# US 2013/0277115 A1 · Methods and systems of estimating formation parameters

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0277115 A1
- Document ID: US20130277115A1
- Status: Published application
- Kind: A1
- Application number: 13/995,604
- Filed: 2011-03-11
- Published: 2013-10-24
- Earliest claimed: 2011-03-11
- Assignees: Landmark Graphics Corporation
- Inventors: Martin D. Paulk
- Web page: https://patentgrep.com/patent/US20130277115A1

## CPC

- G01V 9/00: Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
- G01V 11/00: Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
- G01V 2210/66: Subsurface modeling
- G01V 2210/665: using geostatistical modeling
- G01V 2210/6652: Kriging
- G01V 2210/72: Real-time processing
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

Estimating formation parameters. At least some of the illustrative embodiments are methods including: combining a first plurality of actual logs from a first plurality of actual boreholes, at least one actual log associated with each actual borehole, and thereby creating a first equivalent log along a first equivalent path; combining a second plurality of actual logs from a second plurality of actual boreholes, at least one actual log of the second plurality of actual logs associated with each actual borehole of the second plurality of actual boreholes, and thereby creating a second equivalent log along a second equivalent path; and estimating a plurality of values of a parameter of one or more formations along a proposed borehole path, each value associated with a distinct depth along the proposed borehole path, the estimating using the equivalent logs.

## Claims

### Claim 1

A method comprising:
combining a first plurality of actual logs from a first plurality of actual boreholes, at least one actual log associated with each actual borehole, and thereby creating a first equivalent log along a first equivalent path;
combining a second plurality of actual logs from a second plurality of actual boreholes, at least one actual log of the second plurality of actual logs associated with each actual borehole of the second plurality of actual boreholes, and thereby creating a second equivalent log along a second equivalent path; and
estimating a plurality of values of a parameter of one or more formations along a proposed borehole path, each value associated with a distinct depth along the proposed borehole path, the estimating using the equivalent logs.

### Claim 2 (depends on 1)

The method of claim 1 further comprising:
drilling a new borehole along the proposed borehole path;
logging the new borehole while the new borehole is being drilled and thereby creating a new actual log; and
updating the estimate of the plurality of values along portions of the proposed borehole path yet to be drilled using the equivalent logs and the new actual log, thereby creating an updated estimate of the plurality of values.

### Claim 3 (depends on 2)

The method of claim 2 wherein updating the estimate further comprises updating in real time with the drilling.

### Claim 4 (depends on 2)

The method of claim 2 further comprising changing a drilling parameter based on the updated estimate of the plurality of values.

### Claim 5 (depends on 2)

The method of claim 2 further comprising predicting at least one drilling parameter from the updated estimate of the plurality of values, the updated drilling parameter being at least one selected from the group consisting of: revolutions per minute of the drill bit; desired weight-on-bit; and time to drill at least a portion of a borehole along the proposed borehole path.

### Claim 6 (depends on 1)

The method of claim 1 wherein estimating the plurality of values further comprises kriging to determine at least one value, the kriging using values from the first and second equivalent logs.

### Claim 7 (depends on 1)

The method of claim 1 wherein combining the first plurality of actual logs further comprises:
selecting, for each actual borehole of the first plurality of actual boreholes, depths corresponding to different formation types traversed by each actual borehole of the first plurality of actual boreholes, the selecting based on an actual log for each actual borehole, and the selecting creates selected depths;
determining depth locations in the first equivalent path from the selected depths from the first plurality of actual boreholes; and
calculating values of the first equivalent log at each selected depth using values of the first plurality of actual logs.

### Claim 8 (depends on 7)

The method of claim 7 wherein calculating values of the first equivalent log further comprises kriging to determine at least one value of the first equivalent log, the kriging using values from the plurality of actual logs.

### Claim 9

A method comprising:
combining a plurality of actual logs taken in a respective plurality of actual boreholes, and thereby creating a first equivalent log along a proposed borehole path;
drilling a new borehole along the proposed borehole path;
logging the new borehole while the new borehole is being drilled and thereby creating a new actual log; and
updating the equivalent log along portions of the proposed borehole yet to be drilled using the equivalent log and the new actual log, thereby creating an updated equivalent log.

### Claim 10 (depends on 9)

The method of claim 9 wherein updating further comprises updating in real time with the drilling.

### Claim 11 (depends on 9)

The method of claim 9 further comprising predicting at least one drilling parameter from the updated equivalent log.

### Claim 12 (depends on 11)

The method of claim 11 wherein predicting at least one drilling parameter further comprises predicting at least one selected from the group consisting of: revolutions per minute of the drill bit; desired weight-on-bit; and time to drill at least a portion of the borehole along the proposed borehole path.

### Claim 13 (depends on 9)

The method of claim 9 wherein combining the plurality of actual logs further comprises:
selecting, for each actual borehole of the first plurality of actual boreholes, depths corresponding to different formation types traversed by the actual borehole, the selecting based on one or more actual logs of each actual borehole;
determining depth locations in the proposed borehole path from the selected depths from the first plurality of actual boreholes; and
calculating the equivalent log at each selected depth using values of the plurality of actual logs.

### Claim 14 (depends on 13)

The method of claim 13 wherein calculating values of the equivalent log further comprises kriging to determine at least one value of the equivalent log, the kriging using values from the plurality of actual logs.

### Claim 15

A system comprising:
a logging tool being part of a drill string, the drill string comprising a drill bit and the drill string located in borehole;
a processor associated with the logging tool;
a memory coupled to the processor, the memory storing a program that, when executed by the processor, causes the processor to:
receive data determined by the logging tool while drilling, the data indicative of a parameter of a formation penetrated by the borehole; and
estimate, in real time with the drilling by the drill string, a property of a portion of the formation along a proposed borehole path yet to be drilled, the estimation of the property using data from the logging tool and an equivalent log along an equivalent path.

### Claim 16 (depends on 15)

The system of claim 15 wherein when the program estimates, the program causes the processor to estimate using the equivalent log along the equivalent path where at least a portion of the equivalent path coincides with a proposed borehole path.

### Claim 17 (depends on 15)

The system of claim 15 wherein when the program estimates, the program causes the processor to estimate using the equivalent log along the equivalent path where the equivalent path is offset from a proposed borehole path.

### Claim 18 (depends on 15)

The system of claim 15 wherein when the program estimates, the program causes the processor to estimate using a plurality of equivalent logs associated with a respective plurality of equivalent paths, each equivalent path offset from a proposed borehole path.

### Claim 19 (depends on 15)

The system of claim 15 wherein the processor and memory are disposed in the drill string.

### Claim 20 (depends on 15)

The system of claim 15 wherein the processor and memory are disposed at the surface, and the data determined by the logging tool is sent to the surface.

### Claim 21 (depends on 15)

The system of claim 15 wherein the drill string is at least one selected from the group consisting of: a drill string where rotary motion is imparted to the drill string from the surface; a drill string where rotary motion is imparted to the drill string by way of a down-hole mud motor.
