# US 2013/0277955 A1 · Tubular Beam with a Crimped Sleeve

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0277955 A1
- Document ID: US20130277955A1
- Status: Published application
- Kind: A1
- Application number: 13/451,920
- Filed: 2012-04-20
- Published: 2013-10-24
- Earliest claimed: 2012-04-20
- Assignees: Ford Global Technologies, LLC
- Inventors: David Anthony Wagner; Ari Garo Callskan; John Edward Huber; Yuksel Gur; Michael M. Azzouz; Jeffrey A. Wallace; Parameswararao Pothuraju; Sunil K. Kasaragod; Xiaoming Chen
- Web page: https://patentgrep.com/patent/US20130277955A1

## CPC

- B62D 27/023: {Assembly of structural joints}
- B62D 29/008: {predominantly of light alloys, e.g. extruded}
- F16B 17/004: {of rods or tubes mutually}
- F16B 11/008: {of tubular elements or rods in coaxial engagement}
- Y10T 29/49908: Joining by deforming
- B62D: MOTOR VEHICLES; TRAILERS (steering, or guiding on a desired track, of agricultural machines or implements A01B69/00; wheels, castors, axles, increasing wheel adhesion B60B; vehicle tyres, tyre inflation or tyre changing B60C; connections between vehicles of a train or the like B60D; vehicles for use on rail and road, amphibious or convertible vehicles B60F; suspension arrangements B60G; heating, cooling, ventilating or other air treating devices B60H; windows, windscreens, non-fixed roofs, doors or similar devices, protective coverings for vehicles not in use B60J; propulsion plant arrangements, auxiliary drives, transmissions, controls, instrumentation or dashboards B60K; electric equipment or propulsion of electrically-propelled vehicles B60L; power supply for electrically-propelled vehicles B60M; passenger accommodation not otherwise provided for B60N; adaptations for load transportation or to carry special loads or objects B60P; arrangement of signalling or lighting devices, the mounting or supporting thereof or circuits therefor, for vehicles in general B60Q; vehicles, vehicle fittings or vehicle parts not otherwise provided for B60R; servicing, cleaning, repairing, supporting, lifting, or manoeuvring, not otherwise provided for, B60S; brake arrangements, brake control systems or parts thereof B60T; air-cushion vehicles B60V; motor-cycles, accessories therefor B62J, B62K; testing of vehicles G01M)
- F16B: DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING (couplings for transmitting rotation F16D)
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

An aluminum tubular beam is assembled to a steel box frame rail with a steel sleeve. The sleeve is connected by a crimp joint or by a hem flange to the tubular beam. The steel sleeve may be effectively welded to the steel box frame rail to which it is assembled. An adhesive may be provided between the sleeve and the beam.

## Claims

### Claim 1

An assembly comprising:
an aluminum tubular beam;
a steel sleeve is assembled over the beam;
a crimp interlocks the sleeve to the beam to provide a sleeve/beam assembly;
a steel rail defines an opening that receives the sleeve/beam assembly; and
a weld secures the sleeve/beam assembly to the rail.

### Claim 2 (depends on 1)

The assembly of claim 1 further comprising an adhesive applied between the sleeve and the tubular beam.

### Claim 3 (depends on 1)

The assembly of claim 1 wherein the crimp is a band shaped crimped area.

### Claim 4 (depends on 1)

The assembly of claim 1 wherein the crimp is a spline shaped crimped area.

### Claim 5

An assembly comprising:
a tubular beam;
a sleeve is assembled over an end portion of the beam;
a hem flange secures the sleeve to the beam at the end portion of the beam to provide a sleeve/beam assembly;
a rail defines an opening that receives the sleeve/beam assembly; and
a weld secures the sleeve/beam assembly to the rail.

### Claim 6 (depends on 5)

The assembly of claim 5 wherein the hem flange further comprises a plurality of flanges formed on the sleeve that are formed to extend over an end of the tubular beam.

### Claim 7 (depends on 6)

The assembly of claim 6 wherein the sleeve includes a plurality of sides that are joined at a plurality of corners, and wherein the corners are removed from the sleeve to form the plurality of flanges.

### Claim 8 (depends on 5)

The assembly of claim 5 wherein the hem flange further comprises a plurality of flanges formed on the tubular beam that are formed to extend over an end of the sleeve.

### Claim 9 (depends on 8)

The assembly of claim 8 wherein the tubular component includes a plurality of sides that are joined at a plurality of corners, and wherein the corners are removed from the tubular beam to form the plurality of flanges.

### Claim 10 (depends on 5)

The assembly of claim 5 includes an adhesive bonding the sleeve to the tubular beam.

### Claim 11

A method of assembling a tubular component to a rail comprising:
assembling a sleeve formed from a first material to the tubular component formed from a second material that is different than the first material;
crimping the sleeve onto the tubular component by compressing the sleeve in a local area into the tubular component; and
welding the sleeve to the rail.

### Claim 12 (depends on 11)

The method of claim 11 wherein the rail is made from the first material.

### Claim 13 (depends on 11)

The method of claim 11 further comprising the step of applying an adhesive between the sleeve and the tubular component.

### Claim 14 (depends on 11)

The method of claim 11 wherein the sleeve extends outwardly from an end of the tubular component.

### Claim 15

A method of assembling a tubular component to a rail comprising:
assembling a sleeve formed from a first material over the tubular component formed from a second material that is different than the first material;
hemming the sleeve onto the tubular component by folding a flange of one of the sleeve and tubular component over the other of the sleeve and tubular component; and
welding the sleeve to the rail.

### Claim 16 (depends on 15)

The method of claim 15 further comprising applying an adhesive between the sleeve and the tubular component.

### Claim 17 (depends on 15)

The method of claim 15 further comprising forming a plurality of flanges on the sleeve that extend outboard from the tubular component before the hemming step and that are folded over an end of the tubular component to form a plurality of hem flanges.

### Claim 18 (depends on 15)

The method of claim 15 further comprising forming a plurality of flanges on the tubular component that extend outboard from the sleeve before the hemming step and that are folded over an end of the sleeve to form a plurality of hem flanges.

### Claim 19 (depends on 15)

The method of claim 15 wherein the tubular component includes a plurality of sides that are joined at a plurality of corners, and wherein the method further comprises removing the corners from the tubular component to form a plurality of flanges.

### Claim 20 (depends on 15)

The method of claim 15 wherein the sleeve includes a plurality of sides that are joined at a plurality of corners, and wherein the method further comprises removing the corners from the sleeve to form a plurality of flanges.
