# US 2013/0284442 A1 · Heat Treatment for Removal of Bauschinger Effect or to Accelerate Cement Curing

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0284442 A1
- Document ID: US20130284442A1
- Status: Published application
- Kind: A1
- Application number: 13/460,199
- Filed: 2012-04-30
- Published: 2013-10-31
- Earliest claimed: 2012-04-30
- Assignees: Baker Hughes Incorporated
- Inventors: Elisabeth Wilamowitz; Joerg Lehr
- Web page: https://patentgrep.com/patent/US20130284442A1

## CPC

- E21B 36/00: Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
- E21B 33/14: for cementing casings into boreholes
- E21B 36/008: {using chemical heat generating means}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Materials are delivered within an expanded string before the string is subsequently compressively loaded such that the heat given off by the reaction of the delivered materials raises the fluid temperature in the recently expanded string to temperatures in a range of about 150-300 degrees Centigrade. The materials can be separated for delivery and then allowed to contact to initiate the reaction. Alternatively the materials can be delivered in separate conveyances for more immediate start of the exothermic reaction at the needed location or locations. To the extent there is curing cement about the expanded tubular, then the heat generated also reduces curing time to full setup of the sealing material. The applied heat counteracts or eliminates the Bauschinger effect.

## Claims

### Claim 1

A completion method, comprising:
delivering a tubular string to a predetermined subterranean location;
expanding said string;
raising the temperature of well fluid at the subterranean location to a predetermined temperature;
reversing a Bauschinger effect from said expanding with said raising the temperature.

### Claim 2 (depends on 1)

The method of claim 1, comprising:
reducing differential compressive loading on said string from formation fluids at the subterranean location during said raising the temperature.

### Claim 3 (depends on 1)

The method of claim 1, comprising:
using an exothermic reaction for raising the temperature.

### Claim 4 (depends on 1)

The method of claim 1, comprising:
raising said temperature after said expanding.

### Claim 5 (depends on 1)

The method of claim 1, comprising:
accelerating the curing of a sealing material with said raising the temperature.

### Claim 6 (depends on 3)

The method of claim 3, comprising:
separating reactants that react exothermically when delivering said reactants to a predetermined location in said string.

### Claim 7 (depends on 6)

The method of claim 6, comprising:
pumping a spacer into said string between said reactants for said separation.

### Claim 8 (depends on 7)

The method of claim 7, comprising:
mixing said reactants with a static or dynamic mixer in said string.

### Claim 9 (depends on 6)

The method of claim 6, comprising:
using discrete delivery tubes to separate said reactants during delivery to the predetermined location in said string.

### Claim 10 (depends on 10)

The method of claim 10, comprising:
using coiled tubing with lower end wall perforations for said discrete delivery tubes.

### Claim 11 (depends on 5)

The method of claim 5, comprising:
placing said sealing material in an annular space about said tubular string before or after said expanding.

### Claim 12 (depends on 11)

The method of claim 11, comprising:
selecting a lower viscosity or density cement than would otherwise be selected due to said raising the temperature.

### Claim 13 (depends on 11)

The method of claim 11, comprising:
using cement as said sealing material;
disposing said cement between multiple walls that define said string.

### Claim 14

A completion method, comprising:
delivering a tubular string to a predetermined subterranean location;
sealing an annular space about said string with a sealing material whose curing rate is responsive to temperature;
raising the temperature of well fluid at the subterranean location to a predetermined temperature to accelerate said curing.

### Claim 15 (depends on 14)

The method of claim 14, comprising:
expanding said string;
using an exothermic reaction for said raising the temperature.

### Claim 16 (depends on 15)

The method of claim 15, comprising:
separating reactants that react exothermically when delivering said reactants to a predetermined location in said string.

### Claim 17 (depends on 16)

The method of claim 16, comprising:
pumping a spacer into said string between said reactants for said separation.

### Claim 18 (depends on 17)

The method of claim 17, comprising:
mixing said reactants with a static or dynamic mixer in said string.

### Claim 19 (depends on 16)

The method of claim 16, comprising:
using discrete delivery tubes to separate said reactants during delivery to the predetermined location in said string.

### Claim 20 (depends on 19)

The method of claim 19, comprising:
using coiled tubing with lower end wall perforations for said discrete delivery tubes.

### Claim 21 (depends on 14)

The method of claim 14, comprising:
placing said sealing material in an annular space about said tubular string before or after said expanding.

### Claim 22 (depends on 14)

The method of claim 14, comprising:
selecting a lower viscosity or density cement than would otherwise be selected due to said raising the temperature.

### Claim 23 (depends on 14)

The method of claim 14, comprising:
using cement as said sealing material;
disposing said cement between multiple walls that define said string.

### Claim 24 (depends on 16)

The method of claim 16, comprising:
reversing a Bauschinger effect from said expanding with said raising the temperature.
