# US 2013/0284456 A1 · Wellhead Control Line Deployment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0284456 A1
- Document ID: US20130284456A1
- Status: Published application
- Kind: A1
- Application number: 13/922,678
- Filed: 2013-06-20
- Published: 2013-10-31
- Earliest claimed: 2010-05-13
- Assignees: Weatherford/Lamb, Inc.
- Applicants: Weatherford/Lamb, Inc.
- Inventors: Todd Travis; Eric Calzoncinth
- Web page: https://patentgrep.com/patent/US20130284456A1

## CPC

- E21B 33/047: for plural tubing strings
- E21B 33/0407: {with a suspended electrical cable}
- E21B 33/072: for cable-operated tools (E21B33/076 takes precedence)
- E21B 33/04: Casing heads; Suspending casings or tubings in well heads
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Wellhead control line deployment involves replacing the seat/retainer plate of a master valve of the wellhead with a modified retainer plate. The retainer plate defines a first port communicating from a central opening of the plate to outside the plate. A modified bonnet installs on the master valve, and the bonnet has two ports, one communicating with the first port in the retainer plate and the second communicating with a needle valve port. The communication ports are linked by a tube with outside diameter seals that inserts between the retainer plate and the bonnet. A control line hanger can be retained by locking into an adapter sleeve or directly in the back-pressure valve threads of a tubing hanger. The adapter sleeve can be attached to the retainer plate or have a collet to snap into the back-pressure valve threads of the tubing hanger.

## Claims

### Claim 1

A wellhead control line deployment apparatus supporting a control line below a valve mechanism of a wellhead and through a head adapter and a casing head of the wellhead, the apparatus comprising:
a wellhead component installing above the head adapter and the casing head on the wellhead, the wellhead component having a first bore and having at least one lock screw disposed in a side of the first bore, the wellhead component having a first port communicating the first bore outside the component; and
a control line hanger installing at least partially in the first bore of the wellhead component, the at least one lock screw engaging the control line hanger when installed therein, the control line hanger having
a hanger body defining a second bore from a first end to a second end, the hanger body having a second port with an inlet and an outlet, the inlet communicating with the first port on the component; and
a connector connected to the control line, the connector supported on the second end of the hanger body and connecting the outlet of the hanger body to the control line.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein the wellhead component comprises an adapter spool installed on the head adapter and supporting a master valve having the valve mechanism thereabove.

### Claim 3 (depends on 1)

The apparatus of claim 1, wherein the wellhead component comprises a master valve having the valve mechanism and installed on the head adapter.

### Claim 4 (depends on 1)

The apparatus of claim 1, wherein the control line hanger comprises first and second annular seals disposed thereabout, the first and second annular seals having the inlet of the second port disposed therebetween and engaging an internal wall of the first bore of the wellhead component.

### Claim 5 (depends on 1)

The apparatus of claim 1, wherein the wellhead component defines a first shoulder in the first bore, and wherein the tubular body defines a second shoulder engaging the first shoulder when installed in the wellhead component.

### Claim 6 (depends on 5)

The apparatus of claim 5, wherein the second shoulder is disposed thereabout between the first and second ends of the hanger body.

### Claim 7 (depends on 5)

The apparatus of claim 5, wherein the at least one lock screw engages the first end of the control line hanger.

### Claim 8 (depends on 1)

The apparatus of claim 1, wherein the hanger body defines a groove disposed between the first and second ends, the at least one lock screw engaging in the groove of the control line hanger installed in the wellhead component.

### Claim 9 (depends on 1)

The apparatus of claim 1, wherein the connector hangs the control line along an axis of the second bore and defines one or more flutes for communicating flow therethrough.

### Claim 10 (depends on 9)

The apparatus of claim 9, wherein the connector comprises a wet mate connector supported by fluted connector arms to the second end of the hanger body.

### Claim 11 (depends on 10)

The apparatus of claim 10, wherein the connector comprises a conduit connecting the outlet of the second port with the wet mate connector.

### Claim 12

A method of supporting a new control line at a wellhead to a downhole tool, the wellhead having a casing head, a head adapter, and a master valve disposed on top of one another, the method comprising:
removing the master valve from the head adapter of the wellhead;
installing a wellhead component on the head adapter of the wellhead, the wellhead component having a side port communicating a first internal bore outside the wellhead component;
connecting a control line to a control line hanger, the control line hanger having a second internal bore, the control line hanger communicating the control line to an inlet port on the control line hanger;
disposing the control line and the control line hanger in a through-bore of the wellhead;
landing the control line hanger at least partially in the wellhead component; and
communicating the inlet port of the control line hanger with the side port of the wellhead component.

### Claim 13 (depends on 12)

The method of claim 12, wherein landing the control line hanger at least partially in the wellhead component comprises engaging an external shoulder on the control line hanger on an internal shoulder of the first internal bore of the wellhead component.

### Claim 14 (depends on 12)

The method of claim 12, wherein landing the control line hanger at least partially in the wellhead component comprises engaging the control line hanger with a lock screw on the wellhead component.

### Claim 15 (depends on 14)

The method of claim 14, wherein engaging the control line hanger with the lock screw on the wellhead component comprises engaging an upper edge of the control line hanger or an external groove on the control line hanger with the lock screw.

### Claim 16 (depends on 12)

The method of claim 12, wherein landing the control line hanger at least partially in the wellhead component comprises engaging first and second annular seals disposed about the control line hanger above and below the inlet port against the first internal bore of the wellhead component.

### Claim 17 (depends on 12)

The method of claim 12, wherein installing the wellhead component on the head adapter of the wellhead comprises:
installing the wellhead component as an adapter spool on the head adapter of the wellhead, the adapter spool having the side port communicating the first internal bore outside the adapter spool; and
installing the master valve on the adapter spool.

### Claim 18 (depends on 12)

The method of claim 12, wherein installing the wellhead component on the head adapter of the wellhead comprises:
installing the wellhead component as a new mater valve on the head adapter of the wellhead, the new master valve having the side port communicating the first internal bore outside the new master valve.

### Claim 19 (depends on 12)

The method of claim 12, wherein connecting the control line to the control line hanger comprises supporting a wet mate connector with fluted connector arms to an end of the control line hanger.

### Claim 20 (depends on 19)

The method of claim 19, wherein connecting the control line to the control line hanger comprises connecting a conduit between the wet mate connector and an outlet port on the control line hanger.
