Claims

### Claim 1

A cyclic remediation process to restore oil recovery from a primary oil production well that has watered off from bottom water encroachment (cone or crest) whereby:
(a) the primary oil production well has a produced water cut in excess of 95% (v/v);
(b) the oil is heavy oil, with in-situ viscosity >1000 cp; wherein said process comprises:
(c) injecting a steam slug with a volume of 0.5 to 5.0 times the cumulative primary oil production, with steam volumes measured as water volumes;
(d) shutting in the well is for a soak period after the steam injection is complete; and
(e) producing the well until the water cut exceeds 95%.

### Claim 2 (depends on 1)

The process according to claim 1, where the primary oil production well has been previously steamed.

### Claim 3 (depends on 1)

The process according to claim 1, where the steam is injected using the existing primary oil production well.

### Claim 4 (depends on 1)

The process according to claim 1, where the steam is added using a separate well.

### Claim 5 (depends on 1)

The process according to claim 1, where the primary oil production well is a horizontal well and bottom water encroachment forms a water crest zone beneath the primary oil production well.

### Claim 6 (depends on 5)

The process according to claim 5, where the primary oil production well is not suitable for steam injection and several substantially parallel horizontal wells are linked with a separate substantially perpendicular horizontal well completed in the steam crest zone of each of the substantially parallel horizontal wells.

### Claim 7 (depends on 6)

The process according to claim 6, where the separate substantially perpendicular horizontal well is linked at or near the midpoint of the horizontal well lengths, in the crest zone.

### Claim 8 (depends on 1)

The process according to claim 1, where the heavy oil is bitumen (API <10; μ>100,000 cp).

### Claim 9

A cyclic remediation process to restore bitumen recovery from a bitumen production well that has watered off from bottom water encroachment (cone or crest) whereby:
(a) the bitumen production well has a produced water cut in excess of 70% (v/v);
(b) injecting a steam slug with a volume of 0.5 to 5.0 times the cumulative bitumen, with steam volumes measured as water volumes;
(c) shutting in the well for a soak period after the steam injection is complete; and
(d) producing the well until the water cut exceeds 70%, wherein bitumen is an in-situ hydrocarbon with <10 API gravity and >100,000 cp. in-situ viscosity.

### Claim 10 (depends on 9)

The process according to claim 9, where the bitumen production well is used for steam remediation injection.

### Claim 11 (depends on 9)

The process according to claim 9 where steam injection rates (measured as water) are 0.5 to 5.0 times fluid production rates when the primary well had watered off.

### Claim 12 (depends on 9)

The process according to claim 9 where steam quality at the steam injector well head is controlled between 50 and 100%.

### Claim 13 (depends on 9)

The process according to claim 9 where the well is shut in for a soak period of 1 to 10 weeks.