# US 2013/0280777 A1 · Digester

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0280777 A1
- Document ID: US20130280777A1
- Status: Published application
- Kind: A1
- Application number: 13/820,874
- Filed: 2011-09-05
- Published: 2013-10-24
- Earliest claimed: 2010-09-06
- Assignees: ch4e Limited
- Inventors: Christopher Muir
- Web page: https://patentgrep.com/patent/US20130280777A1

## CPC

- C12M 21/04: {for producing gas, e.g. biogas (digesters for manure with production of biogas A01C3/028, biological treatment of water, waste water or sewage C02F3/00, C02F11/02, preparation of natural gas or syngas C10L3/06, C10L3/10)}
- C12M 23/42: {Integrated assemblies, e.g. cassettes or cartridges}
- C12M 23/44: {Multiple separable units; Modules}
- C12M 39/00: {Means for cleaning the apparatus or avoiding unwanted deposits of microorganisms (apparatus for cleaning laboratory receptacles or instruments B01L13/02; cleaning in general B08B)}
- Y02E 50/30: Fuel from waste, e.g. synthetic alcohol or diesel
- C12M: APPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; {APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS}
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The present invention relates to a digester (10) for a digester plant (1), comprising a digester tank (11) defining a digester tank chamber (62) and having a module opening (69) and a digester module (72) located in the module opening and extending into the digester tank chamber (62). The digester module is removably attached to the digester tank and comprises a heater (84) for heating material in the digester tank (11) together with at least one pipe (94; 96; 118) with an inlet (98; 108) and an outlet (102 104; 110; 122), one of which is inside the digester tank chamber 62 and the other of which is outside the digester tank chamber (62). Said at least one pipe may be: a supply pipe (94) for supplying material to the digester tank, the supply pipe having an inlet (98) outside the tank chamber and an outlet (102, 104) inside the tank chamber; a withdrawal pipe 96 for withdrawing material from the digester tank, the withdrawal pipe having an inlet 108 inside the tank chamber and an outlet (110) outside the tank chamber; or a gas withdrawal pipe (118) for withdrawing gas from the digester tank, the gas withdrawal pipe having an inlet inside the tank chamber and an outlet (122) outside the tank chamber.

## Claims

### Claim 1

A digester for a digester plant, comprising:
a digester tank defining a digester tank chamber and having a module opening;
a digester module located in the module opening and extending into the digester tank chamber, wherein the digester module is removably attached to the digester tank and comprises a heater for heating material in the digester tank and at least one pipe having an inlet and an outlet, one of said inlet and outlet being inside the tank chamber and the other of said inlet and outlet being outside the tank chamber.

### Claim 2 (depends on 1)

A digester according to claim 1, wherein said at least one pipe is selected from the group consisting of:
a supply pipe for supplying material to the digester tank, the supply pipe inlet being outside the tank chamber and the supply pip outlet being inside the tank chamber;
a withdrawal pipe for withdrawing material from the digester tank, the withdrawal pipe inlet being inside the tank chamber and the withdrawal pipe outlet being outside the tank chamber; and
a gas withdrawal pipe for withdrawing gas from the digester tank, the gas withdrawal pipe inlet being inside the tank chamber and the gas withdrawal pipe outlet being outside the tank chamber.

### Claim 3 (depends on 1, 2)

A digester according to claim 1 or 2, wherein the digester is or is configured to operate as an anaerobic digester.

### Claim 4

A digester according to any preceding claim, wherein the digester tank is sealable so as to prevent the egress of air into the tank during use.

### Claim 5

A digester according to any preceding claim, wherein the digester module comprises at least two of the supply pipe, the withdrawal pipe and the gas withdrawal pipe.

### Claim 6

A digester according to any preceding claim, wherein the digester module comprises the supply pipe, the withdrawal pipe and the gas withdrawal pipe.

### Claim 7

A digester according to any preceding claim, wherein the digester tank comprises two or more module openings, each module opening having a dedicated digester module located therein.

### Claim 8

A digester according to any preceding claim, wherein the outlet of the supply pipe is towards the top of the tank chamber.

### Claim 9

A digester according to any preceding claim, wherein the supply pipe comprises two outlets located inside the tank chamber.

### Claim 10

A digester according to any preceding claim, wherein the withdrawal pipe extends towards the bottom of the tank chamber and the inlet is towards the bottom of the tank chamber.

### Claim 11

A digester according to any preceding claim, wherein the inlet of the gas withdrawal pipe is towards the top of the tank chamber.

### Claim 12

A digester according to any preceding claim, wherein heater comprises a length of tube having a water inlet a water outlet outside the tank chamber.

### Claim 13 (depends on 12)

A digester according to claim 12, wherein the length of tube is coiled.

### Claim 14

A digester according any preceding claim, wherein the digester tank comprises a first flange and the digester module comprises a second flange, wherein the second flange is detachably attached to the first flange.

### Claim 15 (depends on 14)

A digester according to claim 14, wherein the supply pipe inlet and/or the withdrawal pipe outlet and/or the gas withdrawal pipe outlet is attached to the flange.

### Claim 16

A digester according to any preceding claim, wherein the digester module comprises a cage for protecting the supply pipe and/or the withdrawal pipe and/or the gas withdrawal pipe.

### Claim 17 (depends on 16)

A digester according to claim 16, wherein the cage comprises a mesh.

### Claim 18

A digester according to any preceding claim, wherein the supply pipe is operatively connected to a material dosing tank.

### Claim 19

A digester according to any preceding claim, wherein the supply pipe is operatively connected to a material hydrolysing tank.

### Claim 20

A digester according to any preceding claim, wherein the gas withdrawal pipe is operatively connected to a gas storage vessel.

### Claim 21

A module for use with the digester of any preceding claim.

### Claim 22 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20)

A digester plant comprising at least one digester in accordance with any of claims 1 to 20.

### Claim 23 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 22)

A digester plant according to claim 22 comprising a plurality of digesters, one, more than one, or all of said digesters being in accordance with any one of claims 1 to 20.

### Claim 24 (depends on 23)

A digester plant according to claim 23, wherein two or more of the plurality of digesters are connected to a controller or arranged to operate simultaneously, sequentially or with a lag between digestion starting in one digester and then being started in another digester.

### Claim 25 (depends on 22, 23, 24)

A digester plant according to any one of claims 22 to 24, wherein the digester plant consists of 2 to 10 digesters.

### Claim 26 (depends on 22, 23, 24, 25)

A digester plant according to any one of claims 22 to 25, wherein the digester plant comprises a feedstock hydrolysis tank that is operatively connected to the or each digester.

### Claim 27 (depends on 26)

A digester plant according to claim 26, wherein a filter or separator is provided in between the hydrolysis tank and the digester(s) to remove solids and any other undesirable substances from the hydrolysed feedstock before it is passed to the digester(s).

### Claim 28 (depends on 22, 23, 24, 25, 26, 27)

A digester plant according to any one of claims 22 to 27, wherein the digester plant comprises a feedstock dosing tank to temporarily store and then controllably feed the feedstock to the digester(s).

### Claim 29 (depends on 22, 23, 24, 25, 26, 27, 28)

A digester plant according to any one of claims 22 to 28, wherein the digester plant comprises at least one biogas store operatively connected to the digester(s) to receive and store biogas.

### Claim 30 (depends on 22, 23, 24, 25, 26, 27, 28, 29)

A digester plant according to any one of claims 22 to 29, wherein the digester plant comprises at least one generator operatively connected to the digester(s).

### Claim 31 (depends on 30)

A digester plant according to claim 30, wherein the generator is at least a 25 kWh generator set or larger.

### Claim 32 (depends on 30)

A digester plant according to claim 30, wherein the generator is a 25 to 150 kWh generator set.

### Claim 33

A method for digesting a biodegradeable material using a digester plant comprising one or more digesters, at least one of said digesters comprising:
a digester tank defining a digester tank chamber and having a module opening;
a digester module located in the module opening and extending into the digester tank chamber, wherein the digester module is removably attached to the digester tank and comprises a heater for heating biodegradeable material in the digester tank and at least one pipe having an inlet and an outlet, one of said inlet and outlet being inside the tank chamber and the other of said inlet and outlet being outside the tank chamber,
wherein the method comprises:
providing biodegradeable material in the digester tank chamber;
exposing the biodegradeable material in the digester tank chamber to bacteria capable of digesting the biodegradeable material to produce biogas;
operating the heater to heat the biodegradeable material; and
removing biogas produced by digestion of the biodegradeable material by the bacteria.

### Claim 34 (depends on 33)

A method according to claim 33, wherein the digester plant comprises a plurality of digesters and the method involves carrying out the method set out above within two or more of said plurality of digesters simultaneously, sequentially or with a lag between the time at which biodegradeable material in each digester tank is exposed to the bacteria.

### Claim 35 (depends on 34)

A method according to claim 34, wherein the method is effected under anaerobic conditions such that the method is an anaerobic digestion process.

### Claim 36 (depends on 33, 34, 35)

A method according to claim any one of claims 33 to 35, wherein the method is carried out under conditions to produce biogas at a substantially constant flow rate.

### Claim 37 (depends on 33, 34, 35, 36)

A method according to any one of claims 33 to 36, wherein the method is effected in the or each digester to produce biogas at a rate of at least around 2 m3 per hour.

### Claim 38 (depends on 33, 34, 35, 36)

A method according to any one of claims 33 to 36, wherein the method is effected in the or each digester to produce biogas at a rate of around 2 to 10 m3 per hour.

### Claim 39 (depends on 33, 34, 35, 36, 37, 38)

A method according to any one of claims 33 to 38, wherein the method is carried out under mesophilic conditions.

### Claim 40 (depends on 33, 34, 35, 36, 37, 38, 39)

A method according to any one of claims 33 to 39, wherein the biodegradeable material is exposed to bacteria in the digester tank chamber for up to around 50 days.

### Claim 41 (depends on 33, 34, 35, 36, 37, 38, 39, 40)

A method according to any one of claims 33 to 40, wherein the biodegradeable material is exposed to bacteria in the digester tank chamber for a time period of at least around 8 to 10 days.

### Claim 42 (depends on 33, 34, 35, 36, 37, 38, 39)

A method according to any one of claims 33 to 39, wherein the biodegradeable material is exposed to bacteria in the digester tank chamber for around 10 to 20 days.

### Claim 43 (depends on 33, 34, 35, 36, 37, 38, 39, 40, 41, 42)

A method according to any one of claims 33 to 42, wherein the method comprises hydrolysis of the biodegradeable material before it is provided in the digester.

### Claim 44 (depends on 43)

A method according to claim 43, wherein hydrolysis is effected at around 30 to 80° C.

### Claim 45 (depends on 43, 44)

A method according to claim 43 or 44, wherein hydrolysis is effected for up to around 7 days.

### Claim 46 (depends on 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45)

A method according to any one of claims 33 to 45, wherein the method further comprises filtering the hydrolysed biodegradeable material before providing it in the digester tank chamber.

### Claim 47 (depends on 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46)

A method according to any one of claims 33 to 46, wherein the method further comprises providing the biodegradeable material in a dosing tank from which can be controllably provided to the digester tank chamber.

### Claim 48 (depends on 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47)

A method according to any one of claims 33 to 47, wherein the method further comprises feeding the biogas removed from the digester tank chamber to a biogas store.

### Claim 49 (depends on 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48)

A method according to claims 33 to 48, wherein the biogas removed from the digester tank chamber is fed to a generator.

### Claim 50 (depends on 49)

A method according to claim 49, wherein the generator is operated to generate heat and a portion of the generated heat is returned to the digester tank chamber to heat further biodegradeable material in the digester tank chamber.

### Claim 51 (depends on 50)

A method according to claim 50, wherein the portion of heat returned may be at least 10 to 20%.