# US 2013/0268501 A1 · System and method for monitoring distributed asset data

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2013/0268501 A1
- Document ID: US20130268501A1
- Status: Published application
- Kind: A1
- Application number: 13/442,817
- Filed: 2012-04-09
- Published: 2013-10-10
- Earliest claimed: 2012-04-09
- Assignees: Mitek Analytics LLC
- Inventors: Dimitry Gorinevsky
- Web page: https://patentgrep.com/patent/US20130268501A1

## CPC

- G06Q 10/0639: Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q 10/20: Administration of product repair or maintenance
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A computer-based monitoring system and monitoring method implemented in computer software for detecting, estimating, and reporting the condition states, their changes, and anomalies for many assets. The assets are of same type, are operated over a period of time, and outfitted with data collection systems. The proposed monitoring method accounts for variability of working conditions for each asset by using regression model that characterizes asset performance. The assets are of the same type but not identical. The proposed monitoring method accounts for asset-to-asset variability; it also accounts for drifts and trends in the asset condition and data. The proposed monitoring system can perform distributed processing of massive amounts of historical data without discarding any useful information where moving all the asset data into one central computing system might be infeasible. The overall processing is includes distributed preprocessing data records from each asset to produce compressed data.

## Claims

### Claim 1

A system for monitoring a plurality of assets, the system comprising: at least one Local Computing Elements and a Central Computing Element, wherein:
a. each of the plurality assets generating asset data for monitoring;
b. each of the at least one Local Computing Elements is connected to a Local Data Repository receiving and storing the asset data as individual data records;
c. each of the at least one Local Computing Elements is connected to the Central Computing Element through a data link;
d. each of the at least one Local Computing Elements pre-processes the individual data records in the Local Data Repository to produce compressed data, the compressed data being transmitted over the data link to the Central Computing Element;
e. each of the individual data records being pre-processed separately and independently to produce the compressed data;
f. the Central Computing Element collects, stores, and post-processes the compressed data from all Local Computing Elements to obtain monitoring reporting data, the monitoring reporting data being displayed or transmitted by the Central Computing Element as the monitoring system output; and
g. the monitoring reporting data is computed based on a result of an optimal estimation of the asset monitoring data; the monitoring reporting data computed by the Central Computing Element using compressed data from all the Local Computing Elements being the same as if all the asset monitoring data were simultaneously available and used for the optimal estimation.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the regression fit of the asset monitoring data is based on a multi-level regression model with fixed effects describing asset-to-asset variability and data record-to-data record trends.

### Claim 3 (depends on 1)

The system according to claim 1, wherein the pre-processing of the monitoring data generated by each asset comprises computing time series of regression variable vectors, each regression variable vector comprising one or more dependent variables and one or more regressors variables.

### Claim 4 (depends on 3)

The system according to claim 3, wherein the data record pre-processing comprises calculating an empirical covariance matrix for the regression variable vector from the data record and the compressed data include the empirical covariance matrixes.

### Claim 5 (depends on 1)

The system according to claim 1, wherein the coordinated data processing is performed incrementally, by updating intermediate processing state data and wherein the monitoring reporting data are computed based on the intermediate processing state data.

### Claim 6 (depends on 1)

The system according to claim 1, wherein the assets comprise at least one of: manufacturing tools, machines, power systems, propulsion systems, ground vehicles, aircraft, marine vehicles, weapon systems, structural assets, building assets, production and service plant assets, assets in power, water and waste treatment facilities, distribution network assets, communication network assets, IT system assets and transport system assets.

### Claim 7 (depends on 1)

The system according to claim 1, wherein the monitoring reporting data computed by the Central Computing Element comprise the results of at least one of: anomaly detection, fault isolation, and trend forecasting for the plurality of the monitored assets.

### Claim 8

A method for monitoring a plurality of assets, the method being performed in a system comprising at least one Local Computing Elements and a Central Computing Element, the method comprising:
a. generating, by each of the plurality assets, asset data for monitoring;
b. receiving and storing the asset data by a Local Data Repository as individual data records, wherein each of the at least one Local Computing Elements is connected to the Local Data Repository and wherein each of the at least one Local Computing Elements is connected to the Central Computing Element through a data link;
c. pre-processing by each of the at least one Local Computing Elements the individual data records in the Local Data Repository to produce compressed data, wherein each of the individual data records are being pre-processed separately and independently to produce the compressed data;
d. transmitting the compressed data over the data link to the Central Computing Element;
e. collecting, storing, and post-processing by the Central Computing Element the compressed data from all Local Computing Elements to obtain monitoring reporting data, the monitoring reporting data being displayed or transmitted by the Central Computing Element as the monitoring system output; and
f. computing the monitoring reporting data based on a result of an optimal estimation of the asset monitoring data; the monitoring reporting data computed by the Central Computing Element using compressed data from all the Local Computing Elements being the same as if all the asset monitoring data were simultaneously available and used for the optimal estimation.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the regression fit of the asset monitoring data is based on a multi-level regression model with fixed effects describing asset-to-asset variability and data record-to-data record trends.

### Claim 10 (depends on 8)

The method according to claim 8, wherein the pre-processing of the monitoring data generated by each asset comprises computing time series of regression variable vectors, each regression variable vector comprising one or more dependent variables and one or more regressors variables.

### Claim 11 (depends on 10)

The method according to claim 10, wherein the data record pre-processing comprises calculating an empirical covariance matrix for the regression variable vector from the data record and the compressed data include the empirical covariance matrixes.

### Claim 12 (depends on 8)

The method according to claim 8, wherein the coordinated data processing is performed incrementally, by updating intermediate processing state data and wherein the monitoring reporting data are computed based on the intermediate processing state data.

### Claim 13 (depends on 8)

The method according to claim 8, wherein the assets comprise at least one of: manufacturing tools, machines, power systems, propulsion systems, ground vehicles, aircraft, marine vehicles, weapon systems, structural assets, building assets, production and service plant assets, assets in power, water and waste treatment facilities, distribution network assets, communication network assets, IT system assets and transport system assets.

### Claim 14 (depends on 8)

The method according to claim 8, wherein the monitoring reporting data computed by the Central Computing Element comprise the results of at least one of: anomaly detection, fault isolation, and trend forecasting for the plurality of the monitored assets.

### Claim 15

A non-transitory computer-readable medium embodying a set of instructions, which, when executed by one or more processors of a system comprising at least one Local Computing Elements and a Central Computing Element, cause the one or more processors to perform a method for monitoring a plurality of assets, the method comprising:
a. generating, by each of the plurality assets, asset data for monitoring;
b. receiving and storing the asset data by a Local Data Repository as individual data records, wherein each of the at least one Local Computing Elements is connected to the Local Data Repository and wherein each of the at least one Local Computing Elements is connected to the Central Computing Element through a data link;
c. pre-processing by each of the at least one Local Computing Elements the individual data records in the Local Data Repository to produce compressed data, wherein each of the individual data records are being pre-processed separately and independently to produce the compressed data;
d. transmitting the compressed data over the data link to the Central Computing Element;
e. collecting, storing, and post-processing by the Central Computing Element the compressed data from all Local Computing Elements to obtain monitoring reporting data, the monitoring reporting data being displayed or transmitted by the Central Computing Element as the monitoring system output; and
f. computing the monitoring reporting data based on a result of an optimal estimation of the asset monitoring data; the monitoring reporting data computed by the Central Computing Element using compressed data from all the Local Computing Elements being the same as if all the asset monitoring data were simultaneously available and used for the optimal estimation.

### Claim 16 (depends on 15)

The non-transitory computer-readable medium according to claim 15, wherein the regression fit of the asset monitoring data is based on a multi-level regression model with fixed effects describing asset-to-asset variability and data record-to-data record trends.

### Claim 17 (depends on 15)

The non-transitory computer-readable medium according to claim 15, wherein the pre-processing of the monitoring data generated by each asset comprises computing time series of regression variable vectors, each regression variable vector comprising one or more dependent variables and one or more regressors variables.

### Claim 18 (depends on 17)

The non-transitory computer-readable medium according to claim 17, wherein the data record pre-processing comprises calculating an empirical covariance matrix for the regression variable vector from the data record and the compressed data include the empirical covariance matrixes.

### Claim 19 (depends on 15)

The non-transitory computer-readable medium according to claim 15, wherein the coordinated data processing is performed incrementally, by updating intermediate processing state data and wherein the monitoring reporting data are computed based on the intermediate processing state data.

### Claim 20 (depends on 15)

The non-transitory computer-readable medium according to claim 15, wherein the assets comprise at least one of: manufacturing tools, machines, power systems, propulsion systems, ground vehicles, aircraft, marine vehicles, weapon systems, structural assets, building assets, production and service plant assets, assets in power, water and waste treatment facilities, distribution network assets, communication network assets, IT system assets and transport system assets.
