# US 2013/0284450 A1 · Drilling installation and offshore drilling vessel with drilling installation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0284450 A1
- Document ID: US20130284450A1
- Status: Published application
- Kind: A1
- Application number: 13/996,454
- Filed: 2011-12-20
- Published: 2013-10-31
- Earliest claimed: 2010-12-23
- Assignees: Itrec B.V.
- Inventors: Joop Roodenburg; Diederick Bernardus Wijning
- Web page: https://patentgrep.com/patent/US20130284450A1

## CPC

- E21B 19/143: {specially adapted for underwater drilling}
- E21B 15/02: specially adapted for underwater drilling (E21B15/04 takes precedence)
- E21B 19/002: {specially adapted for underwater drilling (E21B19/09, E21B19/143 take precedence)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A dual firing line drilling installation has a drilling tower main structure with four frameworks that are each over a major portion of their height U-shaped in horizontal cross-section. A four-sided central (11) space is present, and along each side of the central space one framework is arranged with its opened vertical side facing the central space. First and second storage devices (25,27) are provided for vertically storing drilling tubulars. The first storage device is housed in a first framework, the second storage device in a second framework. A first hoisting device is supported by a third framework of the drilling tower main structure, to manipulate a string of drilling tubulars in a first firing line (21). A second hoisting device is supported by a fourth framework to manipulate a string of drilling tubulars in a second firing line (23). A first and second pipe racker (29,31) are housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between a storage devices and a firing line.

## Claims

### Claim at position 1

1-22. (canceled)

### Claim 23

A dual firing line drilling installation for drilling a well, comprising:
a drilling tower main structure having four frameworks that are each over a major portion of their height U-shaped in horizontal cross-section, so that each of said frameworks has an opened vertical side, wherein a four-sided central space is present in the tower, and wherein along each side of the central space one of said four frameworks is arranged with opened vertical sides thereof facing the central space, the frameworks being interconnected to form said drilling tower main structure;
a first storage device for vertically storing drilling tubulars, said first storage device being housed in a first framework of the drilling tower main structure;
a second storage device for vertically storing drilling tubulars, said second storage device being housed in a second framework of the drilling tower main structure which is located generally opposite from the first framework of the drilling tower main structure;
a first hoisting device supported by a third framework of the drilling tower main structure, said first hoisting device being adapted to manipulate a string of drilling tubulars in a first firing line extending vertically within said third framework;
a second hoisting device supported by a fourth framework of the drilling tower main structure, said fourth framework being located generally opposite from the third framework of the drilling tower main structure, and said second hoisting device being adapted to manipulate a string of drilling tubulars in a second firing line extending vertically within said fourth framework;
a first pipe racker housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between at least one of the storage devices and at least the first firing line via said opened vertical sides of the respective frameworks; and
a second pipe racker housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between at least the second storage device and at least the second firing line via said opened vertical sides of the respective frameworks.

### Claim 24 (depends on 23)

The installation according to claim 23, wherein the first and second pipe racker are arranged in the central space.

### Claim 25 (depends on 23)

The installation according to claim 23, wherein the first pipe racker is configured to move drilling tubulars while in vertical orientation between each of the first and second storage devices and each of the first and second firing lines, and wherein the second pipe racker is configured to move drilling tubulars while in vertical orientation between each of the first and second storage devices and each of the first and second firing lines.

### Claim 26 (depends on 23)

The installation according to claim 23, wherein the first and second framework have a height that is less than the height of the third and fourth framework, and wherein a roof structure above the central space bridges the top ends of the first and second frameworks.

### Claim 27 (depends on 23)

The installation according to claim 23, wherein at least one of the third and fourth frameworks is provided with a vertically movable working floor having an opening therein for the string of drilling tubulars in the respective firing line.

### Claim 28 (depends on 27)

The installation according to claim 27, wherein the framework is provided with vertical guide elements to guide the vertically movable working floor.

### Claim 29 (depends on 23)

The installation according to claim 23, wherein at least one of the third and fourth frameworks is provided with one or more vertical guide elements and one or more trolleys that are movable along said guide elements, said one or more trolleys supporting a topdrive for rotary drive of a string of drilling tubulars and/or a travelling block for attaching a string of drilling tubular to the respective hoisting device.

### Claim 30 (depends on 28)

The installation according to claim 28, wherein the third and fourth framework each have a planar vertical side opposite the opened vertical side, and wherein the one or more vertical guide elements are mounted on said planar vertical side.

### Claim 31 (depends on 23)

The installation according to claim 23, wherein the drilling tower main structure supports a weather protective cladding on its exterior to protect the work space near the first and second firing line, the first and second storage devices, and the central space from environmental weather conditions.

### Claim 32 (depends on 31)

The installation according to claim 31, wherein the first and second hoisting devices each comprise a winch that is located in a separate room remote from the workspace near the first and second firing lines and the central space.

### Claim 33 (depends on 23)

The installation according to claim 23, wherein at least one of the third and fourth framework has a V-door opening to allow for the passage of drilling tubulars.

### Claim 34 (depends on 23)

The installation according to claim 23, wherein the first and second storage devices are rotary storage devices.

### Claim 35 (depends on 23)

The installation according to claim 23, wherein the first and second pipe rackers are moveably mounted in the drilling tower main structure, so as to have a first firing line operative position near the third framework so as to reach the first firing line, and a second firing line operative position near the fourth framework so as to reach the second firing line.

### Claim 36 (depends on 35)

The installation according to claim 35, wherein the first and second pipe rackers are mounted in a rotary pipe rackers structure arranged in the central space, said rotary pipe rackers structure allowing to bring each of the pipe rackers to a selected operative position.

### Claim 37 (depends on 35)

The installation according to claim 35, wherein each pipe racker is translatory movable along one or more associated tracks allowing to bring each of the pipe rackers in a selected operative position.

### Claim 38 (depends on 29)

The installation according to claim 29, wherein at least one trolley is provided with a travelling block, and wherein said trolley is movable to a retracted position away from the respective firing line.

### Claim 39 (depends on 23)

The installation according to claim 23, wherein each of the third and fourth frameworks comprises at least four vertical columns that are adapted to bear vertical loads resulting from the associated hoisting devices.

### Claim 40 (depends on 23)

The installation according to claim 23, wherein the tower main structure comprises at least one storage space for additional equipment next to the first or second firing line.

### Claim 41 (depends on 31)

The installation according to claim 31, wherein the storage space is located between the framework associated with said firing line and the protective cladding supported by said framework.

### Claim 42 (depends on 23)

An offshore drilling vessel comprising a drilling installation according to claim 23.

### Claim 43 (depends on 42)

The vessel according to claim 42, wherein the vessel has a first and second moonpool opening on opposed sides of a floor of the central space, said moonpool openings serving respectively to allow for passage of string of drilling tubulars or other equipment along the first and second firing lines, respectively.

### Claim 44 (depends on 42)

A method of drilling a well, comprising the step of using the vessel according to claim 42.

### Claim 45 (depends on 24)

The installation according to claim 24, wherein each pipe racker includes a vertical column member supporting one or more gripping members.

### Claim 46 (depends on 27)

The installation according to claim 27, wherein said working floor is movable between a lowered and a raised position that are at least 5 meters apart.

### Claim 47 (depends on 28)

The installation according to claim 28, wherein the vertical guide elements to guide the vertically movable working floor are rails.

### Claim 48 (depends on 29)

The installation according to claim 29, wherein the vertical guide elements to guide the one or more trolleys are rails.

### Claim 49 (depends on 34)

The installation according to claim 34, wherein the first and second storage device are rotary storage devices with a central rotatable vertical column and one or more fingerboards supported by the column, as well as with a drive motor for rotating the rotary storage device.

### Claim 50 (depends on 37)

The installation according to claim 37, wherein each pipe racker is translatory movable along a lower track and a top track at respectively the lower end and the top end of the pipe racker.

### Claim 51 (depends on 38)

The installation according to claim 38, wherein said trolley is movable to a retracted position away from the respective firing line while supporting the travelling block.

### Claim 52 (depends on 39)

The installation according to claim 39, wherein the at least four vertical columns are arranged in a rectangular arrangement.

### Claim 53 (depends on 40)

The installation according to claim 40, wherein the tower main structure comprises at least a storage space for a blow-out preventer (BOP).

### Claim 54 (depends on 43)

The vessel according to claim 43, wherein said moonpool openings lead to a common moonpool of the vessel.

### Claim 55 (depends on 43)

The vessel according to claim 43, wherein a mobile cart is arranged in said moonpool allowing to suspend a string of tubulars from said mobile cart and allowing to transfer said suspended string of tubulars from one firing line to the other firing line.
